980 resultados para HR mirrors
Resumo:
Iowa's first field application of synthetic engineering fabrics was on research project HR-158, "Prevention of Reflective Cracking in Asphalt Overlays". This research placed in September 1971 used three different engineering fabrics. A final report concluding generally favorable performance was distributed in May 1977. There have been a number of Iowa engineering fabric installations since that initial project.
Resumo:
There is an urgent need to complete projects in high traffic urban areas in the shortest possible time. These road user benefits resulting from faster construction will minimize public inconvenience, safety hazards and a total cost to the public. The incentive - disincentive clause in the contract will encourage the contractor to expedite all phases in the contract. A copy of this special provision is part of this work plan and other details of construction are included in the plan and specification of Project F-65-4(34)--20-77.
Resumo:
Stopping and turning maneuvers on high traffic volume asphalt cement concrete surfaced roads and streets often cause distortion of the pavement. Distortion may show up as excessive rutting in the wheel path, shoving of the pavement and/or rippling of the surface. Often times repeated corrective work such as cold milling or heater planing is required in these areas to maintain the pavement surface in a reasonable condition. In recent years polymer additives have been developed for asphalt cement concrete paving mixes that show promise in improving the inplace stability of the pavements. AC-13 (Styrelf 13) available from Bitucote Products Company, St. Louis, Missouri is an asphalt cement that has been modified by an additive to exhibit characteristics of very high stability in asphalt mixes.
Resumo:
Remote sensing was utilized in the Phase II Cultural Resources Investigation for this project in lieu of extensive excavations. The purpose of the present report is to compare the costs and benefits of the use of remote sensing to the hypothetical use of traditional excavation methods for this project. Estimates for this hypothetical situation are based on the project archaeologist's considerable past experience in conducting similar investigations. Only that part of the Phase II investigation involving field investigations is addressed in this report. Costs for literature review, laboratory analysis, report preparation, etc., are not included. The project manager proposed the use of this technique for the fol lowing logistic, safety and budgetary reasons.
Resumo:
Foamed asphalt shoulders were placed on an Industrial Connector road at the south edge of Muscatine. The foamed asphalt was produced by injecting 1 to 2 percent water into hot asphalt cement in a patented foaming chamber. A foam develops which is 10 to 15 times the original volume. of the asphalt cement. A 3/8" limestone aggregate was used in the foamed asphalt mixture. This foamed asphalt was placed on the shoulders and in the radii on the Industrial Connector road in May 1987. The radii were later replaced due to reconstruction, but the shoulders remain and performed fairly well with some recent stripping and potholing. The performance appeared to be lower than expected from conventional hot mix on projects with similar traffic.
Resumo:
Innovative Rail Ltd. of Cedar Rapids, Iowa produced a new rail/highway crossing gate arm that shows promise in two areas: a. Minimizing arm breakage, and b. Added target value to motorists. The new gate was demonstrated to the Chicago and North Western Transportation Company, and that railroad has requested its use at two crossings on an "experimental basis" to determine if its installation provides relief in those areas. On April 18, 1986, the Department observed a test of the material under field conditions with the Transportation Company. The gate received four mid-center strikes at 5 MPH by a company truck while in the lowered position, and showed no damage. In a fifth mid-center strike at 15 MPH, the gate was visibly damaged at the connection to its raising mechanism, but continued to function though at a 5-10 degree drop. Several pictures of the gate and its saddle mechanism are shown in Appendix A of this report. Innovative Rail established distributorships in the United States and Canada, and has since gone out of business.
Resumo:
The report compares and contrasts the automated PASCO method of pavement evaluation to the manual procedures used by the Iowa Department of Transportation (DOT) to evaluate pavement condition. Iowa DOT's use of IJK and BPR roadmeters and manual crack and patch surveys are compared to PASCO's use of 35-mm photography, artificial lighting and hairline projection, tracking wheels and lasers to measure ride, cracking and patching, rut depths, and roughness. The Iowa DOT method provides a Present Serviceability Index (PSI) value and PASCO provides a Maintenance Control Index (MCI). Seven sections of Interstate Highway, county roads and city streets, and one shoulder section were tested with different speeds of data collection, surface types and textures, and stop and start conditions. High correlation of results between the two methods in the measurement of roughness (0.93 for the tracking wheel and 0.84 for the laser method) were recorded. Rut depth correlations of 0.61 and cracking of 0.32 are attributed to PASCO's more comprehensive measurement techniques. A cost analysis of the data provided by both systems indicates that PASCO is capable of providing a comparable result with improved accuracy at a cost of $125-$150 or less per two-lane mile depending on survey mileage. Improved data collection speed, accuracy, and reliability, and a visible record of pavement condition for comparable costs are available. The PASCO system's ability to provide the data required in the Highway Pavement Distress Identification Manual, the Pavement Condition Rating Guide, and the Strategic Highway Research Program Long Term Pavement Performance (LTPP) Studies, is also outlined in the report.
Resumo:
A one mile section each of thermoplastic and epoxy pavement marking materials were placed on new ACC pavement near Carroll, IA on Highway 30. The markings were evaluated for four years to see if they were suitable materials for durable pavement markings. The epoxy markings were inadvertently repainted after two years. They were performing well up to that time with little plow damage and good retroreflectivity. The thermoplastic dash lines suffered heavy snow plow damage after the first year and were repainted after the third winter. The thermoplastic edge lines performed fairly well for four years.
Resumo:
The Iowa Department of Transportation (DOT) evaluated the PAS I Road Survey System from PAVEDEX, Inc. of Spokane, Washington. This system uses video photograph to identify and quantify pavement cracking and patching distresses. Comparisons were made to procedures currently used in the State. Interstate highway, county roads and city streets, and two shoulder sections were evaluated. Variables included travel speeds, surface type and texture, and traffic control conditions. Repeatability and distress identification were excellent on rigid pavements. Differences in distress identification and the effect of surface textures in the flexible test sections limited the repeatability and correlation of data to that of the Iowa DOT method. Cost data indicates that PAVEDEX is capable of providing comparable results with improved accuracy at a reasonable cost, but in excess of that experienced currently by the Iowa DOT. PAVEDEX is capable of providing network level pavement condition data at highway speeds and analysis of the data to identify 1/8-inch cracks at approximately 2-3 lane miles per hour with manual evaluation. Photo-logging capability is also included in the unit.
Resumo:
Following is the Operations Manual for the Pennsylvania Ave Bridge over I-235 located in Des Moines, Iowa, which was installed from July 1992 to October 1992. The project uses ELGARD™ 210 Anode Mesh and is divided into 3 zones. Periodic data collection and/or inspection of the cathodic protection system is required to insure proper operation and a long life. This Operation Manual contains a schedule, operation procedures, operation log forms, a rectifier panel drawing, and pertinent reference matenal. Operation procedures and operating records are contained in the body of the manual, while blank operation forms, as built drawings, and pertinent reference material are contained in the appendices.
Resumo:
In recent years, the nighttime wet pavement retroreflectivity of pavement markings has become an important issue. In a effort to continue research in this area, the Iowa Department of Transportation evaluated the effectiveness of Visibeads in the Des Moines metropolitan area. Visibeads are three to four times larger in diameter then conventional glass beads. This larger size provides for better retroreflectivity under nighttime wet pavement conditions. The areas chosen for evaluation do not have roadway lighting, therefore, making them a good choice for Visibeads. Although the DOT has tested Visibeads in the past with moderate success, it is believed that using Visibeads with longer life markings such as epoxy will improve their performance.
Resumo:
Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa has evaluated the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC). This was the sixth project using this process. The project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed during this research with the surface course to be let at a later date. There were four test sections, two sections with conventional mixtures and two with ARC mixtures. There were no significant differences in placement or performance between the two mix types. The cost of the ARC mixture was significantly higher.
Resumo:
In 1992, the Iowa DOT installed 6200 snowplowable Raised Pavement Markers (RPM) in six areas around the state. They were evaluated at six-month intervals until the replacement of the reflective lenses in 1995. During this time, the RPM performed well. The Iowa Department of Transportation uses de-icers and sand during the winter to control snow and ice on the pavement. The sand and the chemicals reduced the reflectivity of the reflectors. With minimum or no maintenance the visibility of the RPM is low. Although the RPM appear to present a problem during snow plowing, they are an excellent device for lane delineation at night in adverse weather.
Resumo:
In 1994 the Iowa Department of Transportation constructed a 7.2-mile Portland Cement Concrete overlay project in Iowa County on Iowa Highway 21. The research work was conducted in cooperation with the Department of Civil Engineering and the Federal Highway Administration under the Iowa Highway Research Board project HR-559. The project was constructed to evaluate the performance of an ultrathin concrete overlay during a 5-year period. The experiment included variables of base surface preparation, overlay depth, joint spacing, fiber reinforcement, and the sealed or non-sealed joints. The project was instrumented to measure overlay/base interface temperatures and strains. Visual distress surveys and deflection testing were also used to monitor performance. Coring and direct shear testing was accomplished 3 times during the research period. Results of the testing and monitoring are identified in the report. The experiment was very successful and the results provide an insight into construction and design needs to be considered in tailoring a portland cement concrete overlay to a performance need. The results also indicate a method to monitor bond with nondestructive methods.
Resumo:
This final report contains two separate reports which describe the retroreflectivity levels of various traffic signs and pavement markings on the Iowa primary road system. The data was collected in the fall/winter of 1994 and given to the Federal Highway Administration in March of 1995. This information is currently being combined with similar information from other jurisdictions across the country for the purpose of determining the impact of mandated minimum retroreflectivity levels. The FHWA will be releasing their report sometime in 1996. In October 1992, Congress mandated (Public Law 102-388) the Secretary of Transportation to revise the Manual of Uniform Traffic Control Devices to include a minimum level of retroreflectivity for pavement markings and traffic signs which shall apply to all roads open to public travel. In 1994, the FHWA initiated research studies to determine the retroreflectivity levels which currently exist for signs and markings in an attempt to develop standards which are reasonable to implement. The Iowa Department of Transportation participated in both of the studies and the final reports are included. After compilation and analysis of the collected retroreflectivity data, the FHWA will propose the new MUTCD standards through the federal rule making process. It is estimated that the actual MUTCD change will occur sometime in late 1997 or early 1998.