926 resultados para Colombian literature
Resumo:
This research aims to improve the economic and environmental sustainability of the construction & demolition waste and precast concrete supply chains through the development, trial and evaluation of an innovative public sector supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic and environmental sustainable markets.
Resumo:
There are many studies that reveal the nature of design thinking and the nature of conceptual design as distinct from detailed or embodiment design. The results can assist in our understanding of how the process of design can be supported and how new technologies can be introduced into the workplace. Existing studies provide limited information about the nature of collaborative design as it takes place on the ground and in the actual working context. How to provide appropriate and effective of support for collaborative design information sharing across companies, countries and heterogeneous computer systems is a key issue. As data are passed between designers and the computer systems they employ, many exchanges are made. These exchanges may be used to establish measures of the benefits that new support systems can bring. Collaboration support tools represent a fast growing section of the commercial software market place and a reasonable range of products are available. Many of them offer significant application to design for the support of distributed meetings by the provision of video and audio communications and the sharing of information, including collaborative sketching. The tools that specifically support 3D models and other very design specific features are less common and many of those are in prototype stages of development. A key question is to find viable ways of combining design information visualisation support with the collaboration support technologies that can be seen today. When collaborating, different views will need to be accessible at different times to all the collaborators. The architects may want to explain some ideas on their model, the structural engineers on their model and so on. However, there are issues of ownership when the structural engineer wants to manipulate the architect’s model and vice versa. The modes of working, synchronous or asynchronous may have a bearing as in a synchronous session there is control of what is happening.
Resumo:
Recent developments in networked three dimensional (3D) virtual worlds, and the proliferation of high bandwidth communications technology, have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a construction project in which the models for the project are developed and revised. The project investigates three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology. The third aspect of the project, listed above, led by the University of Newcastle, explores the domain of People and the extent to which they contribute to the effectiveness of virtual teams. This report relates, primarily, to this aspect.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption barriers peculiar to the nature of construction. This paper examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of barriers (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this paper. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major barriers were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 barriers were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that barriers to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.
Resumo:
The literature and anecdotal evidence suggests that that there is more to tenancy selection (firm location) than the profit maximisation drive that traditional neo-classical economic location theory suggests. In the first instance these models assume property markets are rational and perfectly competitive; the CBD office market is clearly neither rational nor perfectly competitive. This fact alone relegates such models to the margins of usefulness for an industry that seeks to satisfy tenant demand in order to optimise returns on capital invested. Acknowledgment of property market imperfections are universally accepted to the extent that all contemporary texts discuss the lack of a coherent centralised market place and incomplete and poorly disseminated information processes as fundamental inadequacies which characterise the property market inefficiencies. Less well researched are the facets of the market which allow the observer to determine market activity to be significantly irrational. One such facet is that of ‘decision maker preferences’. The decision to locate a business operation at one location as opposed to another seems ostensibly a routine choice based on short, medium and long term business objectives. These objectives are derived from a process of strategic planning by one or more individuals whose goal is held to be to optimise outcomes which benefit the business (and presumably those employed within it). However the decision making processes appear bounded by how firms function, the institutional context in which they operate, as well as by opportunistic behaviour by individual decision makers who allow personal preferences to infiltrate and ‘corrupt’ the process. In this way, history, culture, geography, as well as institutions all become significant to the extent that these influence and shape individual behaviour which in turn determine the morphology of individual preferences, as well as providing a conduit for them to take effect. This paper exams historical and current literature on the impact of individual behaviour in the decision making process within organisations as a precursor to an investigation of the tenancy decision making process within the CBD office market. Literature on the topic falls within a number of research disciplines, philosophy, psychology and economics to name a few.
Resumo:
The full economic, cultural and environmental value of information produced or funded by the public sector can be realised through enabling greater access to and reuse of the information. To do this effectively it is necessary to describe and implement a policy framework that supports greater access and reuse among a distributed, online network of information suppliers and users. The objective of this study was to identify materials dealing with policies, principles and practices relating to information access and reuse in Australia and in other key jurisdictions internationally. Open Access Policies, Practices and Licensing: A review of the literature in Australia and selected jurisdictions sets out the findings of an extensive review of published materials dealing with policies, practices and legal issues relating to information access and reuse, with a particular focus on materials generated, held or funded by public sector bodies. The report was produced as part of the work program of the project “Enabling Real-Time Information Access in Both Urban and Regional Areas”, established within the Cooperative Research Centre for Spatial Information (CRCSI).
Resumo:
Drivers' ability to react to unpredictable events deteriorates when exposed to highly predictable and uneventful driving tasks. Particularly, highway design reduces the driving task mainly to a lane-keeping one. It contributes to hypovigilance and road crashes as drivers are often not aware that their driving behaviour is impaired. Monotony increases fatigue, however, the fatigue community has mainly focused on endogenous factors leading to fatigue such as sleep deprivation. This paper focuses on the exogenous factor monotony which contributes to hypovigilance. Objective measurements of the effects of monotonous driving conditions on the driver and the vehicle's dynamics is systematically reviewed with the aim of justifying the relevance of the need for a mathematical framework that could predict hypovigilance in real-time. Although electroencephalography (EEG) is one of the most reliable measures of vigilance, it is obtrusive. This suggests to predict from observable variables the time when the driver is hypovigilant. Outlined is a vision for future research in the modelling of driver vigilance decrement due to monotonous driving conditions. A mathematical model for predicting drivers’ hypovigilance using information like lane positioning, steering wheel movements and eye blinks is provided. Such a modelling of driver vigilance should enable the future development of an in-vehicle device that detects driver hypovigilance in advance, thus offering the potential to enhance road safety and prevent road crashes.
Resumo:
Cohen (1977) reviewed the then current research on occupational safety and stated that both strong company commitment to safety, and communication between all levels of a company are the most influential factors to improving safety. Other relevant factors included careful selection of staff, and early and continuous training throughout the lifetime with the company. These continue to be important factors in OHS today. There has been a continued decrease in the injury rates since Cohen’s review within the Australian construction industry, however, the construction industry has far more injuries and ill-health than the Australian average, with one fatality occurring on average per week in the Australian Construction Industry. The Fatality rate in the building and construction industry remains three times higher than the national average, and 15% of all industry fatalities are in the building and construction industry. In addition the construction industry pays one of the highest workers’ compensation premium rates – in 2001 alone approximately 0.5% ($267 million) of revenue would have to be allocated to the direct cost of 1998/99 compensations (Office of the Federal Safety Commissioner, 2006). Based on these statistics there is a need to measure and improve safety performance within the construction industry.
Resumo:
This paper reviews the available academic and policy literature to identify the possibilities and limitations of social procurement, and the factors that enable its implementation. In doing so, it aims to contribute to an evidence-based approach to social enterprise development in Australia, and to provide practical information of use to both policy makers and social enterprises considering social procurement arrangements. Based on the available evidence, the dominant focus of this review is on social procurement by governments.
Resumo:
Objective: The objectives of this article are to explore the extent to which the International Statistical Classification of Diseases and Related Health Problems (ICD) has been used in child abuse research, to describe how the ICD system has been applied and to assess factors affecting the reliability of ICD coded data in child abuse research.----- Methods: PubMed, CINAHL, PsychInfo and Google Scholar were searched for peer reviewed articles written since 1989 that used ICD as the classification system to identify cases and research child abuse using health databases. Snowballing strategies were also employed by searching the bibliographies of retrieved references to identify relevant associated articles. The papers identified through the search were independently screened by two authors for inclusion, resulting in 47 studies selected for the review. Due to heterogeneity of studies metaanalysis was not performed.----- Results: This paper highlights both utility and limitations of ICD coded data. ICD codes have been widely used to conduct research into child maltreatment in health data systems. The codes appear to be used primarily to determine child maltreatment patterns within identified diagnoses or to identify child maltreatment cases for research.----- Conclusions: A significant impediment to the use of ICD codes in child maltreatment research is the under-ascertainment of child maltreatment by using coded data alone. This is most clearly identified and, to some degree, quantified, in research where data linkage is used. Practice Implications: The importance of improved child maltreatment identification will assist in identifying risk factors and creating programs that can prevent and treat child maltreatment and assist in meeting reporting obligations under the CRC.