984 resultados para Piling (Civil engineering)
Resumo:
For the further noise reduction in the future, the traffic management which controls traffic flow and physical distribution is important. To conduct the measure by the traffic management effectively, it is necessary to apply the model for predicting the traffic flow in the citywide road network. For this purpose, the existing model named AVENUE was used as a macro-traffic flow prediction model. The traffic flow model was integrated with the road vehicles' sound power model, and the new road traffic noise prediction model was established. By using this prediction model, the noise map of entire city can be made. In this study, first, the change of traffic flow on the road network after the establishment of new roads was estimated, and the change of the road traffic noise caused by the new roads was predicted. As a result, it has been found that this prediction model has the ability to estimate the change of noise map by the traffic management. In addition, the macro-traffic flow model and our conventional micro-traffic flow model were combined, and the coverage of the noise prediction model was expanded.
Resumo:
Property law is one of the key elements in any property-based degree program. In particular, an understanding of 'property law' is one of the required knowledge fields for inclusion in property programs accredited by professional institutes such as the Royal Institution of Chartered Surveyors, the Appraisal Institute and the Australian Property Institute. Despite the importance of property law as a cornerstone element of all property programs this aspect of the program is often approached from a more generic legal perspective with teaching resources used and pedagogical approach more aligned to the study of law that property. The specificity of this type of program is rarely adequately acknowledged. The question arises as to what the study of 'property law' entails and what the composition of a 'property law' subject should be. Replicating the methodology used by Placid and Weeks (2009) in their examination of the current composition of real estate law courses in the United States, this paper examines the current composition and pedagogical approach adopted by Australian universities based on the study of three Queensland property programs. In particular the curriculum, teaching resources used, assessment and engagement strategies are considered with a view to making improvements to the way these property law courses can be more effectively tailored to property students. It is anticipated that the outcomes of this paper will be of interest to all academics who are responsible for developing and delivering property law subjects and those who manage property programs in Australia and internationally.
Resumo:
Project selection is a complex decision making process that is not merely influenced by the technical aspects of the project. Selection of road infrastructure projects in the Indonesian public sector is generally conducted at an organisational level, which involves multiple objectives, constraints and stakeholders. Hence, a deeper understanding of the various organisational drivers that impact on such decisions, in particular organisational culture, is much needed for improving decision-making processes as it has been posited by some researchers that organisational culture can become either an enabler, or a barrier, to the process. One part of the cultural assessment undertaken as part of the research, identifies and analyses the cultural types of relevant and involved organisations in the decision making process. The organisational culture assessment instrument (OCAI) of Cameron and Quinn (2011) was utilized in this study and the data was taken from three selected provinces in Indonesia. The results can facilitate the surveyed (and similar) organisations to improve their performance by moving towards a more appropriate cultural typology that is arguably better suited to their operations and to improving their organisational processes to more closely align with their organisational vision, mission and objectives.
Resumo:
Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.
Resumo:
The global financial crisis that impacted on all world economies throughout 2008 and 2009. This impact has not been confined to the finance industries but has had a direct and indirect impact on the property industry worldwide from both an ownership and investment perspective. Property markets have experienced various levels of impact from this event, but universally the greatest impact has been on the traditional commercial and industrial property sectors from the investor perspective, with investment and superannuation funds reporting significant declines in the reported value of these investments. Despite the very direct impact of these declining property markets, the GFC has also had a very significant indirect impact on the various property professions and how these professions are now operating in this declining property market. Of particular interest is the comparison of the property market forecasts in late 2007 to the actual results in 2008/2009.
Resumo:
Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.
Resumo:
Purpose With an increasingly ageing population and widespread acceptance of the need for sustainable development in Australia, the demand for green retirement villages is increasing. This paper aims to identify the critical issues to be considered by developers and practitioners when embarking on their first green residential retirement project in Australia. Design/methodology/approach In view of the lack of adequate historical data for quantitative analysis, a case study approach is employed to examine the successful delivery of green retirement villages. Face-to-face interviews and document analysis were conducted for data collection. Findings The findings of the study indicate that one of the major obstacles to the provision of affordable green retirement villages is the higher initial costs involved. However, positive aspects were identified, the most significant of which relate to: the innovative design of site and floor plans; adoption of thermally efficient building materials; orientation of windows; installation of water harvesting and recycling systems, water conservation fittings and appliances; and waste management during the construction stage. With the adoption of these measures, it is believed that sustainable retirement development can be achieved without significant additional capital costs. Practical implications The research findings serve as a guide for developers in decision making throughout the project life-cycle when introducing green features into the provision of affordable retirement accommodation. Originality/value This paper provides insights into the means by which affordable green residential retirement projects for aged people can be successfully completed.
Resumo:
Design-build (DB) is a generic form of construction procurement, and, rather than simply representing a single system, it has evolved in practice into a variety of forms, each of which is similar to, and yet different from each other. Although the importance of selecting an appropriate DB variant has been widely accepted, difficulties occur in practice due to the multiplicity of terms and concepts used. What is needed is some kind of taxonomy or framework within which the individual variants can be placed and their relative attributes identified and understood. Through a comprehensive literature review and content analysis, this paper establishes a systematic classification framework for DB variants based on their operational attributes. In addition to providing much needed support for decision-making, this classification framework provides client/owners with perspectives to understand and examine different categories of DB variants from an operational perspective.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
This paper presents a behavioral car-following model based on empirical trajectory data that is able to reproduce the spontaneous formation and ensuing propagation of stop-and-go waves in congested traffic. By analyzing individual drivers’ car-following behavior throughout oscillation cycles it is found that this behavior is consistent across drivers and can be captured by a simple model. The statistical analysis of the model’s parameters reveals that there is a strong correlation between driver behavior before and during the oscillation, and that this correlation should not be ignored if one is interested in microscopic output. If macroscopic outputs are of interest, simulation results indicate that an existing model with fewer parameters can be used instead. This is shown for traffic oscillations caused by rubbernecking as observed in the US 101 NGSIM dataset. The same experiment is used to establish the relationship between rubbernecking behavior and the period of oscillations.
Resumo:
Serving as a powerful tool for extracting localized variations in non-stationary signals, applications of wavelet transforms (WTs) in traffic engineering have been introduced; however, lacking in some important theoretical fundamentals. In particular, there is little guidance provided on selecting an appropriate WT across potential transport applications. This research described in this paper contributes uniquely to the literature by first describing a numerical experiment to demonstrate the shortcomings of commonly-used data processing techniques in traffic engineering (i.e., averaging, moving averaging, second-order difference, oblique cumulative curve, and short-time Fourier transform). It then mathematically describes WT’s ability to detect singularities in traffic data. Next, selecting a suitable WT for a particular research topic in traffic engineering is discussed in detail by objectively and quantitatively comparing candidate wavelets’ performances using a numerical experiment. Finally, based on several case studies using both loop detector data and vehicle trajectories, it is shown that selecting a suitable wavelet largely depends on the specific research topic, and that the Mexican hat wavelet generally gives a satisfactory performance in detecting singularities in traffic and vehicular data.
Resumo:
Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.
Resumo:
The method on concurrent multi-scale model of structural behavior (CMSM-of-SB) for the purpose of structural health monitoring including model updating and validating has been studied. The detailed process of model updating and validating is discussed in terms of reduced scale specimen of the steel box girder in longitudinal stiffening truss of a long span bridge. Firstly, some influence factors affecting the accuracy of the CMSM-of-SB including the boundary restraint regidity, the geometry and material parameters on the toe of the weld and its neighbor are analyzed using sensitivity method. Then, sensitivity-based model updating technology is adopted to update the developed CMSM-of-SB and model verification is carried out through calculating and comparing stresses on different locations under various loading from dynamic characteristic and static response. It can be concluded that the CMSM-of-SB based on the substructure method is valid.
Resumo:
Initial crack widely exists in the welded members of steel bridge induced by the welding procedure or by the fatigue damage crack initiation. The behavior of crack growth with a view to fatigue damage accumulation on the tip of cracks is discussed. Fatigue life of welded components with initial crack in bridges under traffic loading is investigated. Based on existing fatigue experiment results of welded members with initial crack and the fatigue experiment results of welded bridge members under constant stress cycles, the crack would keep semi-elliptical shape with variable ratio of a/c during the crack propagation. Based on the concept of continuum damage accumulated on the tip of fatigue cracks,the fatigue damage law suitable for steel bridge members under traffic loading is modified to consider the crack growth.The virtual crack growth method and the semi-elliptical crack shape assumption are proposed in this paper to deduce a new model of fatigue crack growth rate for welded bridge members under traffic loading. And the calculated method of the stress intensity factor necessary for evaluation of the fatigue life of welded bridge members with cracks is discussed.The proposed fatigue crack growth model is then applied to calculate the crack growth and the fatigue life of existing welded members with fatigue experimental results. The fatigue crack propagation computation results show that the ratio of crack depth to the half crack surface length a/c is variable during crack propagation process and the stress cycle increases with the increase of a0/c0 with certain a0/t0 .The calculated and measured fatigue lives are generally in good agreement,at some initial conditions of cracking, for welded members widely used in steel bridges.
Resumo:
Acoustic emission (AE) analysis is one of the several diagnostic techniques available nowadays for structural health monitoring (SHM) of engineering structures. Some of its advantages over other techniques include high sensitivity to crack growth and capability of monitoring a structure in real time. The phenomenon of rapid release of energy within a material by crack initiation or growth in form of stress waves is known as acoustic emission (AE). In AE technique, these stress waves are recorded by means of suitable sensors placed on the surface of a structure. Recorded signals are subsequently analysed to gather information about the nature of the source. By enabling early detection of crack growth, AE technique helps in planning timely retrofitting or other maintenance jobs or even replacement of the structure if required. In spite of being a promising tool, some challenges do still exist behind the successful application of AE technique. Large amount of data is generated during AE testing, hence effective data analysis is necessary, especially for long term monitoring uses. Appropriate analysis of AE data for quantification of damage level is an area that has received considerable attention. Various approaches available for damage quantification for severity assessment are discussed in this paper, with special focus on civil infrastructure such as bridges. One method called improved b-value analysis is used to analyse data collected from laboratory testing.