994 resultados para Pick-Sloan Missouri Basin Program (U.S.). Glendo Unit.
Resumo:
"December 1990."
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
English or German.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Bibliography: p. 76.
Resumo:
Bibliography: p. 24.
Resumo:
Bibliography: p. 100.
Resumo:
Bibliography: p. 89.
Resumo:
"For submission to U.S. Army Construction Engineering Research Laboratory, Champaign, Illinois."
Resumo:
"April 1996"
Resumo:
"November 1995"
Resumo:
"For submission to U.S. Army Construction Engineering Research Laboratories, Champaign, Illinois"
Resumo:
"This report is a product of the Laboratory Simulation of Spectral and Directional Spectral Waves Work Unit, Coastal Flooding and Storm Protection Program, Civil Works Research and Development, at the US Army Engineer Waterways Experiment Station's Coastal Engineering Research Center."--Preface.