984 resultados para Alta velocidad
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Sacramento. El presente articúlo es la cuarta parte de la serie "Alta Velocidad Ferroviaria en California (CHSRS)". Recoge la Alternativa "Stockton Arch", que el Proyecto FARWEST presenta a la prevista por la Authority (CHSRA), para la Línea HSR Fresno-Sacramento, en programación y en trazado. Éste discurre, desde la gran Terminal de Fresno (implantada en las afueras al suroeste de la ciudad) por el segmento sur del "mar interior" (que en el Terciario Superior ocupaba el actual Valle Central), hasta Stockton, y por el segmento norte, hasta Sacramento. El Paet de Ripperdan (~ pK 40) queda conectado por carretera con el PAET de Oroloma de la Línea HSR Fresno-San Francisco (Golden Gate Alternative). La última parte del trazado de la Línea HSR Fresno-Sacramento (Stockton Arch Alternative), coincide en alineación y rasante con la Línea HSR San Francisco-Sacramento (Crossing Bay Alternative) a la altura de Roseville, donde se emplaza la gran terminal norte de la red de California, desde la que se unirá ésta con la de Nevada, por Reno. This article forras the fourth part of the series entitled "High Speed Railway in California (CHSRS)". It addresses the "Stockton Arch" alternative, which the FARWESTProjectpresents in scheduling and in alignment as to that provided for by the Authority (CHSRA) for the Fresno-Sacramento HSR Line. The latter runs from the grand Fresno Terminal (located in the outskirts to the southwest ofthe city) through the south segment ofthe "inland sea" (which oceupied the current Central Valley in the Upper Tertiary) to Stockton and through the north segment to Sacramento. The Ripperdan TSAP (post ofpassing and stabling trains), — kilometer point 40, conneets with the Oroloma TSAP ofthe Fresno-San Francisco HSR Line (Golden Gate Alternative) by road. The last part of the Fresno-Sacramento HSR Line alignment (Stockton Arch Alternative), coincides in alignment and grade with the San Francisco-Sacramento HSR Line (Crossing Bay Alternative) at Roseville, where the great north terminal ofthe California network is located, from which the latter will be linked with Nevada s network through Reno.
Resumo:
Implantación de la Red de Alta velocidad Ferroviaria en California. Tramo Fresno-Los Angeles-San Diego. Este artículo, tercera parte de la serie que describe la red de Alta Velocidad Ferroviaria de California (CHSRS), se ocupa de la línea Fresno-Los Angeles Airport-San Diego Airport, con el trazado propuesto en la Alternativa Missions Trail del Proyecto FARWEST, caracterizada por el paso directo de las montañas de Tehachapi, mediante dos grandes túneles de 27,5 Km (17 mile) y 25,6 Km (15,9 mile) de longitud. También por el emplazamiento de la estación terminal de Los Angeles, junto al Aeropuerto Internacional de Los Angeles y la sustitución de la circunvalación ferroviaria de la aglomeración urbana de Los Angeles, a través de Inland Empire, por el ramal Anaheim-Riverside, que da acceso a esa región, y que es cabecera de la futura Dessert Express a Las Vegas. The third of a series describing the California High Speed Railway (CHSRS), this article refers to the Fresno-Los Angeles Airport-San Diego Airport line, with the alignment as proposed in the Missions Trail Alternative of the FARWEST Project, characterized by the direct Tehachapi mountain pass through two large tunnels 27.5 Km (17 miles) and 25.6 Km (15.9 miles) long and also to the siting of the Los Angeles terminal station next to the Los Angeles International Airport and the replacement of the Los Angeles urban conglomeration railway by-pass through Inland Empire, by the Anaheim-Riverside branch providing access to that region and which is the head of the future Desert Express to Las Vegas.
Resumo:
Este proyecto aborda el estudio geotécnico para la cimentación del terraplén de acceso a un paso superior sobre el tramo Albatera-Elche, incluido en la Línea de Alta Velocidad Madrid-Castilla La Mancha-Comunidad Valenciana-Región de Murcia. Con el fin de identificar y clasificar los materiales del terreno de cimentación, se analiza el marco geológico regional y local del área de estudio. En el proyecto se presentan los resultados obtenidos en la campaña de reconocimiento de campo y en los ensayos realizados en laboratorio, a partir de los cuales se realiza la caracterización geotécnica de los materiales y se determinan sus parámetros geotécnicos. Asimismo, se considera la singular problemática geotécnica de la zona de estudio, por lo que se analiza la estabilidad global del terraplén, los tiempos de consolidación del terreno y se realiza una estimación de asientos. De acuerdo a todos los cálculos y consideraciones realizadas, se determinan los tratamientos de mejora y refuerzo del terreno de cimentación. Por último, se evalúan los costes derivados de la campaña de reconocimiento geotécnico y de la redacción del presente estudio. ABSTRACT This project is a geotechnical report for the foundation of the access embankment to an overpass in the railway section Albatera-Elche, included in the High Speed Rail line Madrid-Castilla La Mancha-Comunidad Valenciana-Región de Murcia. In order to identify and classify the foundation soil materials, the regional and local geological frame of the study area is analyzed. The results of the field survey and laboratory tests performed are displayed in the project, from which the geotechnical characterization of materials is made and geotechnical parameters have been determined. It is also considered the special geotechnical problems in the study area, so the overall stability of the embankment and ground consolidation times are analyzed, as well as an estimate of ground settlement is also made. According to all calculations and considerations made, treatments to improve and strengthen the foundation soil are determined. Finally, the costs of the geotechnical campaign and the elaboration of this report are evaluated.
Resumo:
Los pasos inferiores son muy numerosos en las líneas de ferrocarril. Su comportamiento dinámico ha recibido mucha menos atención que el de otras estructuras como los puentes, pero su elevado número hace que su estudio sea económicamente relevante con vista a optimizar su forma, manteniendo la seguridad. El proyecto de puentes según el Eurocódigo incluye comprobaciones de estados límite de tensiones bajo carga dinámica. En el caso de pasos inferiores, las comprobaciones pueden resultar tan costosas como aquellas de puentes, pese a que su coste es mucho menor. Por tanto, se impone la búsqueda de unas reglas de cálculo simplificado que pongan en consonancia el coste de la estructura con el esfuerzo necesario para su proyecto. Este artículo propone un conjunto de reglas basadas en un estudio paramétrico = Underpasses are common in modern railway lines. Wildlife corridors and drainage conduits often fall into this category of partially buried structures. Their dynamic behavior has received far less attention than that of other structures such as bridges, but their large number makes their study an interesting challenge from the viewpoint of safety and cost savings. The bridge design rules in accordance with the Eurocode involve checks on stresses according to dynamic loading. In the case of underpasses, those checks may be as much as those for bridges. Therefore, simplified design rules may align the design effort with their cost. Such a set of rules may provide estimations of response parameters based on the key parameters influencing the result. This paper contains a proposal based on a parametric study.
Resumo:
La mejora continua de los procesos de fabricación es fundamental para alcanzar niveles óptimos de productividad, calidad y coste en la producción de componentes y productos. Para ello es necesario disponer de modelos que relacionen de forma precisa las variables que intervienen en el proceso de corte. Esta investigación tiene como objetivo determinar la influencia de la velocidad de corte y el avance en el desgaste del flanco de los insertos de carburos recubiertos GC1115 y GC2015 y en la rugosidad superficial de la pieza mecanizada de la pieza en el torneado de alta velocidad en seco del acero AISI 316L. Se utilizaron entre otros los métodos de observación científica, experimental, medición, inteligencia artificial y estadísticos. El inserto GC1115 consigue el mejor resultado de acuerdo al gráfico de medias y de las ecuaciones de regresión múltiple de desgaste del flanco para v= 350 m/min, mientras que para las restantes velocidades el inserto GC2015 consigue el mejor desempeño. El mejor comportamiento en cuanto a la rugosidad superficial de la pieza mecanizada se obtuvo con el inserto GC1115 en las velocidades de 350 m/min y 400 m/min, en la velocidad de 450 m/min el mejor resultado correspondió al inserto GC2015. Se analizaron dos criterios nuevos, el coeficiente de vida útil de la herramienta de corte en relación al volumen de metal cortado y el coeficiente de rugosidad superficial de la pieza mecanizada en relación al volumen de metal cortado. Fueron determinados los modelos de regresión múltiple que permitieron calcular el tiempo de mecanizado de los insertos sin que alcanzaran el límite del criterio de desgaste del flanco. Los modelos desarrollados fueron evaluados por sus capacidades de predicción con los valores medidos experimentalmente. ABSTRACT The continuous improvement of manufacturing processes is critical to achieving optimal levels of productivity, quality and cost in the production of components and products. This is necessary to have models that accurately relate the variables involved in the cutting process. This research aims to determine the influence of the cutting speed and feed on the flank wear of carbide inserts coated by GC1115 and GC2015 and the surface roughness of the workpiece for turning dry high speed steel AISI 316L. Among various scientific methods this study were used of observation, experiment, measurement, statistical and artificial intelligence. The GC1115 insert gets the best result according to the graph of means and multiple regression equations of flank wear for v = 350 m / min, while for the other speeds the GC2015 insert gets the best performance. Two approaches are discussed, the life ratio of the cutting tool relative to the cut volume and surface roughness coefficient in relation to the cut volume. Multiple regression models were determined to calculate the machining time of the inserts without reaching the limit of the criterion flank wear. The developed models were evaluated for their predictive capabilities with the experimentally measured values.
Resumo:
Durante los años 2008 a 2010 se ha construido en España la nueva vía férrea para trenes de velocidad que unirán Valladolid con el noroeste de España. Una de las primeras fases comprende la conexión de provincias Palencia y León con un tren de 300 kilómetros/h de velocidad de proyecto.
Resumo:
El objetivo principal de esta tesis doctoral es profundizar en el análisis y diseño de un sistema inteligente para la predicción y control del acabado superficial en un proceso de fresado a alta velocidad, basado fundamentalmente en clasificadores Bayesianos, con el prop´osito de desarrollar una metodolog´ıa que facilite el diseño de este tipo de sistemas. El sistema, cuyo propósito es posibilitar la predicción y control de la rugosidad superficial, se compone de un modelo aprendido a partir de datos experimentales con redes Bayesianas, que ayudar´a a comprender los procesos dinámicos involucrados en el mecanizado y las interacciones entre las variables relevantes. Dado que las redes neuronales artificiales son modelos ampliamente utilizados en procesos de corte de materiales, también se incluye un modelo para fresado usándolas, donde se introdujo la geometría y la dureza del material como variables novedosas hasta ahora no estudiadas en este contexto. Por lo tanto, una importante contribución en esta tesis son estos dos modelos para la predicción de la rugosidad superficial, que se comparan con respecto a diferentes aspectos: la influencia de las nuevas variables, los indicadores de evaluación del desempeño, interpretabilidad. Uno de los principales problemas en la modelización con clasificadores Bayesianos es la comprensión de las enormes tablas de probabilidad a posteriori producidas. Introducimos un m´etodo de explicación que genera un conjunto de reglas obtenidas de árboles de decisión. Estos árboles son inducidos a partir de un conjunto de datos simulados generados de las probabilidades a posteriori de la variable clase, calculadas con la red Bayesiana aprendida a partir de un conjunto de datos de entrenamiento. Por último, contribuimos en el campo multiobjetivo en el caso de que algunos de los objetivos no se puedan cuantificar en números reales, sino como funciones en intervalo de valores. Esto ocurre a menudo en aplicaciones de aprendizaje automático, especialmente las basadas en clasificación supervisada. En concreto, se extienden las ideas de dominancia y frontera de Pareto a esta situación. Su aplicación a los estudios de predicción de la rugosidad superficial en el caso de maximizar al mismo tiempo la sensibilidad y la especificidad del clasificador inducido de la red Bayesiana, y no solo maximizar la tasa de clasificación correcta. Los intervalos de estos dos objetivos provienen de un m´etodo de estimación honesta de ambos objetivos, como e.g. validación cruzada en k rodajas o bootstrap.---ABSTRACT---The main objective of this PhD Thesis is to go more deeply into the analysis and design of an intelligent system for surface roughness prediction and control in the end-milling machining process, based fundamentally on Bayesian network classifiers, with the aim of developing a methodology that makes easier the design of this type of systems. The system, whose purpose is to make possible the surface roughness prediction and control, consists of a model learnt from experimental data with the aid of Bayesian networks, that will help to understand the dynamic processes involved in the machining and the interactions among the relevant variables. Since artificial neural networks are models widely used in material cutting proceses, we include also an end-milling model using them, where the geometry and hardness of the piecework are introduced as novel variables not studied so far within this context. Thus, an important contribution in this thesis is these two models for surface roughness prediction, that are then compared with respecto to different aspects: influence of the new variables, performance evaluation metrics, interpretability. One of the main problems with Bayesian classifier-based modelling is the understanding of the enormous posterior probabilitiy tables produced. We introduce an explanation method that generates a set of rules obtained from decision trees. Such trees are induced from a simulated data set generated from the posterior probabilities of the class variable, calculated with the Bayesian network learned from a training data set. Finally, we contribute in the multi-objective field in the case that some of the objectives cannot be quantified as real numbers but as interval-valued functions. This often occurs in machine learning applications, especially those based on supervised classification. Specifically, the dominance and Pareto front ideas are extended to this setting. Its application to the surface roughness prediction studies the case of maximizing simultaneously the sensitivity and specificity of the induced Bayesian network classifier, rather than only maximizing the correct classification rate. Intervals in these two objectives come from a honest estimation method of both objectives, like e.g. k-fold cross-validation or bootstrap.
Resumo:
Es conocido que las dimensiones de los puentes de ferrocarril han ido cambiando debido a las estrictas condiciones de trazado impuestas en las líneas de alta velocidad. Además, la creciente preocupación de la sociedad por cuidar y proteger el medio ambiente, reflejado en la correspondiente normativa, ha generado nuevos condicionantes en el diseño de estas infraestructuras. En concreto, se ha limitado el movimiento de grandes volúmenes de terreno particularmente en los espacios protegidos. Por estas razones, hoy en día se proyectan y construyen puentes de ferrocarril más altos y más largos en todo el mundo. En España se han construido varios viaductos de pilas altas para líneas de alta velocidad. Ejemplos de estas infraestructuras son el Viaducto O’Eixo y el Viaducto de Barbantiño, situados en la línea de alta velocidad Madrid-Galicia, Estos viaductos altos se caracterizan por tener una mayor flexibilidad lateral y una frecuencia fundamental de oscilación baja, de hasta 0.2 Hz. La respuesta dinámica de este tipo de estructura puede aumentar como consecuencia de la aproximación entre la frecuencias propias de la misma y las de excitación debidas al paso del tren y a la acción del viento. Por lo tanto, estas estructuras pueden presentar problemas a la hora de cumplir con las limitaciones impuestas en las normas de diseño de puentes de ferrocarril, y otras, para garantizar la seguridad del tráfico y el confort de los viajeros. La respuesta dinámica lateral de viaductos de pilas altas no ha sido suficientemente estudiada en la literatura científica. Se pueden intuir varios de los motivos para explicar esta carencia. El primero es la relativamente reciente aparición de este tipo de viaductos asociados al desarrollo de la alta velocidad. Por otro lado, se hace necesario, para estudiar este tema, construir nuevos modelos numéricos adecuados para el estudio de la interacción dinámica lateral del puente y del tren. La interacción entre el puente y un tren viajando sobre él es un problema dinámico no lineal, dependiente del tiempo y de acoplamiento entre los dos subsistemas que intervienen (vehículo y puente). Los dos subsistemas, que pueden ser modelados como estructuras elásticas, interaccionan el uno con el otro a través de las fuerzas de contacto, que tiene una marcada naturaleza no lineal por el rozamiento entre rueda y carril, y por la geometría de los perfiles de estos dos elementos en contacto. En esta tesis, se desarrolla la formulación completa de un modelo no lineal de interacción tren-vía-puente-viento que reproduce adecuadamente las fuerzas laterales de contacto rueda-carril, fuerzas que van a tener una gran influencia en los índices de seguridad del tráfico. Este modelo se ha validado a partir de casos resueltos en la literatura científica, y de medidas experimentales tomadas en eventos dinámicos ocurridos en los viaductos de Arroyo de Valle y Arroyo de las Piedras. Puentes altos que han estado monitorizados en servicio durante dos años. En los estudios realizados en este trabajo, se cuantifican, empleando el modelo construido, los niveles de seguridad del tráfico y de confort de los pasajeros de trenes ligeros de alta velocidad, como el tren articulado AVE S-100, que viajan sobre viaductos altos sometidos, o no, a fuertes vientos laterales racheados. Finalmente, se ha obtenido el grado de mejora de la seguridad del tráfico y del confort de los viajeros, cuando se emplean pantallas anti-viento en el tablero y amortiguadores de masa sintonizados en la cabeza de las pilas de un viaducto alto. Resultando, el uso simultaneo de estos dos dispositivos (pantallas y amortiguadores de masa), en puentes altos de líneas de alta velocidad, una opción a considerar en la construcción de estas estructuras para elevar significativamente el nivel de servicio de las mismas. It is known that dimensions of railway bridges have been changing due to the strict high-speed lines layout parameters. Moreover, the growing concern of society to take care of and protect the environment, reflected in the corresponding regulations, has created new environment requirements for the design of these infrastructures. Particularly, the mentioned regulations do not allow designers to move far from terrain to build these railway lines. Due to all these reasons, longer and higher railway bridges are being designed and built around the world. In Spain, several high pier railway viaducts have been built for high speed lines. Barbantiño Viaduct and Eixo Viaduct, belonging to the Madrid-Galicia high speed line, are examples of this kind of structures. These high viaducts have great lateral flexibility and a low fundamental vibration frequency of down to 0.2 Hz. The dynamic response of high speed railway bridges may increase because of the approximation between the natural viaduct frequencies and the excitation ones due to the train travel and the wind action. Therefore, this bridge response could not satisfy the serviceability limits states, for traffic safety and for passenger comfort, considered by the design standards of high speed bridges. It is difficult to find papers in the scientific literature about the lateral response of high-speed trains travel over long viaducts with high piers. Several reasons could explain this issue. On one hand, the construction of this kind of viaduct is relatively recent and it is associated to the development of the high speed railway. On the other hand, in order to study the dynamic lateral interaction between the train and the high bridge, it is necessary to build new numerical and complex models. The interaction between the bridge-track subsystem and the vehicle subsystem travelling over the bridge is a coupling, nonlinear and time dependent problem. Both subsystems, train and bridge, which can be modelled as elastic structures, interact each other through the contact forces. These forces have a strong nonlinear nature due to the friction and the geometry of rail and wheel profiles. In this thesis, the full formulation of a train-track-bridge-wind nonlinear interaction model is developed. This model can reproduce properly the lateral contact wheel-rail forces, which have a great influence on traffic safety indices. The validation of the model built has been reached through interaction solved cases found in the scientific literature and experimental measures taken in dynamic events which happened at Arroyo de las Piedras and Arroyo del Valle Viaducts. These high bridges have been controlled during two years of service by means of structural health monitoring. In the studies carried out for this thesis, the levels of traffic safety and passenger comfort are quantified using the interaction model built, in the cases of high speed and light trains, as AVE S-100, travelling over high pier bridges and with or without lateral turbulent winds acting. Finally, the improvement rate of the traffic safety and passenger comfort has been obtained, when wind barriers are used at the bridge deck and tuned mass dampers are installed at the pier heads of a high viaduct. The installation of both devices, wind barriers and tuned mass damper, at the same time, turned out to be a good option to be considered in the design of high pier railway viaducts, to improve significantly the serviceability level of this kind of structures.
Resumo:
El comportamiento dinámico de los puentes de ferrocarril, tanto convencional como de alta velocidad, constituye uno de los criterios de diseño más relevantes en la actualidad, puesto que bajo situaciones resonantes la amplificación dinámica que se produce puede llegar a ser muy elevada, no resultando válidas las metodologías utilizadas tradicionalmente. De igual forma, la amplificación dinámica suele llevar asociada la aparición de inestabilidades de la vía relacionadas con vibraciones excesivas de la capa de balasto, las cuales comprometen los estados límite de servicio de la estructura y por lo tanto no permiten garantizar el confort de los pasajeros. Para analizar el comportamiento dinámico de estructuras semi-enterradas en líneas de alta velocidad se decide llevar a cabo el presente Trabajo Fin de Máster en colaboración con la Subdirección de Ingeniería e Innovación de Adif. En este contexto, los objetivos principales de esta investigación comprenden la revisión del estado actual de conocimiento relativo a cálculo y evaluación dinámica, el análisis de tipologías de estructuras semi-enterradas de alguna de las líneas de alta velocidad gestionadas por Adif, así como la elaboración de distintos modelos numéricos de Elementos Finitos que permitan contrastar las medidas experimentales obtenidas en la campaña de instrumentación realizada. Por tanto, se realiza un estudio detallado del paso inferior seleccionado como representativo de la LAV Madrid - Barcelona - Frontera Francesa por medio de modelos numéricos en 2 y 3 dimensiones, desarrollados en FEAP v8.1 (2007). Estos modelos son calibrados en base a las aceleraciones máximas registradas en la campaña instrumental, así como al estudio del contenido frecuencial de cada uno de los sensores dispuestos. La resolución de los modelos se lleva a cabo por medio de una descomposición modal. Por último, en lo que se refiere a resultados obtenidos, destacar que los modelos desarrollados tras la calibración reproducen de forma fiel el comportamiento dinámico del paso inferior seleccionado bajo el eje activo de circulación. Así, se puede concluir que este tipo de estructuras semi-enterradas no se ven comprometidas ante la acción dinámica de las composiciones ferroviarias consideradas, tanto para las velocidades actuales de circulación como para previsibles incrementos de estas.
Resumo:
La aparición del tren de alta velocidad en Europa en las últimas décadas del siglo XX supuso el resurgir de un medio de transporte en progresivo declive desde la popularización del automóvil y del avión. La decadencia del ferrocarril había supuesto en muchos casos el abandono, o incluso la demolición, de estaciones históricas y el deterioro de su entorno urbano. Como reacción a esa desatención surgió, también en el último cuarto de siglo, una mayor conciencia social preocupada por la conservación del patrimonio construido del ferrocarril. La necesidad de adaptación de las grandes estaciones de ferrocarril para dar servicio al nuevo sistema de transporte, junto con el interés por poner en valor sus construcciones históricas y su céntrico entorno, ha dado como resultado la realización de importantes transformaciones. El objeto de la presente investigación es el estudio de las transformaciones que han sufrido las grandes estaciones europeas del siglo XIX con la llegada del tren de alta velocidad, profundizando de manera especial en el caso más significativo que tenemos en nuestro país: la estación de Atocha. En el ámbito europeo es donde se localizan los ejemplos más relevantes de estaciones que tuvieron gran trascendencia en el siglo XIX y que ahora, con la llegada de la Alta Velocidad, vuelven a recuperar su grandeza. En España, el crecimiento de la Alta Velocidad en los últimos años ha sido extraordinario, hasta situarse como el segundo país del mundo con más kilómetros de líneas de alta velocidad en operación y, en consecuencia, se ha construido un gran número de estaciones adaptadas a este servicio. El caso más notable es el de la estación de Atocha, que desde la llegada del AVE en 1992 hasta el día de hoy, se ha convertido en uno de los complejos ferroviarios más importantes del mundo. El trabajo parte del estudio de otros referentes europeos, como las Gares de París, la estación de St Pancras en Londres y de otras cinco estaciones del centro de Europa –Amsterdam Centraal, Antwerpen Centraal, Köln Hauptbahnhof, Frankfurt (Main) Hauptbahnhof y la Gare de Strasbourg–, para establecer el marco analítico sobre el que se profundiza con la estación de Atocha. El proceso de transformación de la estación de Atocha se ha gestado a través de una serie de proyectos que han ido configurando la estación hasta el momento actual y planteando la previsión de futuro: el proyecto del Plan General de Madrid, el concurso de ideas para el diseño de la estación, la estación de Cercanías, la estación de Alta Velocidad y Largo Recorrido, la ampliación de esta para separar los flujos por niveles, los Estudios Informativos del Nuevo Complejo Ferroviario de la Estación de Atocha y su primera fase de construcción. Estos siete proyectos son objeto de un análisis en tres niveles: análisis cronológico, análisis funcional y análisis formal. La estación de Atocha fue la primera estación histórica europea en sufrir una gran transformación vinculada a la llegada de la Alta Velocidad. Aporta el entendimiento de la estación como un todo y la intermodalidad como sus principales valores, además de la gran mejora urbana que supuso la «operación Atocha», y adolece de ciertas carencias en su desarrollo comercial, vinculadas en parte a la presencia del jardín tropical, y de un pobre espacio en las salas de embarque para los pasajeros de salidas. La estación de Atocha completa su transformación a partir de su renovación funcional, manteniendo la carga simbólica de su historia. De la confrontación del caso de Atocha con otras importantes estaciones europeas resulta la definición de las principales consecuencias de la llegada de la Alta Velocidad a las grandes terminales europeas y la identificación de los elementos clave en su transformación. Las consecuencias principales son: la potenciación de la intermodalidad con otros medios de transporte, el desarrollo comercial no necesariamente destinado a los usuarios de los servicios ferroviarios, y la puesta en valor de la antigua estación y de su entorno urbano. Por su parte, los elementos clave en la transformación de las grandes estaciones tienen que ver directamente con la separación de flujos, el entendimiento de la estación por niveles, la dotación de nuevos accesos laterales y la construcción de una nueva gran cubierta para los nuevos andenes. La preeminencia de unos elementos sobre otros depende del carácter propio de cada estación y de cada país, de la magnitud de la intervención y, también, de la estructura y composición de los equipos encargados del diseño de la nueva estación. En la actualidad, nos encontramos en un momento interesante respecto a las estaciones de Alta Velocidad. Tras el reciente atentado frustrado en el Thalys que viajaba de Ámsterdam a París, se ha acordado establecer controles de identidad y equipajes en todas las estaciones de la red europea de alta velocidad, lo que implicará modificaciones importantes en las grandes estaciones que, probablemente, tomarán el modelo de la estación de Atocha como referencia. ABSTRACT The emergence of the high speed train in Europe in the last few decades of the 20th century represented the resurgence of a means of transport in progressive decline since the popularization of the car and the airplane. The railway decay brought in many cases the abandonment, or even the demolition, of historical stations and the deterioration of its urban environment. In response to that neglect, a greater social awareness towards the preservation of the railway built heritage raised up, also in the last quarter-century. The need for adaptation of the great railway stations to serve the new transport system, along with the interest in enhancing the historical buildings and its central locations, had resulted in important transformations. The subject of current investigation is the study of the transformations that the great 19th century European stations have experienced with the arrival of the high speed rail, deepening in particular in the most significant case we have in Spain: Atocha railway station. At European level is where the most relevant examples of stations which have had a great significance in the 19th century and now, with the arrival of the high speed train, have regain their greatness, are located. In Spain, the growth of the high speed rail over the past few years has been outstanding. Today is the second country in the world with the longest high speed rail network in operation and, therefore, with a great number of new stations adapted to this service. The most remarkable case is Atocha station. Since the arrival of the AVE in 1992, the station has become one of the world's most important railway hub. The research starts with the study of other European reference points, as the Gares of Paris, St Pancras station in London and five other stations of Central Europe –Amsterdam Centraal, Antwerpen Centraal, Köln Hauptbahnhof, Frankfurt (Main) Hauptbahnhof y la Gare de Strasbourg–, to establish the analytical framework that will be deepen with Atocha station. The transformation process of Atocha station has been created through a number of projects that have forged the station to date and have raised the sights in the future: the project of the General Urban Development Plan, the ideas competition for the station design, the Suburban train station, the High Speed and Long Distance station, its enlargement in order to separate passenger flows in different levels, the 'Masterplans' for the new Atocha transport hub and its first phase of construction. These seven projects are under scrutiny at three levels: chronological analysis, functional analysis and formal analysis. Atocha station was the first European historical station to undergo a great transformation tied to the arrival of the high speed rail. It brings the understanding of the station as a whole and the intermodality as its greatest values, besides the great urban improvement of the 'Atocha operation', and suffers from certain shortcomings in its commercial development, partly linked to the presence of the tropical garden, and from a poor space in the departure lounges. Atocha station completes its transformation on the basis of its functional renewal, keeping the symbolic charge of its history. The confrontation of Atocha case with the great European stations results in the definition of the principal consequences of the high speed rail arrival to the great European terminals and the identification of the key elements in its transformation. The principal consequences are: the empowering of the intermodality with other means of transport, of the commercial development, not necessarily intended for railway services users, and the enhancement of the old station and its urban environment. On the other hand, the key elements in the transformation of the great stations are directly related with the separation of passenger flows, the understanding of the station in different levels, the placement of new lateral accesses and the construction of a new deck over the new platforms. The pre-eminence of some elements over the others depends on the particular nature of each station and each country, on the scale of the intervention and also in the structure and composition of the teams in charge of the new station design. Nowadays, this is an interesting time concerning the high speed rail stations. After the recent foiled terrorist attempt in the Thalys train travelling from Amsterdam to Paris, it was agreed to establish passenger and luggage controls in every European high speed rail station. This will mean important changes in these great stations, which probably will take Atocha station's model as a reference.
Resumo:
En el tramo objeto del presente Proyecto, el trazado discurrirá por un corredor nuevo en dirección similar a la autovía de la Plata (A-66) y la carretera N-630, atravesando los términos municipales de Cañaveral y Garrovillas de Alconétar. Es importante destacar que la creación de esta LAV tiene como objetivo la unión de dos importantes ciudades dentro del panorama europeo, como son Madrid y Lisboa. A pesar de que el tramo que aquí se trata pertenece al tramo Madrid – Extremadura, el primer objetivo y principal era la creación de la línea Madrid – Lisboa. La situación económica de Portugal hizo que se frenase todo proyecto relativo a la Alta Velocidad en terreno portugués, quedando aplazada la construcción del tramo que va desde la frontera entre España y Portugal hasta Lisboa
Resumo:
Este trabajo presenta resultados que se proponen aclarar ulteriormente,los aspectos morfológicos y termodinámicos del medio interestelar en las regiones periféricas de la galaxia.Se divide en una parte de análisis eminentemente teórico,en el cual se postura una estructura jerárquica del gas, en tres fases de temperatura y densidades distintas. Y en una parte de carácter observacional,en el cual se presentan los resultados de observaciones radioastronómicas que tienden a corroborar los resultados teóricos.El cuadro resultante propuesto por este estudio es el de un gas galáctico periférico conformado en estructuras nebulares, que participan en la rotación galáctica y que estando presumiblemente a grandes distancias,presentan altos valores de la velocidad radial; pueden ser interpretadas como representativa de dos fases en equilibrio de presión, térmico y de ionización entre ellas y con una tercera fase, “internebular”,a temperatura mayor que 20000º K.
Resumo:
Hace más de cuatro décadas en Argentina comenzó un proceso de desarticulación del sistema ferroviario que culminó con la privatización de los servicios. Con ello, han dejado de funcionar la gran mayoría de los trenes interurbanos de pasajeros con consecuencias sobre el ordenamiento territorial¬. En ese contexto, entendiendo que la disposición y características de las redes de transporte inciden en la organización del espacio, y ante la reciente formulación de proyectos de trenes de alta velocidad para nuestro país, resulta ineludible reflexionar sobre la política de transporte y territorial. Es en ese sentido, nos preguntamos ¿Qué relación se plantea entre las redes y los asentamientos de población?, ¿Qué características asumen estos ferrocarriles? y, finalmente ¿Cuáles serían las implicancias territoriales de la implementación de la alta velocidad en el contexto en que se encuentra hoy nuestra red ferroviaria? Intentando responder a dichas preguntas, se reflexiona sobre la relación entre el transporte y el territorio, particularmente respecto al transporte ferroviario de alta velocidad. Se recogen experiencias de países como España, Francia y Alemania, y se compara la evolución y las características que fueron adoptando las redes de altas velocidades en dichos países con las que asumirían los proyectos planteados para nuestro país.
Resumo:
L'objectiu central de la tesi és estudiar els processos que permeten aconseguir un desenvolupament local a llarg termini de les ciutats mitjanes a partir de la implantació d'una gran infrastructura com el Tren d'Alta Velocitat (TAV). Es parteix de la hipòtesi que el desenvolupament local urbà a partir del TAV depèn de factors objectius i de factors subjectius (dels subjectes), uns factors que prenen una forma particular en el desenvolupament de les ciutats mitjanes. La tesi es divideix en una primera part teòrica i segona de més aplicada. Diversos autors han arribat a la conclusió que la relació tradicional que s'ha donat entre les infrastructures de transport i territori parteix d'uns paradigmes deterministes, que s'exemplifiquen amb una relació de "causa-efecte". Per aquest motiu, s'han criticat els estudis sobre els efectes socioeconòmics de les infrastructures de transport, així com el mateix concepte d'"efecte". Aquesta crítica es repeteix els estudis sobre el TAV i les ciutats mitjanes, que arriben a la conclusió que el desenvolupament econòmic no és un fet automàtic i que no es poden predir les conseqüències a mig i llarg termini del TAV. El desenvolupament local a partir del TAV, doncs, estaria relacionat amb tres elements principals. En primer lloc, entendre que la ciutat -i el territori- és un fenomen complex i, com a tal, cal abordar-lo des de la teoria dels sistemes complexos. En segon lloc, la gran infrastructura ha de convertir-se en un recurs endogen (interconnexió amb la xarxa local d'actors i territorialització en el milieu de la ciutat) per a que pugui contribuir al desenvolupament. En tercer lloc, la dinàmica de governance dels actors és primordial, i es divideix en la gestió interna de la xarxa local (projecte local) i la gestió multinivell de les administracions. En base als referents teòrics, es construeix una metodologia per avaluar el grau de desenvolupament local que ha comportat el TAV en tres ciutats mitjanes de l'arc mediterrani europeu, Lleida, Avinyó i Novara, situades respectivament a Espanya, França i Itàlia. La metodologia preveu l'estudi d'aspectes tècnics de la ciutat com els de transport (Posició territorial de la ciutat a partir del TAV, Característiques de l'estació TAV), urbanístics (Model urbanístic a escala municipal/urbana, Model urbanístic a escala de l'estació) i econòmics (Diferents projectes econòmics de la ciutat relacionats amb el TAV). També preveu l'estudi d'aspectes organitzatius externs (Els agents supralocals i els seus projectes, Grau de conflictivitat i cooperació en les relacions dels agents locals i supralocals) i interns (Capacitat de creació d'un projecte de ciutat a partir del TAV, Agents que participen en el projecte local i la seva dinàmica, Àmbit territorial dels projectes). Finalment s'efectua una avaluació del procés i dels resultats del desenvolupament local. Com a conclusió es demostra que el procés de desenvolupament local a partir de les grans infrastructures de transport depèn, en bon part, de la capacitat de governance. Depèn, per un cantó, de la capacitat dels agents locals d'elaborar un projecte de desenvolupament i liderar unes estratègies d'aprofitament i, de l'altre, de la capacitat dels agents del territori (estatals, regionals, locals) de crear aliances i cooperació per planificar la infrastructura de transport. Finalment es presenten un seguit de recomanacions a les ciutats que volen planificar l'arribada del TAV per a que contribueixi a un desenvolupament amb les característiques d'eficàcia, sostenibilitat, productivitat i equitat.
Resumo:
Nine swines of the White Large race were used for study of the process of bony repair after osteotomy with rotating instruments of low and high-speed, with and without liquid refrigeration. The authors observed, through double blind histopathological analysis, that in every analyzed operative time, the bony repair was processed more appropriately when the osteotomies were accomplished with liquid refrigeration. In the final postoperative times, of fourteen and twenty-eight days, the best results of bony repair were observed in the osteotomy accomplished with drills of low rotation and with liquid refrigeration, while in the postoperative time of seven days, the results of the bony repair of osteotomy accomplished with drills of high rotation and with liquid refrigeration they were better. The authors consider, still, that the process of bony repair in swine display larger proximity in the histological pictures among the studied variables, when compared with other biological models. As most of the works told in the literature it refers the use of dogs, the authors consider that the present work guarantees your importance in the sense of looking for a closer model of the man.