848 resultados para African contracts
Resumo:
Chromosome 9p21, a locus comprising the tumor suppressor genes (TSG) p16(INK4) (a) and p14(ARF) , is a common region of loss of heterozygosity (LOH) in hepatocellular carcinoma (HCC). p14(ARF) shares exon 2 with p16 in a different reading frame. p14 binds to MDM2 resulting in a stabilization of functional p53 . This study examined the roles of p14, p16 and p53 in hepatocarcinogenesis, in 37 Australian and 24 South African patients. LOH at 9p21 and 17p13.1, p14 and p16 mutation analysis, p14 and p16 promoter methylation and p14, p16 and p53 protein expression was examined. LOH at 9p21 was detected more frequently in South African HCC (P = 0.04). Comparable rates of p53 LOH were observed in Australian and South African HCC (10/22, 45%vs 13/22, 59%, respectively). Hypermethylation of the p14 promoter was more prevalent in Australian HCC than in South African HCC (17/37, 46%vs 7/24, 29%, respectively). In Australian HCC the prevalence of p14 methylation increased with age (P = 0.03). p16 promoter methylation was observed in 12/37 (32%) and 6/24 (25%) in Australian and South African HCC, respectively. Loss of p16 protein expression was detected in 14/36 Australian HCC whereas p53 protein expression was detected in 9/36. Significantly, a reciprocal relationship between 9p21 LOH and p14 promoter hypermethylation was observed (P less than or equal to0.05 ). No significant association between p14 and p53 was seen in this study. The reciprocal relationship identified indicates different pathways of tumorigenesis and likely reflects different etiologies of HCC in the two countries. (C) 2002 Blackwell Science Asia Pty Ltd.
Resumo:
O NEPAD - New Partnership for African Development - tem seus primórdios em 1996, proposto pelo atual presidente da África do Sul, Thabo Mbeki e outros líderes africanos, para erradicar a marginalização e o subdesenvolvimento africanos e promover o crescimento econômico, através da integração continental. Seus objetivos, inseridos no contexto da globalização e do African Renaissance, incorpora valores da luta antiapartheid sul-africana, restauração da auto-estima e resgate de valores pré-coloniais. O que o difere de outros planos que não deram certo na África é o vínculo inseparável entre democracia, direitos humanos, paz, governabilidade e o desenvolvimento econômico, as responsabilidades assumidas pelos participantes e a propriedade africana do plano.
Resumo:
Estudos sobre sistemas etários na África Oriental têm focado principalmente as regras que regulam recrutamento, com ênfase ao modo em que se mantém a autoridade e os cargos políticos, assim como à natureza não-militar e não-política dos sistemas etários. Apesar de contribuírem enormemente para a nossa compreensão das organizações etárias na região, esses estudos não lidam explicitamente com a questão da propriedade e com o modo em que ela constitui um dos principais focos para atividades de organizações etárias. De fato, quando se menciona a propriedade, ela é vista em função das famílias e, portanto, do parentesco. Apresentando e discutindo uma variedade de casos envolvendo o modo em que a propriedade é tratada por lideranças de um conjunto etário/geracional e residentes Hor e não-Hor do território Hor, este estudo conclui que a posse, o uso e controle de recursos não constitui um assunto que pertence exclusivamente à esfera de grupos de parentesco; trata-se também de uma questão central para organizações etárias. Apesar de haver, aparentemente, alguma ambigüidade decorrente da ênfase equilibrada que os Hor dedicam ao parentesco e às categorias etárias e suas complementaridades em assuntos relacionados à economia, à religião e ao direito, dados referentes aos Hor revelam uma tendência a tratar questões referentes ao uso de recursos cruciais em termos de organização etária. Trata-se de um estudo sobre os Hor (Arbore), um povo pastoril do Sudoeste da Etiópia.
Resumo:
Electricity markets are systems for effecting the purchase and sale of electricity using supply and demand to set energy prices. Two major market models are often distinguished: pools and bilateral contracts. Pool prices tend to change quickly and variations are usually highly unpredictable. In this way, market participants often enter into bilateral contracts to hedge against pool price volatility. This article addresses the challenge of optimizing the portfolio of clients managed by trader agents. Typically, traders buy energy in day-ahead markets and sell it to a set of target clients, by negotiating bilateral contracts involving three-rate tariffs. Traders sell energy by considering the prices of a reference week and five different types of clients. They analyze several tariffs and determine the best share of customers, i.e., the share that maximizes profit. © 2014 IEEE.
Resumo:
Journal of Ethnic and Migration Studies, Vol.34, n.2,pp. 253 — 269
Resumo:
Business History, Vol 50 No 2, p147-162
Resumo:
Seismic ambient noise tomography is applied to central and southern Mozambique, located in the tip of the East African Rift (EAR). The deployment of MOZART seismic network, with a total of 30 broad-band stations continuously recording for 26 months, allowed us to carry out the first tomographic study of the crust under this region, which until now remained largely unexplored at this scale. From cross-correlations extracted from coherent noise we obtained Rayleigh wave group velocity dispersion curves for the period range 5–40 s. These dispersion relations were inverted to produce group velocity maps, and 1-D shear wave velocity profiles at selected points. High group velocities are observed at all periods on the eastern edge of the Kaapvaal and Zimbabwe cratons, in agreement with the findings of previous studies. Further east, a pronounced slow anomaly is observed in central and southern Mozambique, where the rifting between southern Africa and Antarctica created a passive margin in the Mesozoic, and further rifting is currently happening as a result of the southward propagation of the EAR. In this study, we also addressed the question concerning the nature of the crust (continental versus oceanic) in the Mozambique Coastal Plains (MCP), still in debate. Our data do not support previous suggestions that the MCP are floored by oceanic crust since a shallow Moho could not be detected, and we discuss an alternative explanation for its ocean-like magnetic signature. Our velocity maps suggest that the crystalline basement of the Zimbabwe craton may extend further east well into Mozambique underneath the sediment cover, contrary to what is usually assumed, while further south the Kaapval craton passes into slow rifted crust at the Lebombo monocline as expected. The sharp passage from fast crust to slow crust on the northern part of the study area coincides with the seismically active NNE-SSW Urema rift, while further south the Mazenga graben adopts an N-S direction parallel to the eastern limit of the Kaapvaal craton. We conclude that these two extensional structures herald the southward continuation of the EAR, and infer a structural control of the transition between the two types of crust on the ongoing deformation.
Resumo:
We report the first case of African histoplasmosis diagnosed in Brazil. The patient was an immigrant from Angola who had come to Brazil six months after the appearance of the skin lesion. The skin of the right retroauricular area was the only site of involvement. The diagnosis was established by direct mycologic examination, culture and by histopathologic examination of the lesion. The patient was successfully treated with Itraconazole 100mg a day for 52 days. No recurrent skin lesions were observed during the ten month follow-up period.
Resumo:
All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.
Resumo:
Poster presented in The 28th GI/ITG International Conference on Architecture of Computing Systems (ARCS 2015). 24 to 26, Mar, 2015. Porto, Portugal.
Resumo:
This paper presents a decision support methodology for electricity market players’ bilateral contract negotiations. The proposed model is based on the application of game theory, using artificial intelligence to enhance decision support method’s adaptive features. This model is integrated in AiD-EM (Adaptive Decision Support for Electricity Markets Negotiations), a multi-agent system that provides electricity market players with strategic behavior capabilities to improve their outcomes from energy contracts’ negotiations. Although a diversity of tools that enable the study and simulation of electricity markets has emerged during the past few years, these are mostly directed to the analysis of market models and power systems’ technical constraints, making them suitable tools to support decisions of market operators and regulators. However, the equally important support of market negotiating players’ decisions is being highly neglected. The proposed model contributes to overcome the existing gap concerning effective and realistic decision support for electricity market negotiating entities. The proposed method is validated by realistic electricity market simulations using real data from the Iberian market operator—MIBEL. Results show that the proposed adaptive decision support features enable electricity market players to improve their outcomes from bilateral contracts’ negotiations.
Resumo:
BACKGROUND: The Ethiopian mountain adder (Bitis parviocula) is a viperid known only from a few locations in southwestern Ethiopia. METHODS: a total of 30 µg of B. arietans and B. parviocula venoms were run on a 10-20% Tricine gel. To assay lethality dose fifty (LD50), five groups of eight mice for each venom were used. Hemorrhagic activity for crude venom was tested. Fibrinogenolytic activity of crude venom was measured using (2.5 mg/mL) of fibrinogen solution and (0.03 mg/mL) of crude venom. Gelatinase activity of the venom was tested on a Kodak X-OMAT TM film. Crude venoms of B. parviocula and B. arietans were tested for their abilities to affect clotting time, clotting rate and platelet function on whole human blood. RESULTS: The (SAIMR) antivenom was confirmed in this study to neutralize the lethal activity of venom from Bitis parviocula. The ED50s of SAIMR antivenom on B. parviocula and B. arietans neutralized half of 18.2 and 66.7 mg of venom, respectively. The hemorrhagic activities (MHDs) of B. parviocula and B. arietans were 0.88 and 1.7 µg, respectively. Bitis arietans and B. parviocula venoms degradated α and β chains at different times. The γ chains remained unaffected. Bitis parviocula venom did not exhibit gelatinase activity, while B. arietans had a MGD of 6.9 µg. At 3 mg/mL, the crude venoms of B. parviocula and B. arietans did not significantly affect clotting time or clotting rate. CONCLUSIONS: The SAIMR antivenom is very effective in neutralizing the venom of B. parviocula and should be considered in treating envenomations by these snakes.
Resumo:
Dissertation presented to obtain the Ph.D degree in Biology