933 resultados para Synthetic procedures
Resumo:
Agreed-upon procedures report on the City of Pleasanton, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Report on a review of the Central Procurement Enterprise (CPE) of the Iowa Department of Administrative Services for the period July 1, 2009 through March 31, 2013
Resumo:
The objective of this work was to determine the best conditions of use of the synthetic sex pheromone of Phyllocnistis citrella Stainton for monitoring this species in citrus groves in northeastern Brazil. Pheromone doses (0.0, 0.1, 1, 10 and 100 μg) and longevity (1, 15, 29, 43 and 57-day-old lures) and trap height (0.5, 1.5 and 2.5 m), color (green, red, and white) and model influence on P. citrella males capture were evaluated. The doses of 10 and 100 μg of the synthetic sex pheromone - a 3:1 blend of (Z,Z,E)-7,11,13-hexadecatrienal and (Z,Z)-7,11-hexadecadienal - attracted the greatest number of P. citrella males. Traps baited with these two both dosages continued to capture P. citrella males at a comparable rate for over eight weeks in citrus groves. Although there was no significant decrease in activity of both dosages until 57 days of exposure to the environment, the higher dose, as time passed, attracted significantly more P. citrella males than the lower dose. There were no significant differences in male capture in traps with synthetic sex pheromone placed at 1.5 and 2.5 m height, wich had the better results. Trap color and model did not affect male capture.
Resumo:
Agreed-upon procedures report on the City of Dallas Center, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Introduction: Evidence suggests that citrullinated fibrin(ogen) may be a potential in vivo target of anticitrullinated protein/peptide antibodies (ACPA) in rheumatoid arthritis (RA). We compared the diagnostic yield of three enzyme-linked immunosorbent assay (ELISA) tests by using chimeric fibrin/filaggrin citrullinated synthetic peptides (CFFCP1, CFFCP2, CFFCP3) with a commercial CCP2-based test in RA and analyzed their prognostic values in early RA. Methods: Samples from 307 blood donors and patients with RA (322), psoriatic arthritis (133), systemic lupus erythematosus (119), and hepatitis C infection (84) were assayed by using CFFCP- and CCP2-based tests. Autoantibodies also were analyzed at baseline and during a 2-year follow-up in 98 early RA patients to determine their prognostic value. Results: With cutoffs giving 98% specificity for RA versus blood donors, the sensitivity was 72.1% for CFFCP1, 78.0% for CFFCP2, 71.4% for CFFCP3, and 73.9% for CCP2, with positive predictive values greater than 97% in all cases. CFFCP sensitivity in RA increased to 80.4% without losing specificity when positivity was considered as any positive anti-CFFCP status. Specificity of the three CFFCP tests versus other rheumatic populations was high (> 90%) and similar to those for the CCP2. In early RA, CFFCP1 best identified patients with a poor radiographic outcome. Radiographic progression was faster in the small subgroup of CCP2-negative and CFFCP1-positive patients than in those negative for both autoantibodies. CFFCP antibodies decreased after 1 year, but without any correlation with changes in disease activity. Conclusions: CFFCP-based assays are highly sensitive and specific for RA. Early RA patients with anti-CFFCP1 antibodies, including CCP2-negative patients, show greater radiographic progression.
Resumo:
This document is specific to the state of Iowa and outlines the requirements and procedures necessary to use, distribute, and service compressed natural gas (CNG) and the equipment associated with it. Four state agencies’ requirements for CNG are covered in this document: The Iowa Utilities Board (IUB), Iowa Department of Agriculture and Land Stewardship (IDALS)/ Weights and Measures Bureau, Iowa Department of Revenue (IDR) and Iowa Department of Public Safety (IDPS) / Division of the State Fire Marshal.
Resumo:
Agreed-upon procedures report on the City of Whitten, Iowa for the period January 1, 2015 through December 31, 2015
Resumo:
Agreed-upon procedures report on the City of Granger, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Breda, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Ainsworth, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Victor, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Ely, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Remsen, Iowa and the Remsen Municipal Utilities for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Wall Lake, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Bedford, Iowa for the period July 1, 2014 through June 30, 2015