990 resultados para Construção civil - Brasil
Resumo:
This paper prese nts the validation of the Performance Indicator System for Projects under Construction - SIDECC. The goal was to develop a system of performance indicators from the macroergonômica approach, con sidering criteria of usefulness , practicality and applicabilit y and the concept of continuous improveme nt in the construction industry . The validation process SIDECC consisted of three disti nct models . Modeling I corresponded to the theoretical development and valid ation of a system of indicators . Modeling II concern s the development and valida tion of multi - indicator system . For this modeling, we used the Mother of Use and Importance and Multivariate Analysis . Modeling III correspo nded to the validation situated , which consisted of a case study of a wo rk of construct ion of buildings , which were applied and anal yzed the results of modeling II . This work resulted in the development of an applied and tested for the construction of an integrated system of per formance indicators methodology , involving aspects of production , quality , e nvironmental, health and safety . It is inferred that the SIDECC can be applied, in full or in part , the construction companies as a whole, as we ll as in other economic sectors .
Resumo:
The meaning of work is a construct that has been studied more systematically from the 80s, through various approaches and in different occupational categories. This dissertation aims to describe and discuss the meanings of work for construction workers. This is an empirical study whose research supports herself in the Model Attributes Meaning of Work and its respective instrument for measuring the Meaning of Work Inventory (STI). The research involved 402 workers in the construction industry sector in the two capitals of the Brazilian Northeast, with a mean age of 35.8 years (SD = 11.4). To collect the data, besides the IST, the Working Conditions Questionnaire and sociodemographic data were also used. Data were organized and analyzed using the SPSS program. The study used data analysis techniques to Smallest Space Analisys (SSA), descriptive statistics, correlation and analysis of variance. There was evidence of validity of the STI which was structured into five types of value attributes (what work should be), and seven types of descriptive attributes (what is working). The results showed that the work has high centrality and profiling for participants after the family, the most important aspect in the lives of workers. Aspects of personal and economic growth were more emphasized in definition of what the work should be and responsibility and effort were characteristics that best described the reality of work.
Resumo:
The use of composite materials for the construction industry has been the subject of numerous scientific papers in Brazil and in the world. One of the factors that motivate this quest is the housing deficit that countries especially the third world face. In Brazil this deficit reaches more than 6.5 million homes, around 12% of all US households . This paper presents a composite that was obtained from waste generated in processes for the production of granite and marble slabs, cement, gypsum, sand, crushed EPS and water. These wastes cause great damage to the environment and are thrown into landfi lls in bulk. The novelty of the work is in the combined study thermal, mechanical and acoustic composite obtained in real situation of rooms that are part of an experimental housing. Many blocks were made from cement compositions, plaster, foam, sand, marb le and / or granite, preliminary tests of mechanical and thermal resistance were made by choosing the most appropriate proportion. Will be given the manufacturing processes and assembly units 500 units 10 x 80 x 28 cm produced for the construction of an ex perimental home. We studied what kind of block and residue, marble or granite, made it more feasible for the intended purpose. The mechanical strength of the produced blocks were above 3.0 MPa. The thermal resistance of the blocks was confirmed by the maxi mum temperature difference between the inner and outer walls of rooms built around 8.0 ° C. The sound absorption for optimal room was around 31%. Demonstrated the feasibility of using the blocks manufactured with composite material proposed for construction.
Resumo:
The strategy research have been widespread for many years and, more recently, the process of formation of the strategies in the individual perspective has also gained attention in academia. Confirming this trend, the goal of this study is to discuss the process of formation of the strategies from an individual perspective based on the three dimensions of the strategic process (change, thinking and formation) proposed by De Wit and Meyer (2004). To this end, this exploratory-descriptive study used the factor analysis techniques, non-parametric correlation and linear regression to analyze data collected from the decision makers of the 93 retail in the industry of construction supplies in the Natal and metropolitan area. As a result, we have that the formation factors of the dimensions investigated were identified in the majority, thus confirming the existence of paradoxes in the strategic process, and that there is a relationship between logical thinking and deliberate formation with the hierarchical level of decision makers.
Resumo:
The rapid population growth is the great motivator for the development of the construction industry and the increased demand for drinking water, resulting in a gradual increase in the generation of solid waste. Thus, this work was carried out in order to recycle industrial and municipal wastes incorporating them into materials for civil construction. The composite produced from water treatment sludge and marble polishing mud, applying lime production waste as a binder, was evaluated for its mechanical performance and its morphological structure. The raw materials were characterized for their chemical composition, mineralogy, morphology, particle size and also the moisture content. With the featured materials nine compositions have been developed varying the content of the water treatment sludge between 25 to 50%, marble polishing mud between 35 to 50% and the lime production waste between 10 to 30%. The composites were subjected to mechanical strength tests, water absorption, chemical and mineralogical composition and morphology. The developed materials presented, on the 3rd day of hydration, maximum strength value of 4.65 MPa, the 7th day 6.36 MPa, on the 14th day 6.74 MPa, the 28th day 5.98 MPa, on the 60th day 8.52 MPa at 90th day 11.75 MPa and 180th day 12.06 MPa. The water absorption values after 28 days of hydration ranged from 16.27% to 26.32% and after 90 days, from 13.57% to 23.56%.
Resumo:
The job security issue is crucial for the development of construction due to the need to ensure the health of workers, which is done by means of laws and production management. Thus, among various other laws, was enacted NR-18, in order to ensure the worker's minimum conditions for the development work. Despite legislative developments on the subject, they have become ineffective against the excessive number of accidents in the construction industry, bringing the company to greater in ensuring the health and safety of its workers. In view of this need for improvement of working environment in a general appearance, both for purposes of ensuring the law obedience as comfort for workers and quality of the organization, the System Health Management and Safety (OHSMS) is a valid tool demonstrates the evolution of business management, as well as OHSAS 18001 which proposes to ensure the efficiency and integration of a system geared to safety and health at work by means of implements and adaptations of it, in order to bring significant improvements to conditions of work, especially in the form of a new culture to be adopted by the company. Addressing the problem, this paper aims to develop a management system by OHSAS 18001 which is consistent with the terms of NR-18 as it is this integration of OHSMS Management System of the company as a usual practice of that aims at an improvement of work safety in the business of Buildings.
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação em Arquitetura e Urbanismo, 2015.
Resumo:
Revista Lusófona de Arquitectura e Educação
Resumo:
O presente relatório diz respeito ao estágio por mim realizado na empresa de construção HCI, no âmbito do 2º Ano do Mestrado em Engenharia Civil – ISEL, e procura descrever sumariamente e de forma clara o trabalho desenvolvido no período em que o mesmo decorreu (9 de Março de 2009 e 9 de Setembro de 2009). Durante os 6 meses de estágio surgiram várias oportunidades de estar e colaborar com os diferentes sectores que constituem uma empresa de construção. Nomeadamente no que diz respeito ao trabalho de planeamento e execução de obras, desenvolvido na sede/escritório da empresa, e trabalho desenvolvido em campo, tratando-se, neste caso, da Fase II da Obra Center for the Unknown, da Fundação Champalimaud, um centro de investigação que pretende desenvolver estudos inovadores na área da Oncologia. Indo ao encontro dos meus objectivos profissionais, com a realização deste estágio e elaboração do presente trabalho pude consolidar os conhecimentos aprendidos em ambiente académico, bem como adquirir novas aprendizagens, fundamentais para o crescimento do saber no sentido de acompanhar uma área em constante mudança.