981 resultados para Anaconda Reduction Works


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three anaerobic ponds used to store and treat piggery wastes were fully covered with permeable materials manufactured from polypropylene geofabric, polyethylene shade cloth and supported straw. The covers were assessed in terms of efficacy in reducing odour emission rates over a 40-month period. Odour samples were collected from the surface of the covers, the surface of the exposed liquor and from the surface of an uncovered (control) pond at one of the piggeries. Relative to the emission rate of the exposed liquor at each pond, the polypropylene, shade cloth and straw covers reduced average emission rates by 76%, 69% and 66% respectively. At the piggery with an uncovered control pond, the polypropylene covers reduced average odour emission rates by 50% and 41% respectively. A plausible hypothesis, consistent with likely mechanisms for the odour reduction and the olfactometric method used to quantifying the efficacy of the covers, is offered.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In urban environments road traffic volumes are increasing and the density of living is becoming higher. As a consequence the urban community is being exposed to increasing levels of road traffic noise. It is also evident that the noise reduction potential of within-the-road-reserve treatments such as noise barriers, mounding and pavement surfacing has been exhausted. This paper presents a strategy that involves the comparison of noise ameliorative treatments both within and outside the road reserve. The noise reduction resulting from the within-the-road-reserve component of treatments has been evaluated using a leading application of the CoRTN Model, developed by the UK Department of Transport 1988 [1], and the outside road reserve treatment has been evaluated in accordance with the Australian Standard 3671, Acoustics – Road traffic noise intrusion – Building sitting and construction [5]. The evaluation of noise treatments has been undertaken using a decision support tool (DST) currently being developed under the research program conducted at RMIT University and Department of Main Roads, Queensland. The case study has been based on data from a real project in Queensland, Australia. The research described here was carried out by the Australian Cooperative Research Centre for Construction Innovation [9], in collaboration with Department of Main Roads, Queensland, Department of Public Works, Queensland, Arup Pty. Ltd., Queensland University of technology and RMIT University.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on the early stages of a design experiment in educational assessment that challenges the dichotomous legacy evident in many assessment activities. Combining social networking technologies with the sociology of education the paper proposes that assessment activities are best understood as a negotiable field of exchange. In this design experiment students, peers and experts engage in explicit, "front-end" assessment (Wyatt-Smith, 2008) to translate holistic judgments into institutional, and potentiality economic capital without adhering to long lists of pre-set criteria. This approach invites participants to use social networking technologies to judge creative works using scatter graphs, keywords and tag clouds. In doing so assessors will refine their evaluative expertise and negotiate the characteristics of creative works from which criteria will emerge (Sadler, 2008). The real-time advantages of web-based technologies will aggregate, externalise and democratise this transparent method of assessment for most, if not all, creative works that can be represented in a digital format.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

INTRODUCTION Inflammation is a protective attempt to facilitate the removal of damaged tissue and to initiate the healing response in other tissues. However, after spinal cord injury (SCI), this response is prolonged leading to secondary degeneration and glial scarring. Here, we investigate the potential of sustained delivery of pro-inflammatory factors vascular endothelial growth factor (VEGF) and platelet derived growth factor (PDGF) to increase early inflammatory events and promote inflammatory resolution. Method Animal ethics approval was obtained from the Queensland University of Technology. Adult Wistar-Kyoto rats (12-16 weeks old) were subjected to laminectomies and T10 hemisections. Animals were then randomised to treatment (implantation of osmotic pump (Alzet) loaded with 5ug VEGF & 5 ug PDGF) or control groups (lesion control or lesion plus pump delivering PBS). Rats were sacrificed at one month and the spinal cords were harvested and examined by immunohistology, using anti-neurofilament-200(NF200) and anti- ionized calcium binding adapter molecule 1 (Iba1). One way ANOVA was used for statistic analysis. Results At 1 month, active pump-treated cords showed a high level of axonal filament throughout the defects as compared to the control groups. The mean lesion size, as measured by NF200, was 0.47mm2 for the lesion control, 0.39mm2 for the vehicle control and 0.078mm2 for the active pump group. Significant differences were detected between the active pump group and the two control groups (AP vs LC p= 0.017 AG vs VC p= 0.004). Iba-1 staining also showed significant differences in the post-injury inflammatory response. Discussion We have shown that axons and activated microglia are co-located in the lesion of the treated cord. We hypothesise the delivery of VEGF/PDGF increases the local vessel permeability to inflammatory cells and activates these along with the resident microglia to threshold population, which ultimately resolved the prolonged inflammation. Here, we have shown that maintaining the inflammatory signals for at least 7 days improved the morphology of the injured cord. Conclusion This study has shown that boosting inflammation, by delivery VEGF/PDGF, in the early phase of SCI helps to reduce secondary degeneration and may promote inflammation resolution. This treatment may provide a platform for other neuro-regenrative therapies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Multi-outcomes Construction Policies research project, funded by the Cooperative Research Centre for Construction Innovation (Project 2006-036-A), sought to explore the costs and benefits of leveraging social outcomes on public construction contracts. The context of the research project was the trend towards the contracting out of public construction works and the attempts that have been made to use new contractual arrangements with construction companies to construction achieve a wide range of social outcomes. In federal and state jurisdictions it is now common for governments to impose a range of additional requirements on public works contractors that relate to broad social/community objectives. These requirements include commitments to train apprentices and trainees; to provide local and/or indigenous employment opportunities; to buy local materials; and to include art works. The cost and benefits of using public construction contracts to achieve social/community goals have, to our knowledge, not been thoroughly researched in an Australian context. This is likely to reflect in large part the relatively short history of contracting out public works. As Jensen and Stonecash (2004) explain, most previous empirical studies of contracting out have attempted to measure the cost savings achieved through privatization, as this was the focus of policy debate in the 1980s and 1990s. Relatively few studies have addressed the ability of contracting arrangements to ensure the delivery of desired ‘quality’ outcomes1, or the costs of achieving these outcomes via contracting arrangements. One of the potential costs of attempting to leverage social/community outcomes on public construction projects is a reduction in the amount of competition for these projects, with obvious consequences for average bid prices and choice. In jurisdictions, such as Western Australia and Queensland, where currently construction market conditions are already

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Machine downtime, whether planned or unplanned, is intuitively costly to manufacturing organisations, but is often very difficult to quantify. The available literature showed that costing processes are rarely undertaken within manufacturing organisations. Where cost analyses have been undertaken, they generally have only valued a small proportion of the affected costs, leading to an overly conservative estimate. This thesis aimed to develop a cost of downtime model, with particular emphasis on the application of the model to Australia Post’s Flat Mail Optical Character Reader (FMOCR). The costing analysis determined a cost of downtime of $5,700,000 per annum, or an average cost of $138 per operational hour. The second section of this work focused on the use of the cost of downtime to objectively determine areas of opportunity for cost reduction on the FMOCR. This was the first time within Post that maintenance costs were considered along side of downtime for determining machine performance. Because of this, the results of the analysis revealed areas which have historically not been targeted for cost reduction. Further exploratory work was undertaken on the Flats Lift Module (FLM) and Auto Induction Station (AIS) Deceleration Belts through the comparison of the results against two additional FMOCR analysis programs. This research has demonstrated the development of a methodical and quantifiable cost of downtime for the FMOCR. This has been the first time that Post has endeavoured to examine the cost of downtime. It is also one of the very few methodologies for valuing downtime costs that has been proposed in literature. The work undertaken has also demonstrated how the cost of downtime can be incorporated into machine performance analysis with specific application to identifying high costs modules. The outcome of this report has both been the methodology for costing downtime, as well as a list of areas for cost reduction. In doing so, this thesis has outlined the two key deliverables presented at the outset of the research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an Active Gate Signaling scheme to reduce voltage/current spikes across insulated gate power switches in hard switching power electronic circuits. Voltage and/or current spikes may cause EMI noise. In addition, they increase voltage/current stress on the switch. Traditionally, a higher gate resistance is chosen to reduce voltage/current spikes. Since the switching loss will increase remarkably, an active gate voltage control scheme is developed to improve efficiency of hard switching circuits while the undesirable voltage and/or current spikes are minimized.