The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A significant reduction in carbon emissions is a global mission and the construction industry has an indispensable role to play as a major carbon dioxide (CO2) generator. Over the years, various building environmental assessment (BEA) models and concepts have been developed to promote environmentally responsible design and construction. However, limited attention has been placed on assessing and benchmarking the carbon emitted throughout the lifecycle of building facilities. This situation could undermine the construction industry’s potential to reduce its dependence on raw materials, recognise the negative impacts of producing new materials, and intensify the recycle and reuse process. In this paper, current BEA approaches adopted by the construction industry are first introduced. The focus of these models and concepts is then examined. Following a brief review of lifecycle analysis, the boundary in which a lifecycle carbon emission analysis should be set for a construction project is identified. The paper concludes by highlighting the potential barriers of applying lifecycle carbon emissions analysis in the construction industry. It is proposed that lifecycle carbon emission analysis can be integrated with existing BEA models to provide a more comprehensive and accurate evaluation on the cradle-to-grave environmental performance of a construction facility. In doing so, this can assist owners and clients to identify the optimum solution to maximise emissions reduction opportunities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The skill shortage issues have long existed in the construction industry in countries like Australia. Couple this with the lead and lag time between market demand and resultant supply has traditionally seen cyclical fluctuation of skills demand within the construction industry. Skills demand and shortages are generally well documented and can even have a level of predictability in Australia given the tendency to have a delayed reaction to global economic downturns. Sustainability issues in the construction industry have attracted growing public awareness. Traditionally driven by ever increasing, if only gradual, mandated minimum requirements, drive towards sustainable developments is now increasingly being created by the client. As this demand increases, accordingly a demand for people with the skills to provide these services should be felt. This research examines the green skill shortage issues within the context of construction industry. Stakeholders from across relevant sectors of the built environment were engaged to ascertain the industry’s utilisation and demand for ‘green skilled’ personnel. These findings will assist stakeholders within the construction industry in negating the effects of a skills shortage in the event of accelerated demand for sustainable construction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.