793 resultados para Preliminary contract
Resumo:
Weekly letting report.
Resumo:
Pursuant to SF 2088, Section 64 - the Iowa Department of Transportation submits the Report for Contract Services and Training for Jan. 1, 2011 - June 30, 2011.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
Guilbert ER, Morin D, Guilbert AC, Gagnon H, Robitaille J, Richardson M. International Journal of Nursing Practice 2011; 17: 315-321 Task-shifting in the delivery of hormonal contraceptive methods: Validation of a questionnaire and preliminary results In order to palliate the access problem to effective contraceptive methods in Quebec, Canada, as well as to legitimate nurses' practices in family planning, a collaborative agreement was developed that allow nurses, in conjunction with pharmacists, to give hormonal contraceptives to healthy women of reproductive age for a 6 month period. Training in hormonal contraception was offered to targeted nurses before they could begin this practice. A questionnaire, based on Rogers's theory of diffusion of innovations, was elaborated and validated to specifically evaluate this phenomenon. Preliminary results show that the translation of training into practice might be suboptimal. The validated questionnaire can now be used to fully understand the set of factors influencing this new practice.
Resumo:
Weekly letting report.
Resumo:
The CIAO Study is a multicenter observational study currently underway in 66 European medical institutions over the course of a six-month study period (January-June 2012).This preliminary report overviews the findings of the first half of the study, which includes all data from the first three months of the six-month study period.Patients with either community-acquired or healthcare-associated complicated intra-abdominal infections (IAIs) were included in the study.912 patients with a mean age of 54.4 years (range 4-98) were enrolled in the study during the first three-month period. 47.7% of the patients were women and 52.3% were men. Among these patients, 83.3% were affected by community-acquired IAIs while the remaining 16.7% presented with healthcare-associated infections. Intraperitoneal specimens were collected from 64.2% of the enrolled patients, and from these samples, 825 microorganisms were collectively identified.The overall mortality rate was 6.4% (58/912). According to univariate statistical analysis of the data, critical clinical condition of the patient upon hospital admission (defined by severe sepsis and septic shock) as well as healthcare-associated infections, non-appendicular origin, generalized peritonitis, and serious comorbidities such as malignancy and severe cardiovascular disease were all significant risk factors for patient mortality.White Blood Cell counts (WBCs) greater than 12,000 or less than 4,000 and core body temperatures exceeding 38°C or less than 36°C by the third post-operative day were statistically significant indicators of patient mortality.
Resumo:
The increasing availability and precision of digital elevation model (DEM) helps in the assessment of landslide prone areas where only few data are available. This approach is performed in 6 main steps which include: DEM creation; identification of geomorphologic features; determination of the main sets of discontinuities; mapping of the most likely dangerous structures; preliminary rock-fall assessment; estimation of the large instabilities volumes. The method is applied to two the cases studies in the Oppstadhornet mountain (730m alt): (1) a 10 millions m3 slow-moving rockslide and (2) a potential high-energy rock falling prone area. The orientations of the foliation and of the major discontinuities have been determined directly from the DEM. These results are in very good agreement with field measurements. Spatial arrangements of discontinuities and foliation with the topography revealed hazardous structures. Maps of potential occurrence of these hazardous structures show highly probable sliding areas at the foot of the main landslide and potential rock falls in the eastern part of the mountain.
Resumo:
Weekly letting report.