986 resultados para Green Building


Relevância:

20.00% 20.00%

Publicador:

Resumo:

As the sustainability awareness rises globally, the construction industry is under increasing pressure to improve efficiency and project delivery. The implementation of Industrialised Building Systems (IBS), for which utility components are built offsite, has the potential of promoting sustainability deliverables. This can be achieved by better control of production environment, minimising construction waste, using efficient building material energy, and stabilising work conditions. As a unique building technology, IBS has not been effectively implemented in Malaysia. Possible reasons may include limited understanding among stakeholders on the IBS potential and its relevance to sustainability. This warrants studies on the sustainability issues of IBS design, construction, operation and maintenance, A framework is being developed through research to assess performance criteria related to sustainability, which should be considered during IBS design and application in the most consistent and systematic way. This paper discusses how these sustainability performance criteria are examined in a continuing research project and the processes conducive to implementing sustainable IBS in Malaysia. Existing tools, indicators and guidelines are reviewed, analysed and grouped according to characteristics and application. The research also hopes to produce guidelines for stakeholders to incorporate sustainability issues and concepts into IBS applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Malaysia, Industrialised Building Systems (IBS) are being promoted as a potential to enhance sustainability by the building industry and government. Known elsewhere as prefabricated construction, IBS employs a combination of ready-made components in the construction of buildings that promote quality of production, enhance simplification of construction processes and minimise on-site work. The components are manufactured in a factory either on or off site. They are then positioned and assembled into building structures. The unique characteristic of IBS has the potential to respond well to the sustainability challenge facing the construction industry. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications and some of the rating schemes fail to assess IBS towards sustainability deliverables. A holistic approach to improving IBS implementation is necessary to consider sustainability perceptions on IBS among key stakeholders. As IBS design is one of the most important development phases to incorporate sustainability requirements and expectations, a framework of embedding sustainability factors into IBS design is being developed through research. This paper presents an improved IBS design process focused on sustainability, showing where and how sustainability should be assessed to improve IBS construction. The framework being developed can provide guidance and decision making assistance to not only design consultants but all relevant stakeholders by integrating sustainability concepts into IBS applications. Outcome of the research will also provide a benchmark for developing countries in adopting prefabricated construction systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Standardised testing does not recognise the creativity and skills of marginalised youth. This paper presents the development of an innovative approach to assessment designed for the re-engagement of at risk youth who have left formal schooling and are now in an alternative education institution. An electronic portfolio system (EPS) has been developed to capture, record and build on the broad range of students’ cultural and social capital. The assessment as a field of exchange model draws on categories from sociological fields of capital and reconceptualises an eportfolio and social networking hybrid system as a sociocultural zone of learning and development. The EPS, and assessment for learning more generally, are conceptualised as social fields for the exchange of capital (Bourdieu 1977, 1990). The research is underpinned by a sociocultural theoretical perspective that focuses on how students and teachers at the Flexible Learning Centre (FLC) develop and learn, within the zone of proximal development (Vygotsky, 1978). The EPS is seen to be highly effective in the engagement and social interaction between students, teachers and institutions. It is argued throughout this paper that the EPS provides a structurally identifiable space, an arena of social activity, or a field of exchange. The students, teachers and the FLC within this field are producing cultural capital exchanges. The term efield (exchange field) has been coined to refer to this constructed abstract space. Initial results from the trial show a general tendency towards engagement with the EPS and potential for the attainment of socially valued cultural capital in the form of school credentials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Late last year teaching staff at Griffith University participated in a symposium entitled 'Spotlight on Generic Skills & Flexible Learning'. This event brought together academic staff as well as library staff, learning advisers and other support staff interested in teaching and learning issues. The discussion was based on the premise that the University has a responsibility to ensure that its courses emphasise broad educational values and 'produce highly sought after graduates with globally applicable skills for the international market'(1). It was acknowledged that the University consistently scores very highly with graduates for its development of generic skills. However at the same time staff expressed concern at the challenge of developing more flexible, student-centred learning environments that have generic skills embedded across all programs (2). As a result there has been much debate in the University about which skills are important, how they will be acquired and how they could effectively be built into the curriculum. One outcome of these discussions is the project described in this paper. What follows is an overview of the project and a discussion about the integration and development of information literacy as a generic attribute in the curriculum and some suggestions on ways forward.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As global warming entails new conditions for the built environment, the thermal and energy performance of existing buildings, which are designed based on current weather data, may become unclear and remain a great concern. Through building computer simulation and qualitative analysis of the weighted factor for the outdoor temperature impact on building energy and thermal performance, this paper investigates the sensitivity of different office building zoning to the potential global warming. A standard office building type is examined for all eight capital cities in Australia. Results show that comparing the middle and top floors, except for cool climate (i.e. Hobart), the ground floor appears to be the most sensitive to the effect of global warming and has the highest tendency for a overheating problem. From the analysis of the responses of different zone orientations to the outdoor air temperature increase, it is also found that there are widely varied responses between zone orientations, with South zone (in the southern hemisphere) being the most sensitive. With an increased external air temperature, the variation between different floors or zone orientations will become more significant, up to 53 percent increase of overheating hours in Darwin and 47 percent increase of cooling load in Hobart.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A contract to buy or sell a home is the most important contract most people will ever make. It is crucial that the purchase or sale is made carefully and correctly. Similarly, maintaining a home and undertaking repairs or renovations can be significant aspects of life. This Chapter will explore these issues under the broad headings: • buying a home; • selling a home; and • building or renovating a home.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper draws on a major study the authors conducted for the Australian Government in 2009. It focuses on the diffusion issues surrounding the uptake of sustainable building and construction products in Australia. Innovative sustainable products can minimise the environmental impact during construction, while maximising asset performance, durability and re-use. However, there are significant challenges faced by designers and clients in the selection of appropriate sustainable products in consideration of the integrated design solution, including overall energy efficiency, water conservation, maintenance and durability, low-impact use and consumption. The paper is a review of the current state of sustainable energy and material product innovations in Australia. It examines the system dynamics surrounding these innovations as well as the drivers and obstacles to their diffusion throughout the Australian construction industry. The case product types reviewed comprise: solar energy technology, small wind turbines, advanced concrete technology, and warm-mixed asphalt. The conclusions highlight the important role played by Australian governments in facilitating improved adoption rates. This applies to governments in their various roles, but particularly as clients/owners, regulators, and investors in education, training, research and development. In their role as clients/owners, the paper suggests that government can better facilitate innovation within the construction industry by adjusting specification policies to encourage the uptake of sustainable products. In the role as regulators, findings suggest governments should be encouraging the application of innovative finance options and positive end-user incentives to promote sustainable product uptake. Also, further education for project-based firms and the client/end users about the long-term financial and environmental benefits of innovative sustainable products is required. As more of the economy’s resources are diverted away from business-as-usual and into the use of sustainable products, some project-based firms may face short-term financial pain in re-shaping their businesses. Government policy initiatives can encourage firms make the necessary adjustments to improve innovative sustainable product diffusion throughout the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainability concerns every citizen. Housing affordability and sustainable solutions are being highlighted in research and practice in many parts of the world. This paper discusses the development of a Commuter Energy and Building Utilities System (CEBUS) in sustainable housing projects as a means of bridging the gap between current median house pricing and target affordable house pricing for low income earners. Similar scales of sustainable housing development cannot be achieved through independent application of current best practice methods in ecologically sustainable development strategies or transit oriented development master plans. This paper presents the initial stage of research on first capital and ongoing utilities and transport cost savings available from these sustainable design methods. It also outlines further research and development of a CEBUS Dynamic Simulation Model and Conceptual Framework for the Australian property development and construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

What is the secret mesmerism that death possesses and under the operation of which a modern architect – strident, confident, resolute – becomes rueful, pessimistic, or melancholic?1 Five years before Le Corbusier’s death at sea in 1965, the architect reluctantly agreed to adopt the project for L’Église Saint-Pierre de Firminy in Firminy-Vert (1960–2006), following the death of its original architect, André Sive, from leukemia in 1958.2 Le Corbusier had already developed, in 1956, the plan for an enclave in the new “green” Firminy town, which included his youth and culture center and a stadium and swimming pool; the church and a “boîte à miracles” near the youth center were inserted into the plan in the ’60s. (Le Corbusier was also invited, in 1962, to produce another plan for three Unités d’Habitation outside Firminy-Vert.) The Saint-Pierre church should have been the zenith of the quartet (the largest urban concentration of works by Le Corbusier in Europe, and what the architect Henri Ciriani termed Le Corbusier’s “acropolis”3) but in the early course of the project, Le Corbusier would suffer the diocese’s serial objections to his vision for the church – not unlike the difficulties he experienced with Notre Dame du Haut at Ronchamp (1950–1954) and the resistance to his proposed monastery of Sainte-Marie de la Tourette (1957–1960). In 1964, the bishop of Saint-Étienne requested that Le Corbusier relocate the church to a new site, but Le Corbusier refused and the diocese subsequently withdrew from the project. (With neither the approval, funds, nor the participation of the bishop, by then the cardinal archbishop of Lyon, the first stone of the church was finally laid on the site in 1970.) Le Corbusier’s ambivalence toward the project, even prior to his quarrels with the bishop, reveals...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study, numerical simulations of natural convection in an attic space subject to diurnal temperature condition on the sloping wall have been carried out. An explanation of choosing the period of periodic thermal effect has been given with help of the scaling analysis which is available in the literature. Moreover, the effects of the aspect ratio and Rayleigh number on the fluid flow and heat transfer have been discussed in details as well as the formation of a pitchfork bifurcation of the flow at the symmetric line of the enclosure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper explores student self-censorship within an online learning environment. Self-censorship in group activity can be seen as a two-edged sword. While it can be advantageous that a student censor personal frustration and angst when working with others, if the self-censorship impacts on the cognitive contribution a student makes then this may significantly impact upon the overall quality of the group’s collective knowledge artefact. This paper reports on a study where it was found that students had self censored both their feelings and ideas as they collaboratively worked together.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.