948 resultados para Building Life Cycle


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sustainability has been increasingly recognised as an integral part of highway infrastructure development. In practice however, the fact that financial return is still a project’s top priority for many, environmental aspects tend to be overlooked or considered as a burden, as they add to project costs. Sustainability and its implications have a far-reaching effect on each project over time. Therefore, with highway infrastructure’s long-term life span and huge capital demand, the consideration of environmental cost/ benefit issues is more crucial in life-cycle cost analysis (LCCA). To date, there is little in existing literature studies on viable estimation methods for environmental costs. This situation presents the potential for focused studies on environmental costs and issues in the context of life-cycle cost analysis. This paper discusses a research project which aims to integrate the environmental cost elements and issues into a conceptual framework for life cycle costing analysis for highway projects. Cost elements and issues concerning the environment were first identified through literature. Through questionnaires, these environmental cost elements will be validated by practitioners before their consolidation into the extension of existing and worked models of life-cycle costing analysis (LCCA). A holistic decision support framework is being developed to assist highway infrastructure stakeholders to evaluate their investment decision. This will generate financial returns while maximising environmental benefits and sustainability outcome.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Life Cycle Cost Analysis provides a form of synopsis of the initial and consequential costs of building related decisions. These cost figures may be implemented to justify higher investments, for example, in the quality or flexibility of building solutions through a long term cost reduction. The emerging discipline of asset mnagement is a promising approach to this problem, because it can do things that techniques such as balanced scorecards and total quantity cannot. Decisions must be made about operating and maintaining infrastructure assets. An injudicious sensitivity of life cycle costing is that the longer something lasts, the less it costs over time. A life cycle cost analysis will be used as an economic evaluation tool and collaborate with various numbers of analyses. LCCA quantifies incurring costs commonly overlooked (by property and asset managers and designs) as replacement and maintenance costs. The purpose of this research is to examine the Life Cycle Cost Analysis on building floor materials. By implementing the life cycle cost analysis, the true cost of each material will be computed projecting 60 years as the building service life and 5.4% as the inflation rate percentage to classify and appreciate the different among the materials. The analysis results showed the high impact in selecting the floor materials according to the potential of service life cycle cost next.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As knowledge of the residential development costing impact on resource and budgeting use increase, developers are moving towards more sustainable solution by implementing whole life cycle costing. Property management requires an understanding of infrastructure management, service life planning and quality management. Today, people are beginning to realize that effective property management in high-rise residential property can sustain the property value and maintain high returns on their investment. The continuous growth of high-rise residential properties indicates that there is a need for an effective property management system to provide a sustainable high-rise residential property development. For such reasons, this paper attempts to study the culture that have been applied due the residential property development in Malaysia as to improve to the best and sustainable practice in providing the best cost effectiveness management system in residential property development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The demand of implementing Whole Life Cycle Costing (WLCC) towards property development has increased since the launch of Value Management Circular 3/2009 by the Economic Planning Unit Malaysia. The circular made compulsory for all public construction projects and programme including property development estimated more than RM 50 Million to conduct WLCC. However, a knowledge gap on WLCC approach still exists and become a barrier among the practitioner in Malaysia particularly in property development industry. The main focus of this paper is to discuss the WLCC approach and introduce the indicator that need to be considered in Malaysia property development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the floor materials by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of floor material of two public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The cost figures may be implemented to justify higher investments, for examples, in the quality or flexibility of building solutions through a long-term cost reduction. The calculation and the literature review are conducted. The questionnaire surveys of two public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the floor material in their house. As a result, the quality of floor material based on the whole life cycle costing approach is one of the best among their previous decision making tool that was applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions for floor material selection for their properties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project was an initial stage in formulating and management of the optimum budget allocation during the operational, maintenance and rehabilitation phases in high rise residential property development in Malaysia. The principal objective of this project is to develop a framework of Whole Life Cycle Costing for high rise residential property development that will enhance the quality and cost effectiveness of this building type in Malaysia. The researcher investigated 13 building components from 6 high rise residential property developments in Johor, Malaysia to determine the affect and economic impact of component initial cost and quality by applying them to a Whole Life Cycle Cost model approach. The results provide valuable data in respect to the overall cost of specific components over the whole life of a large high rise building. In addition, Dr. Mat Noor also determined the impact and satisfaction of quality of building components through WLCC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Global climate change is one of the most significant environmental impacts at the moment. One central issue for the building and construction industry to address global climate change is the development of credible carbon labelling schemes for building materials. Various carbon labelling schemes have been developed for concrete due to its high contribution to global greenhouse gas (GHG) emissions. However, as most carbon labelling schemes adopt cradle-to-gate as system boundary, the credibility of the eco-label information may not be satisfactory because recent studies show that the use and end-of-life phases can have a significant impact on the life cycle GHG emissions of concrete in terms of carbonation, maintenance and rehabilitation, other indirect emissions, and recycling activities. A comprehensive review on the life cycle assessment of concrete is presented to holistically examine the importance of use and end-of-life phases to the life cycle GHG quantification of concrete. The recent published ISO 14067: Carbon footprint of products – requirements and guidelines for quantification and communication also mandates the use of cradle-to-grave to provide publicly available eco-label information when the use and end-of-life phases of concrete can be appropriately simulated. With the support of Building Information Modelling (BIM) and other simulation technologies, the contribution of use and end-of-life phases to the life cycle GHG emissions of concrete should not be overlooked in future studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Life cycle energy analysis (LCEA) of eight residential buildings in and around Brisbane, Queensland, Australia, is undertaken in this study. Energy used in all three phases of construction, operation and demolition are considered. It is found that the main contribution to the operational energy in residential buildings is from use of general appliance. The choice of building materials is shown to have significant effects on the embodied energy for the production, construction, maintenance and demolition phases. From this study, it is shown that the embodied energy may vary from 10% to 30%, while the operational energy may vary from 65% to 90%. The demolition energy generally accounts for less than 4% of life cycle energy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most studies on the environmental performance of buildings focus on energy demand and associated greenhouse gas emissions. They often neglect to consider the range of other resource demands and environmental impacts associated with buildings, including water. Studies that assess water use in buildings typically consider only operational water, which excludes the embodied water in building materials or the water associated with the mobility of building occupants. A new framework is presented that quantifies water requirements at the building scale (i.e. the embodied and operational water of the building as well as its maintenance and refurbishment) and at the city scale (i.e. the embodied water of nearby infrastructures such as roads, gas distribution and others) and the transport-related indirect water use of building occupants. A case study house located in Melbourne, Australia, is analysed using the new framework. The results show that each of the embodied, operational and transport requirements is nearly equally important. By integrating these three water requirements, the developed framework provides architects, building designers, planners and decision-makers with a powerful means to understand and effectively reduce the overall water use and associated environmental impacts of residential buildings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports the findings of research on the environmental performance of two case-study houses, a retrofit and new build. The retrofit was completed to a Passivhaus standard while the new build was completed to current Irish building regulations. Environmental performance of the retrofit and new build was measured using life-cycle assessments, examining the assembly, operational and end-of-life stage over life spans of 50 and 80 years. Using primary information, life-cycle assessment software and life-cycle assessment databases the environmental impacts of each stage were modelled. The operational stage of both case studies was found to be the source of the most significant environmental damage, followed by the assembly and the end-of-life stage respectively. The relative importance of the assembly and end-of-life stage decreased as the life span increased. It was found that the retrofit house studied outperformed the new build in the assembly and operational stage, whereas the new build performed better in the end-of-life stage; however, this is highly sensitive, depending on the standards to which both are completed. Operational energy savings pre- and post-retrofit were significant, indicating the future potential for adoption of high-quality retrofitting practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A whole life-cycle information management vision is proposed, the organizational requirements for the realization of the scenario is investigated. Preliminary interviews with construction professionals are reported. Discontinuities at information transfer throughout life-cycle of built environments are resulting from lack of coordination and multiple data collection/storage practices. A more coherent history of these activities can improve the work practices of various teams by augmenting decision making processes and creating organizational learning opportunities. Therefore, there is a need for unifying these fragmented bits of data to create a meaningful, semantically rich and standardized information repository for built environment. The proposed vision utilizes embedded technologies and distributed building information models. Two diverse construction project types (large one-off design, small repetitive design) are investigated for the applicability of the vision. A functional prototype software/hardware system for demonstrating the practical use of this vision is developed and discussed. Plans for case-studies for validating the proposed model at a large PFI hospital and housing association projects are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The impacts on the environment from human activities are of increasing concern. The need to consider the reduction in energy consumption is of particular interest, especially in the construction and operation of buildings, which accounts for between 30 and 40% of Australia's national energy consumption. Much past and more recent emphasis has been placed on methods for reducing the energy consumed in the operation of buildings. With the energy embodied in these buildings having been shown to account for an equally large proportion of a building's life cycle energy consumption, there is a need to look at ways of reducing the embodied energy of buildings and related products. Life cycle assessment (LCA) is considered to be the most appropriate tool for assessing the life cycle energy consumption of buildings and their products. The life cycle inventory analysis (LCIA) step of a LCA, where an inventory of material and energy inputs is gathered, may currently suffer from several limitations, mainly concerned with the use of incomplete and unreliable data sources and LCIA methods. These traditional methods of LCIA include process-based and input-output-based LCIA. Process-based LCIA uses process specific data, whilst input-output-based LCIA uses data produced from an analysis of the flow of goods and services between sectors of the Australian economy, also known as input-output data. With the incompleteness and unreliability of these two respective methods in mind, hybrid LCIA methods have been developed to minimise the errors associated with traditional LCIA methods, combining both process and input-output data. Hybrid LCIA methods based on process data have shown to be incomplete. Hybrid LCIA methods based on input-output data involve substituting available process data into the input-output model minimising the errors associated with process-based hybrid LCIA methods. However, until now, this LCIA method had not been tested for its level of completeness and reliability. The aim of this study was to assess the reliability and completeness of hybrid life cycle inventory analysis, as applied to the Australian construction industry. A range of case studies were selected in order to apply the input-output-based hybrid LCIA method and evaluate the subsequent results as obtained from each case study. These case studies included buildings: two commercial office buildings, two residential buildings, a recreational building; and building related products: a solar hot water system, a building integrated photovoltaic system and a washing machine. The range of building types and products selected assisted in testing the input-output-based hybrid LCIA method for its applicability across a wide range of product types. The input-output-based hybrid LCIA method was applied to each of the selected case studies in order to obtain their respective embodied energy results. These results were then evaluated with the use of a number of evaluation methods. These evaluation methods included an analysis of the difference between the process-based and input-output-based hybrid LCIA results as an evaluation of the completeness of the process-based LCIA method. The second method of evaluation used was a comparison between equivalent process and input-output values used in the input-output-based hybrid LCIA method as a measure of reliability. It was found that the results from a typical process-based LCIA and process-based hybrid LCIA have a large gap when compared to input-output-based hybrid LCIA results (up to 80%). This gap has shown that the currently available quantity of process data in Australia is insufficient. The comparison between equivalent process-based and input-output-based LCIA values showed that the input-output data does not provide a reliable representation of the equivalent process values, for material energy intensities, material inputs and whole products. Therefore, the use of input-output data to account for inadequate or missing process data is not reliable. However, as there is currently no other method for filling the gaps in traditional process-based LCIA, and as input-output data is considered to be more complete than process data, and the errors may be somewhat lower, using input-output data to fill the gaps in traditional process-based LCIA appears to be better than not using any data at all. The input-output-based hybrid LCIA method evaluated in this study has shown to be the most sophisticated and complete currently available LCIA method for assessing the environmental impacts associated with buildings and building related products. This finding is significant as the construction and operation of buildings accounts for a large proportion of national energy consumption. The use of the input-output-based hybrid LCIA method for products other than those related to the Australian construction industry may be appropriate, especially if the material inputs of the product being assessed are similar to those typically used in the construction industry. The input-output-based hybrid LCIA method has been used to correct some of the errors and limitations associated with previous LCIA methods, without the introduction of any new errors. Improvements in current input-output models are also needed, particularly to account for the inclusion of capital equipment inputs (i.e. the energy required to manufacture the machinery and other equipment used in the production of building materials, products etc.). Although further improvements in the quantity of currently available process data are also needed, this study has shown that with the current available embodied energy data for LCIA, the input-output-based hybrid LCIA appears to provide the most reliable and complete method for use in assessing the environmental impacts of the Australian construction industry.