833 resultados para Investment Delay
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
In dynamic models of energy allocation, assimilated energy is allocated to reproduction, somatic growth, maintenance or storage, and the allocation pattern can change with age. The expected evolutionary outcome is an optimal allocation pattern, but this depends on the environment experienced during the evolutionary process and on the fitness costs and benefits incurred by allocating resources in different ways. Here we review existing treatments which encompass some of the possibilities as regards constant or variable environments and their predictability or unpredictability, and the ways in which production rates and mortality rates depend on body size and composition and age and on the pattern of energy allocation. The optimal policy is to allocate resources where selection pressures are highest, and simultaneous allocation to several body subsystems and reproduction can be optimal if these pressures are equal. This may explain balanced growth commonly observed during ontogeny. Growth ceases at maturity in many models; factors favouring growth after maturity include non-linear trade-offs, variable season length, and production and mortality rates both increasing (or decreasing) functions of body size. We cannot yet say whether these are sufficient to account for the many known cases of growth after maturity and not all reasonable models have yet been explored. Factors favouring storage are also reviewed.
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Effect of Delay in Testing Asphalt Concrete Specimens for Marshall Stability, MLR-86-08, Draft, 1986
Resumo:
The Central Laboratory has been delaying the mix design testing of 2 1/2" X 4" Marshall specimens for stability, until the next day after molding. For example, if the mixes are made and samples molded on Friday a man would have to come in and work on Saturday to test these specimens. The reason for this is that the ASTM-01559 "Resistance to Plastic Flow of Bituminous Mixes Using Marshall Apparatus," states that "the specimens after being molded shall be carefully transferred to a smooth, flat surface and allowed to stand overnight at room temperature, before being weighed, measured and tested." The AASHTO procedure, AASHTO Designation T-245-82 "Resistance to Plastic Flow of Bituminous Mixtures using Marshall Apparatus," does not say when the specimens shall be tested for stability. The IDOT Lab. Specifications, Test Method No. Iowa 502-8 and test method No. Iowa 506-C "compacting asphaltic concrete by the Marshall Method" and "Resistance to Plastic Flow of Bituminous Mixtures Using the Marshall Apparatus," respectively, only state that the specimens shall be cooled before testing. Due to the above conflict in specifications, a number of mix samples were tested, in the Central Lab, for stability on different days. This should furnish enough information to allow us to change the procedure and to test for stability the same day molded, or be able to delay the testing for 3 days or more.
Resumo:
Congrès de la Société Française de Pédiatrie et de l'Association des Pédiatres de Langue Française (APLF)
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
Department of Management reporting on the status of the Iowa Infrastructure Investment Program, known as the I-JOBS Program, as of September 30, 2010 with additional survey information from departments on the number of positions supported through October 31, 2010.
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
A-1 - Monthly Public Assistance Statistical Report Family Investment Program