956 resultados para BEAVER DAM


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a complete control architecture that has been designed to fulfill predefined missions with an autonomous underwater vehicle (AUV). The control architecture has three levels of control: mission level, task level and vehicle level. The novelty of the work resides in the mission level, which is built with a Petri network that defines the sequence of tasks that are executed depending on the unpredictable situations that may occur. The task control system is composed of a set of active behaviours and a coordinator that selects the most appropriate vehicle action at each moment. The paper focuses on the design of the mission controller and its interaction with the task controller. Simulations, inspired on an industrial underwater inspection of a dam grate, show the effectiveness of the control architecture

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Environmental changes from water resource developmental projects affect the epidemiology of water-associated diseases, as well as malaria and schistosomiasis. Aiming to investigate the occurrence and distribution of freshwater snails of medical and veterinary importance in the area of influence of the Peixe Angical hydroelectric dam, a survey has been conducted over four years (2004-2008). The study has revealed the occurrence of populations of Biomphalaria straminea (Dunker) in all municipalities surrounding the lake. Studies on parasite-mollusc compatibility were undertaken using 35 populations of B. straminea, descendants of specimens obtained from that area and three strains of Schistosoma mansoni (Sambon) (BH, CM and CMO). The main results are as follows: (i) among the 1,314 specimens used, eight had been infected (infection index of 0.6%) with only the BH strain, (ii) for B. straminea populations, the mortality index was 6.8% and, depending on the strain used, the indexes were 4.6%, 8.49% and 19% with BH, CM and CMO strains, respectively, (iii) the infection indexes varied according to the B. straminea populations, ranging from 0-12.5% and (iv) the duration of the precercarial period varied from 25-49 days. These results, in addition to environmental and social changes that took place in the Peixe Angical dam region, indicate the possibility of B. straminea emerging as a schistosomiasis vector in this area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Descripció i anàlisi del sistema de funcionament de justícia juvenil en medi obert, i concretament la metodologia de treball dels DAM, per tal d’evidenciar les competències requerides a l’hora de desenvolupar l’exercici professional d’educador social com a DAM, tot exposant una anàlisi de la formació acadèmica impartida al llarg de la diplomatura d’Educació Social en relació a aquests requeriments

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new species of Simuliidae, Simulium (Chirostilbia) brunnescens, was discovered at Chapada dos Guimarães, state of Mato Grosso, Brazil, and nearby municipalities (Paranatinga, Rosário do Oeste and Nobres). This species is described here based on the adults, pupae and larvae. This species is closely related to Simulium (C.) subpallidum Lutz, but could be differentiated in all stages: females, leg colour pattern and frontal dilatation size; males, gonostyle shape; pupae, number of gill filaments; larvae, body size and colour, postgenal cleft, ratio between antenna and stalk of labral fan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Around 11.5 * 106 m3 of rock detached from the eastern slope of the Santa Cruz valley (San Juan province, Argentina) in the first fortnight of January 2005. The rockslide?debris avalanche blocked the course, resulting in the development of a lake with maximum length of around 3.5 km. The increase in the inflow rate from 47,000?74,000 m3/d between April and October to 304,000 m3/d between late October and the first fortnight of November, accelerated the growing rate of the lake. On 12 November 2005 the dam failed, releasing 24.6 * 106 m3 of water. The resulting outburst flood caused damages mainly on infrastructure, and affected the facilities of a hydropower dam which was under construction 250 km downstream from the source area. In this work we describe causes and consequences of the natural dam formation and failure, and we dynamically model the 2005 rockslide?debris avalanche with DAN3D. Additionally, as a volume ~ 24 * 106 m3of rocks still remain unstable in the slope, we use the results of the back analysis to forecast the formation of a future natural dam. We analyzed two potential scenarios: a partial slope failure of 6.5 * 106 m3 and a worst case where all the unstable volume remaining in the slope fails. The spreading of those potential events shows that a new blockage of the Santa Cruz River is likely to occur. According to their modeled morphometry and the contributing watershed upstream the blockage area, as the one of 2005, the dams would also be unstable. This study shows the importance of back and forward analysis that can be carried out to obtain critical information for land use planning, hazards mitigation, and emergency management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Argentina National Road 7 that crosses the Andes Cordillera within the Mendoza province to connect Santiago de Chile and Buenos Aires is particularly affected by natural hazards requiring risk management. Integrated in a research plan that intends to produce landslide susceptibility maps, we aimed in this study to detect large slope movements by applying a satellite radar interferometric analysis using Envisat data, acquired between 2005 and 2010. We were finally able to identify two large slope deformations in sandstone and clay deposits along gentle shores of the Potrerillos dam reservoir, with cumulated displacements higher than 25mm in 5years and towards the reservoir. There is also a body of evidences that these large slope deformations are actually influenced by the seasonal reservoir level variations. This study shows that very detailed information, such as surface displacements and above all water level variation, can be extracted from spaceborne remote sensing techniques; nevertheless, the limitations of InSAR for the present dataset are discussed here. Such analysis can then lead to further field investigations to understand more precisely the destabilising processes acting on these slope deformations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The state of Ceará, Brazil, has 75% of its area covered by Brazilian semiarid, with its peculiar features. In this state, the dams are constituted in water structure of strategic importance, ensuring, both in time and space, the development and supply of water to population. However, construction of reservoirs results in various impacts that should be carefully observed when deciding on their implementation. One of the impacts identified as negative is the increased evaporation, which constitutes a major component of water balance in reservoirs, especially in arid regions. Several methods for estimating evaporation have been proposed over time, many of them deriving from the Penman equation. This study evaluated six different methods for estimating evaporation in order to determine the most suitable for use in hydrological models for water balance in reservoirs in the state of Ceará. The tested methods were proposed by Penman, Kohler-Nordenson-Fox, Priestley-Taylor, deBruim-Keijman, Brutsaert-Stricker and deBruim. The methods presented good performance when tested for water balance during the dry season, and the Priestley-Taylor was the most appropriate, since the data from de simulated water balance with evaporation estimated by this method were the closest of the water balance data observed from measures of reservoir level and the elevation-volume curve provided by the Company of Management of Water Resources of the state of Ceará - COGERH.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The siltation is a natural process, but can be accelerated by human actions and results in major problems for the reservoirs, reducing its useful volume for irrigation. An example of this problem was the reduction of the area of mirror water of Fernandópolis municipal dam in 48.3% during 20 years. Therefore, this study aimed to evaluate the production of sediments and siltation of Fernandópolis municipal dam from a methodology that can be applied to small earth dams for agricultural purposes. For this, it was monitored, monthly throughout the year, the volume of sediment deposited in the reservoir. The percentage of retention sediment in Fernandópolis municipal dam ranged from 53.9 to 94.5%, that associated with a high specific sediment yield, will cause its full silting in at most 57 years. It is recommended to minimize this process the restoration of permanent preservation areas and the removal of 17,500 m³ of sediment from the riverbed of the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new Dam Safety Act (494/2009) came into force on 1st October 2009 and a Government Decree on Dam Safety (319/2010) on 5th May 2010. This Dam Safety Guide replaces the Dam Safety Code of Practice (Publication of the Ministry of Agriculture and Forestry 7/1997), removed from circulation on 1st October 2009. The Dam Safety Guide is not binding on the dam owner; the purpose is to complement and elucidate the relevant law and and decree through examples and descriptions. The Guide takes up questions concerning dam design, for instance hydrological dimensioning and technical safety requirements, dam construction and use, the dam break hazard analysis and the dam owner’s emergency action plan, maintenance, use, monitoring as well as the annual and periodic inspections. Dams are classified according to the hazard they pose into class 1, 2 or 3 dams. The classification is not needed, if, according to the dam safety authority, the dam poses no danger. The owner of a classified dam must prepare a monitoring programme, to be approved by decision of the dam safety authority. To establish the hazard caused by a dam, the owner of a class 1 dam must prepare an analysis of the dam hazard to humans and property as well as to the environment. The dam safety authority may also require a dam break hazard analysis for a dam other than class 1 dam if deemed necessary for classification. The owner of a class 1 dam must prepare a plan of measures in case of emergency or operational failure. The plan shall present the dam owner’s state of preparedness to act on their own initiative in the situations described above. In each case, the rescue authorities make a separate assessment for the need to prepare a plan as set out in the Rescue Act. The dam owner must provide the information specified in the Dam Safety Decree to be entered into the dam safety information system. The dam safety authority and the owner of the dam must keep up-to-date printouts in their own dam safety files from the information system for each dam as well as other important documents connected with dam safety to ensure that these are readily available in case of disturbance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an important pioneer vegetation formation along the Xingu River in the area where the Belo Monte hydroelectric dam is being constructed that is highly adapted to a seasonally fluctuating water levels. The aim of this study was to examine the habitat and flora of the pioneer formations in the Belo Monte area. The area was divided in three sections for study purposes (Reservoir, Low Flow, and Control) that were expected to experience different degrees of impact from the dam project. The calculations of habitat losses were based on satellite imagery classifications, and a total of 111 plots were established in the three areas for vegetation sampling. Habitat losses of the pioneer formations will total 89.7% when the project is fully functional. Forty-five of the 72 recorded species are restricted to single areas. Species richness and diversity were significantly lower in the control area. The completion of the Belo Monte reservoir will result in habitat reductions and will consequently reduce the richness and diversity of pioneer formations. Studies suggest monitoring the populations located in the reduced flow area to determine possible impacts resulting from changes in the regional hydrological cycle caused by the Xingu River dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Neonatal handling induces several behavioral and neurochemical alterations in pups, including decreased responses to stress and reduced fear in new environments. However, there are few reports in the literature concerning the behavioral effects of this neonatal intervention on the dams during the postpartum period. Therefore, the aim of the current study was to determine if brief postpartum separation from pups has a persistent impact on the dam's stress response and behavior. Litters were divided into two neonatal groups: 1) non-handled and 2) handled [10 min/day, from postnatal day (PND) 1 to 10]. Weaning occurred at PND 21 when behavioral tasks started to be applied to the dams, including sweet food ingestion (PND 21), forced swimming test (PND 28), and locomotor response to a psychostimulant (PND 28). On postpartum day 40, plasma was collected at baseline for leptin assays and after 1 h of restraint for corticosterone assay. Regarding sweet food consumption, behavior during the forced swimming test or plasma leptin levels did not differ between dams briefly separated and non-separated from their pups during the postpartum period. On the other hand, both increased locomotion in response to diethylpropion and increased corticosterone secretion in response to acute stress were detected in dams briefly separated from their pups during the first 10 postnatal days. Taken together, these findings suggest that brief, repeated separations from the pups during the neonatal period persistently impact the behavior and induce signs of dopaminergic sensitization in the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This ecological investigation of the beaver (Castor canadensis canadensis Kuhl) was part of the Eastern Slopes (Alberta) Watershed Research program conducted during the summers of 1968 . 1969 . 1970. and 1971 . A soil particle size analysis indicated that soil heavy with clay was used by the beaver for construction purposes in the Porcupine Hills . Examples were given of the beaver controlling erosion with the construction of dams . and also causing erosion to occur . However . in general . the beaver slow down soil erosion and decrease the loss of soil from this region. The beaver utilized measureable amounts of herbaceous vegetation . However, the utilization of herbs by the beaver requires further investigation. A system of ex~sures and enclosures of herbaceous vegetation plots was used to study the utilization of sedges , grasses , and forbs . The beaver indicated stronger species preference for willow as compared to aspen . The size preference for willow was in the 1.0 to 10.0 centimeters basal diameter classes , while the beaver utilization of aspen indicated a preference for the largest trees with basal diameter greater than 20.0 centimeters. Willow was the most important plant in the low lying areas with regard to distribution, abundance and to produce sustained yield. The beaver used this plant for food and construction throughout the study area. The distribution of aspen was limited. and this species did not appear to produce more than one crop in the lifetime of a beaver colony. Nine out of 15 woody plant types were sampled by the beaver in this region. A plot-intercept transect technique was used for systematic vegetation sampling of the woody vegetation in six intensively studied watersheds. The beaver population of the Porcupine Hills region of SW-Alberta is believed to depend upon the chinooks. During the 1971 ground census, a total of 60 active beaver colonies were tallied on the 930 square kilometers large study area. The beaver of the region were not found to store large food caches during fall and winter, however, they are believed to collect feed periodically throughout the winter months. It was observed that the severe winter in 1968-69, reduced by 27 per cent the number of active beaver colonies within the study area. The Porcupine Hills region had 0.07 beaver colony per square kilometer in 1971, a low density of beaver colonies due to the rough topography of the area. However, the importance of the beaver ponds was somewhat clarified as they provide increased moisture, which lessens the fire damage, and store water for wildlife and cattle in the area. Meteorological data was collected by the author in collaboration with the Department of Transport.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map of the land for the Mill Scibes Grand River Dam. Created by The Welland Canal Company. Included is a drawing of the land. Noteable features include; Sulphur Creek, post, bridge, Grand River, lot divisions, inside face of embankment. Surveyor notes are seen in pencil on the map.