808 resultados para engineering projects management
Resumo:
In the area of Software Engineering, traceability is defined as the capability to track requirements, their evolution and transformation in different components related to engineering process, as well as the management of the relationships between those components. However the current state of the art in traceability does not keep in mind many of the elements that compose a product, specially those created before requirements arise, nor the appropriated use of traceability to manage the knowledge underlying in order to be handled by other organizational or engineering processes. In this work we describe the architecture of a reference model that establishes a set of definitions, processes and models which allow a proper management of traceability and further uses of it, in a wider context than the one related to software development.
Resumo:
This paper discusses and presents a case study of a practically oriented design project together with a few examples of implemented design projects recently incorporated into an undergraduate system course at the mechatronics engineering department in Ah-Balqa’ Applied University. These projects have had a positive impact on both the department and its graduates. The focus of these projects is the design and implementation of processor-based system. This helps graduate students cross the border between hardware design and software design. Our case study discusses the research methodology adopted for the physical development of the project, the technology used in the project, and the design experiences and outcomes.
Resumo:
In today’s modern manufacturing industry there is an increasing need to improve internal processes to meet diverse client needs. Process re-engineering is an important activity that is well understood by industry but its rate of application within small to medium size enterprises (SME) is less developed. Business pressures shift the focus of SMEs toward winning new projects and contracts rather than developing long-term, sustainable manufacturing processes. Variations in manufacturing processes are inevitable, but the amount of non-conformity often exceeds the acceptable levels. This paper is focused on the re-engineering of the manufacturing and verification procedure for discrete parts production with the aim of enhancing process control and product verification. The ideologies of the ‘Push’ and ‘Pull’ approaches to manufacturing are useful in the context of process re-engineering for data improvement. Currently information is pulled from the market and prominent customers, and manufacturing companies always try to make the right product, by following customer procedures that attempt to verify against specifications. This approach can result in significant quality control challenges. The aim of this paper is to highlight the importance of process re-engineering in product verification in SMEs. Leadership, culture, ownership and process management are among the main attributes required for the successful deployment of process re-engineering. This paper presents the findings from a case study showcasing the application of a modified re-engingeering method for the manufacturing and verification process. The findings from the case study indicate there are several advantages to implementing the re-engineering method outlined in this paper.
Resumo:
A tanulmány a Public-Private Partnership (PPP) immanens logikai kihívásai közül két kiemelt kérdést elemez: az állami fél közszolgálati-közigazgatási beágyazottságából eredő dilemmákat, valamint az állami és a magánfél eltérő kulturális hátteréből eredő feszültségek jellemzőit. A PPP projektek gyakorlati megvalósítása szempontjából e két kardinális kérdés kifinomult elméleti hátterébe nyújt bepillantást. A közszolgáltatási dilemmák közül azonosítja és tárgyalja a jogszerűség vs. eredményesség, a hatékonyság vs. eredményesség, a centralizáció vs. decentralizáció, a közérdek vs. egyéni szabadságjogok védelme, valamint a kormányzat kicsinyítése vs. jogbiztonság védelme, és a vállalkozói szemlélet vs. közszolgálatiság közti egyensúlyozás kihívásait. Az állami és az üzleti fél kulturális különbözőségének központi motívumaként a döntéshozatalbeli különbséget ragadja meg, és a bizalom szerepét hangsúlyozza a működőképes modell megtalálásának lehetőségeként. = This study analyses two cardinal issues of Public-Private Partnership (PPP) projects’ immanent challenges: the management dilemmas of public services/governance, and the tensions between the private and public parties due to their different cultural imbeddedness. It provides theoretical insights into these two issues of practical relevance. As public service management dilemmas, it identifies the trade-offs between rights vs. effectiveness, efficiency vs. effectiveness, centralization vs. decentralization, protecting the public interest vs. individual freedom, minimizing government vs. protecting human rights, the entrepreneurial approach vs. public service ethos. The study captures the cultural difference between the public and the private parties in their different approaches to decision making, while it concludes that the role of trust is key in finding feasible solutions for PPP models.
Resumo:
Everyday Millions of disposable plates, cups and utensils are used in fast food establishments, cafeterias, restaurants and homes worldwide. These single-use disable plates, cup and utensils, when of polystyrene or plastic, do not biodegrade and decompose like fruit, vegetables or meat; they only breakdown into smaller pieces on a physical level. This lack of decomposition means that these products persist and accumulate in landfills consuming the available space and contaminate the surrounding area. With an ever growing global population, the disposable waste generated annually is increasing and landfills worldwide are rapidly filling. Therefore, more landfills are needed sooner but they are expensive to create, they consume a large amount of usable space and can harm the environment. In order to reduce the dependence on landfills, the waste can be diverted through recycling programs, reducing human consumption and purchasing reusable and/or compostable materials. These methods of waste reduction would be implemented at the municipal level but it would be possible to change provincial and state legislation so that municipalities would be required to do so rather than of their own volition. If initiated worldwide than the amount of waste produced by humans would be greatly reduced and the dependence on landfills would decrease.
Resumo:
Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relationship between this approach and the regional competitiveness model as well as the KRAFT concept. There is a lot of research that focuses on sustainability in business. These studies argue that sustainability is very important to the success of a business in the future. The Project Excellence Model that analyses project success does not contain the sustainability criteria; the GPM P5 standard consists of sustainability components related either to the organizational level. To fill this gap a Project Sustainability Excellence Model (PSEM) was developed. The model was tested by interviews with managers of Hungarian for-profit and non-profit organizations. This paper introduces the PSEM and highlights the most important elements of the empirical analysis.
Resumo:
This keynote presentation will report some of our research work and experience on the development and applications of relevant methods, models, systems and simulation techniques in support of different types and various levels of decision making for business, management and engineering. In particular, the following topics will be covered. Modelling, multi-agent-based simulation and analysis of the allocation management of carbon dioxide emission permits in China (Nanfeng Liu & Shuliang Li Agent-based simulation of the dynamic evolution of enterprise carbon assets (Yin Zeng & Shuliang Li) A framework & system for extracting and representing project knowledge contexts using topic models and dynamic knowledge maps: a big data perspective (Jin Xu, Zheng Li, Shuliang Li & Yanyan Zhang) Open innovation: intelligent model, social media & complex adaptive system simulation (Shuliang Li & Jim Zheng Li) A framework, model and software prototype for modelling and simulation for deshopping behaviour and how companies respond (Shawkat Rahman & Shuliang Li) Integrating multiple agents, simulation, knowledge bases and fuzzy logic for international marketing decision making (Shuliang Li & Jim Zheng Li) A Web-based hybrid intelligent system for combined conventional, digital, mobile, social media and mobile marketing strategy formulation (Shuliang Li & Jim Zheng Li) A hybrid intelligent model for Web & social media dynamics, and evolutionary and adaptive branding (Shuliang Li) A hybrid paradigm for modelling, simulation and analysis of brand virality in social media (Shuliang Li & Jim Zheng Li) Network configuration management: attack paradigms and architectures for computer network survivability (Tero Karvinen & Shuliang Li)
Resumo:
The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.
Resumo:
The evolution and maturation of Cloud Computing created an opportunity for the emergence of new Cloud applications. High-performance Computing, a complex problem solving class, arises as a new business consumer by taking advantage of the Cloud premises and leaving the expensive datacenter management and difficult grid development. Standing on an advanced maturing phase, today’s Cloud discarded many of its drawbacks, becoming more and more efficient and widespread. Performance enhancements, prices drops due to massification and customizable services on demand triggered an emphasized attention from other markets. HPC, regardless of being a very well established field, traditionally has a narrow frontier concerning its deployment and runs on dedicated datacenters or large grid computing. The problem with common placement is mainly the initial cost and the inability to fully use resources which not all research labs can afford. The main objective of this work was to investigate new technical solutions to allow the deployment of HPC applications on the Cloud, with particular emphasis on the private on-premise resources – the lower end of the chain which reduces costs. The work includes many experiments and analysis to identify obstacles and technology limitations. The feasibility of the objective was tested with new modeling, architecture and several applications migration. The final application integrates a simplified incorporation of both public and private Cloud resources, as well as HPC applications scheduling, deployment and management. It uses a well-defined user role strategy, based on federated authentication and a seamless procedure to daily usage with balanced low cost and performance.
Resumo:
The universities rely on the Information Technology (IT) projects to support and enhance their core strategic objectives of teaching, research, and administration. The researcher’s literature review found that the level of IT funding and resources in the universities is not adequate to meet the IT demands. The universities received more IT project requests than they could execute. As such, universities must selectively fund the IT projects. The objectives of the IT projects in the universities vary. An IT project which benefits the teaching functions may not benefit the administrative functions. As such, the selection of an IT project is challenging in the universities. To aid with the IT decision making, many universities in the United States of America (USA) have formed the IT Governance (ITG) processes. ITG is an IT decision making and accountability framework whose purpose is to align the IT efforts in an organization with its strategic objectives, realize the value of the IT investments, meet the expected performance criteria, and manage the risks and the resources (Weil & Ross, 2004). ITG in the universities is relatively new, and it is not well known how the ITG processes are aiding the nonprofit universities in selecting the right IT projects, and managing the performance of these IT projects. This research adds to the body of knowledge regarding the IT project selection under the governance structure, the maturity of the IT projects, and the IT project performance in the nonprofit universities. The case study research methodology was chosen for this exploratory research. The convenience sampling was done to choose the cases from two large, research universities with decentralized colleges, and two small, centralized universities. The data were collected on nine IT projects from these four universities using the interviews and the university documents. The multi-case analysis was complemented by the Qualitative Comparative Analysis (QCA) to systematically analyze how the IT conditions lead to an outcome. This research found that the IT projects were selected in the centralized universities in a more informed manner. ITG was more authoritative in the small centralized universities; the ITG committees were formed by including the key decision makers, the decision-making roles, and responsibilities were better defined, and the frequency of ITG communication was higher. In the centralized universities, the business units and colleges brought the IT requests to ITG committees; which in turn prioritized the IT requests and allocated the funds and the resources to the IT projects. ITG committee members in the centralized universities had a higher awareness of the university-wide IT needs, and the IT projects tended to align with the strategic objectives. On the other hand, the decentralized colleges and business units in the large universities were influential and often bypassed the ITG processes. The decentralized units often chose the “pet” IT projects, and executed them within a silo, without bringing them to the attention of the ITG committees. While these IT projects met the departmental objectives, they did not always align with the university’s strategic objectives. This research found that the IT project maturity in the university could be increased by following the project management methodologies. The IT project management maturity was found higher in the IT projects executed by the centralized university, where a full-time project manager was assigned to manage the project, and the project manager had a higher expertise in the project management. The IT project executed under the guidance of the Project Management Office (PMO) has exhibited a higher project management maturity, as the PMO set the standards and controls for the project. The IT projects managed by the decentralized colleges by a part-time project manager with lower project management expertise have exhibited a lower project management maturity. The IT projects in the decentralized colleges were often managed by the business, or technical leads, who often lacked the project management expertise. This research found that higher the IT project management maturity, the better is the project performance. The IT projects with a higher maturity had a lower project delay, lower number of missed requirements, and lower number of IT system errors. This research found that the quality of IT decision in the university could be improved by centralizing the IT decision-making processes. The IT project management maturity could be improved by following the project management methodologies. The stakeholder management and communication were found critical for the success of the IT projects in the university. It is hoped that the findings from this research would help the university leaders make the strategic IT decisions, and the university’s IT project managers make the IT project decisions.
Resumo:
Short time-to-market is a key success factor in the todays’ dynamic business environment and many companies are trying to improve their product development processes. A challenge is to develop products according to the time plan and at the same time keeping the cost low and the quality high. This study focuses on the project management within the product development process in an automotive industry. The background of this study started as a request from the research and development department at the automotive company, which led to the following questions; 1) what are the most crucial factors for project success? 2) How can these factors contribute to a more successful outcome? 3) How can project management decrease product development lead time by sharing knowledge? The research approach is a case study and the data collection consist of interviews and questioners at two companies connected to project management in product development projects. Spider charts are created from the collected data containing eleven dimensions to show similarities and differences between the project managers working within the research and development department as well as between the two companies. The main conclusions are that there is a need to allow a certain level of flexibility when managing projects, in order to more easily handle late changes. Being involved in a project from the concept phase could facilitate the product development activities later on, due to a deeper understanding regarding previous decisions. Further, knowledge sharing methods, such as databases, has to be designed to be suitable for a specific organization and user friendly which enables the users to more easily search for specific types of knowledge. Lastly, a low level on the detailed focus is shown to be another success factor, however, in some cases there is still a need of this detailed focus to solve specific problems but the details may never become a higher focus than the holistic view.
Resumo:
The aim of this article is to analyze the theoretical model proposed by [Jabbour CJC, Santos FCA. Relationships between human resource dimensions and environmental management in companies: proposal of a model. Journal of Cleaner Production 2008;16(1):5 1-8.] based on the data collected in four Brazilian companies. This model investigates how the phases of the environmental management system can be linked to human resource practices in order to attain continuous improvement of a company`s environmental performance. Our aim is to contribute to a field, which has little empirical evidence. Although the interaction between the phases of the environmental management system and human resource practices is recommended by the specialized literature [Daily BE Huang S. Achieving sustainability through attention to human resource factors in environmental management. International Journal of Operations and Production Management 2001:21(12):1539-52.], the results indicate that most of the theoretical assumptions could not be confirmed in these Brazilian companies. (C) 2008 Elsevier Ltd. All rights reserved.
Resumo:
This work deals with the main contributions of human resource dimensions for the environmental management in a company. While the specialized literature concerning the technical aspects of environmental management expands, there is a gap in the bibliography: integrated approaches between human resource dimensions and environmental management. An extensive bibliographical review was undertaken in order to systematize the human resource dimensions and their contributions concerning the effectiveness of the environmental management system. A model that analyses the relationships between these dimensions and the typical phases of an environmental management system is presented, within a perspective of application for academicians and managers. (c) 2006 Elsevier Ltd. All rights reserved.
Resumo:
Many authors point out that the front-end of new product development (NPD) is a critical success factor in the NPD process and that numerous companies face difficulties in carrying it out appropriately. Therefore, it is important to develop new theories and proposals that support the effective implementation of this earliest phase of NPD. This paper presents a new method to support the development of front-end activities based on integrating technology roadmapping (TRM) and project portfolio management (PPM). This new method, called the ITP Method, was implemented at a small Brazilian high-tech company in the nanotechnology industry to explore the integration proposal. The case study demonstrated that the ITP Method provides a systematic procedure for the fuzzy front-end and integrates innovation perspectives into a single roadmap, which allows for a better alignment of business efforts and communication of product innovation goals. Furthermore, the results indicated that the method may also improve quality, functional integration and strategy alignment. (C) 2010 Elsevier Inc. All rights reserved.