985 resultados para Jan, Sobieski, III, King of Poland, 1624-1696.
Resumo:
"First published London 1828."
Resumo:
Publisher's advertisement (12 p.) at beginning of v. 2.
Resumo:
Interleaved, with ms. notes.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Pt. I. King Saul.--Pt.II. King David.--Pt.III. King Solomon.
Resumo:
"Memorandum of abbreviations": p. [xv]-xix.
Resumo:
Pages also numbered 5-102.
Resumo:
Printed within double black lines.
Resumo:
Mode of access: Internet.
Resumo:
The second booke: the true and perfect description of the whole coast of Guinea, Manicongo, Angola, Manicongo, Angola, Monomotapa ... / and now translated out of dutch into english by W.P. (p. [3], 198-259) -- The thirde booke: The nauigation of the Portingales into the East Indies, containing their trauels by sea, into East India, and from the East Indies into Portingall ... / translated out of dutch by W.P. (p.[2], 307-447) -- The fourth booke: A most true and certaine extract and summarie of all the rents, demaines, tolles, taxes, impostes, tributes ... of the King of Spania ... / translated out of spanish into low-dutch by Iohn Hughen ... and out of dutch into english by W.P. (p. [3], 452-462)
Resumo:
"Two hundred copies ... printed for private distribution."
Resumo:
"Published under the direction of the Committee of General Literature and Education, appointed by the Society for Promoting Christian knowledge."
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.