963 resultados para Altnahinch Dam


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Argentina National Road 7 that crosses the Andes Cordillera within the Mendoza province to connect Santiago de Chile and Buenos Aires is particularly affected by natural hazards requiring risk management. Integrated in a research plan that intends to produce landslide susceptibility maps, we aimed in this study to detect large slope movements by applying a satellite radar interferometric analysis using Envisat data, acquired between 2005 and 2010. We were finally able to identify two large slope deformations in sandstone and clay deposits along gentle shores of the Potrerillos dam reservoir, with cumulated displacements higher than 25mm in 5years and towards the reservoir. There is also a body of evidences that these large slope deformations are actually influenced by the seasonal reservoir level variations. This study shows that very detailed information, such as surface displacements and above all water level variation, can be extracted from spaceborne remote sensing techniques; nevertheless, the limitations of InSAR for the present dataset are discussed here. Such analysis can then lead to further field investigations to understand more precisely the destabilising processes acting on these slope deformations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The state of Ceará, Brazil, has 75% of its area covered by Brazilian semiarid, with its peculiar features. In this state, the dams are constituted in water structure of strategic importance, ensuring, both in time and space, the development and supply of water to population. However, construction of reservoirs results in various impacts that should be carefully observed when deciding on their implementation. One of the impacts identified as negative is the increased evaporation, which constitutes a major component of water balance in reservoirs, especially in arid regions. Several methods for estimating evaporation have been proposed over time, many of them deriving from the Penman equation. This study evaluated six different methods for estimating evaporation in order to determine the most suitable for use in hydrological models for water balance in reservoirs in the state of Ceará. The tested methods were proposed by Penman, Kohler-Nordenson-Fox, Priestley-Taylor, deBruim-Keijman, Brutsaert-Stricker and deBruim. The methods presented good performance when tested for water balance during the dry season, and the Priestley-Taylor was the most appropriate, since the data from de simulated water balance with evaporation estimated by this method were the closest of the water balance data observed from measures of reservoir level and the elevation-volume curve provided by the Company of Management of Water Resources of the state of Ceará - COGERH.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The siltation is a natural process, but can be accelerated by human actions and results in major problems for the reservoirs, reducing its useful volume for irrigation. An example of this problem was the reduction of the area of mirror water of Fernandópolis municipal dam in 48.3% during 20 years. Therefore, this study aimed to evaluate the production of sediments and siltation of Fernandópolis municipal dam from a methodology that can be applied to small earth dams for agricultural purposes. For this, it was monitored, monthly throughout the year, the volume of sediment deposited in the reservoir. The percentage of retention sediment in Fernandópolis municipal dam ranged from 53.9 to 94.5%, that associated with a high specific sediment yield, will cause its full silting in at most 57 years. It is recommended to minimize this process the restoration of permanent preservation areas and the removal of 17,500 m³ of sediment from the riverbed of the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new Dam Safety Act (494/2009) came into force on 1st October 2009 and a Government Decree on Dam Safety (319/2010) on 5th May 2010. This Dam Safety Guide replaces the Dam Safety Code of Practice (Publication of the Ministry of Agriculture and Forestry 7/1997), removed from circulation on 1st October 2009. The Dam Safety Guide is not binding on the dam owner; the purpose is to complement and elucidate the relevant law and and decree through examples and descriptions. The Guide takes up questions concerning dam design, for instance hydrological dimensioning and technical safety requirements, dam construction and use, the dam break hazard analysis and the dam owner’s emergency action plan, maintenance, use, monitoring as well as the annual and periodic inspections. Dams are classified according to the hazard they pose into class 1, 2 or 3 dams. The classification is not needed, if, according to the dam safety authority, the dam poses no danger. The owner of a classified dam must prepare a monitoring programme, to be approved by decision of the dam safety authority. To establish the hazard caused by a dam, the owner of a class 1 dam must prepare an analysis of the dam hazard to humans and property as well as to the environment. The dam safety authority may also require a dam break hazard analysis for a dam other than class 1 dam if deemed necessary for classification. The owner of a class 1 dam must prepare a plan of measures in case of emergency or operational failure. The plan shall present the dam owner’s state of preparedness to act on their own initiative in the situations described above. In each case, the rescue authorities make a separate assessment for the need to prepare a plan as set out in the Rescue Act. The dam owner must provide the information specified in the Dam Safety Decree to be entered into the dam safety information system. The dam safety authority and the owner of the dam must keep up-to-date printouts in their own dam safety files from the information system for each dam as well as other important documents connected with dam safety to ensure that these are readily available in case of disturbance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an important pioneer vegetation formation along the Xingu River in the area where the Belo Monte hydroelectric dam is being constructed that is highly adapted to a seasonally fluctuating water levels. The aim of this study was to examine the habitat and flora of the pioneer formations in the Belo Monte area. The area was divided in three sections for study purposes (Reservoir, Low Flow, and Control) that were expected to experience different degrees of impact from the dam project. The calculations of habitat losses were based on satellite imagery classifications, and a total of 111 plots were established in the three areas for vegetation sampling. Habitat losses of the pioneer formations will total 89.7% when the project is fully functional. Forty-five of the 72 recorded species are restricted to single areas. Species richness and diversity were significantly lower in the control area. The completion of the Belo Monte reservoir will result in habitat reductions and will consequently reduce the richness and diversity of pioneer formations. Studies suggest monitoring the populations located in the reduced flow area to determine possible impacts resulting from changes in the regional hydrological cycle caused by the Xingu River dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Neonatal handling induces several behavioral and neurochemical alterations in pups, including decreased responses to stress and reduced fear in new environments. However, there are few reports in the literature concerning the behavioral effects of this neonatal intervention on the dams during the postpartum period. Therefore, the aim of the current study was to determine if brief postpartum separation from pups has a persistent impact on the dam's stress response and behavior. Litters were divided into two neonatal groups: 1) non-handled and 2) handled [10 min/day, from postnatal day (PND) 1 to 10]. Weaning occurred at PND 21 when behavioral tasks started to be applied to the dams, including sweet food ingestion (PND 21), forced swimming test (PND 28), and locomotor response to a psychostimulant (PND 28). On postpartum day 40, plasma was collected at baseline for leptin assays and after 1 h of restraint for corticosterone assay. Regarding sweet food consumption, behavior during the forced swimming test or plasma leptin levels did not differ between dams briefly separated and non-separated from their pups during the postpartum period. On the other hand, both increased locomotion in response to diethylpropion and increased corticosterone secretion in response to acute stress were detected in dams briefly separated from their pups during the first 10 postnatal days. Taken together, these findings suggest that brief, repeated separations from the pups during the neonatal period persistently impact the behavior and induce signs of dopaminergic sensitization in the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey map of the land for the Mill Scibes Grand River Dam. Created by The Welland Canal Company. Included is a drawing of the land. Noteable features include; Sulphur Creek, post, bridge, Grand River, lot divisions, inside face of embankment. Surveyor notes are seen in pencil on the map.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph with the caption, "LaChasse dam looking from river to Lake LaChasse".

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A photograph of the construction of the dam at Lake LaChasse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cross sections of Lyons Creek from Cooks Mills Dam to culvert (9 pages of charts, graphs and text, handwritten). This is signed by Fred Holmes, May 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This presentation was the product of an invitation to speak at a symposium for students and faculty from a variety of different non-law departments at the University of Tennessee, where in 1973 I had started what became a six-year legal campaign to divert the Tennessee Valley Authority from impounding the last flowing 33 miles of the Little Tennessee River behind TVA’s Tellico Dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis Entitled Post-Environmental Evaluation of The Rajjaprabha Dam In Thailand. This post evaluation of environmental consequences of Rajjaprabha dam IS conducted ten years after its commencement. The Rajjaprabha dam project was planned and implemented as a multipurpose project, mainly for hydropower production, flood protection, fisheries, recreation and irrigation. The project includes the dam and reservoir with a 240 MW hydropower plant located about 90 km upstream from Surat Thani province, and irrigation systems covering the coastal plain in Surat Thani. The upstream storage reservoir (with about 5,639 mcm storage) and the hydropower plant had already been implemented. The first phase of irrigation system covers an area of 23,100 hectares. The second phase is envisaged to cover about 50,000 hectares. This study was conducted with the following objectives: (I) to assess all existing environmental resources and their values with the help of input-output analysis (2) to findout the beneficial impacts of the project (3) to evaluate the actual positive effects vis-a-vis the estimated effects before the project was implemented and (4) to identify all significant changes in relatives to the impacts previously assessed. The study area includes the Phum Duang river basin of about 4,668 km2 (placed on the areas that are upstream and downstream to the damsite), The duration of study is limited to 10 years after the dam has become operational i.e. from 1987-1997. The results of the study reveal that there is no significant changes in climatic and ground water resources, with respect to the study area inspte of the fact that the physical and chemical properties of the soil have slightly changed. Sedimentation in the reservoir does not have much effect on the function of the dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In dam inspection tasks, an underwater robot has to grab images while surveying the wall meanwhile maintaining a certain distance and relative orientation. This paper proposes the use of an MSIS (mechanically scanned imaging sonar) for relative positioning of a robot with respect to the wall. An imaging sonar gathers polar image scans from which depth images (range & bearing) are generated. Depth scans are first processed to extract a line corresponding to the wall (with the Hough transform), which is then tracked by means of an EKF (Extended Kalman Filter) using a static motion model and an implicit measurement equation associating the sensed points to the candidate line. The line estimate is referenced to the robot fixed frame and represented in polar coordinates (rho&thetas) which directly corresponds to the actual distance and relative orientation of the robot with respect to the wall. The proposed system has been tested in simulation as well as in water tank conditions

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a complete control architecture that has been designed to fulfill predefined missions with an autonomous underwater vehicle (AUV). The control architecture has three levels of control: mission level, task level and vehicle level. The novelty of the work resides in the mission level, which is built with a Petri network that defines the sequence of tasks that are executed depending on the unpredictable situations that may occur. The task control system is composed of a set of active behaviours and a coordinator that selects the most appropriate vehicle action at each moment. The paper focuses on the design of the mission controller and its interaction with the task controller. Simulations, inspired on an industrial underwater inspection of a dam grate, show the effectiveness of the control architecture

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Descripció i anàlisi del sistema de funcionament de justícia juvenil en medi obert, i concretament la metodologia de treball dels DAM, per tal d’evidenciar les competències requerides a l’hora de desenvolupar l’exercici professional d’educador social com a DAM, tot exposant una anàlisi de la formació acadèmica impartida al llarg de la diplomatura d’Educació Social en relació a aquests requeriments