825 resultados para Aesthetic rehabilitation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The number of dams, which need rehabilitation, is growing, not only in countries that have a long tradition in dam building and operation but,also in those regions where the infrastructure is still in full development. Though rehabilitation projects generally deal with problems that are common in dam engineering practice there are some peculiarities which are a characteristic of such projects and which must be duly taken into account to avoid unsuccess and/or unnecessary costs. Regular safety inspection is essential to forestall the development of structural, hydrological and operational unsafety. if need of major repair or overall rehabilitation of a dam becomes apparent design oft he rehabilitation project must be preceded by a comprehensive checkup of the structure and appurtenant works, as well as by an evaluation of its hydrological safety inclusive of all relevant environmental aspects. The availability of complete records on the clam's structural behaviour and on meteorological and hydrological data, as well as the knowledge of the materials properties of the existing structure are important for the successful design of a rehabilitation project. To this end the installation of monitoring devices in the existing structure may be necessary to generate representative data. While the criteria to be used in structural design should correspond to current standards, the definition of hydrological design criteria depends on considerations that vary widely from region to region or even from one country to another. Some basic hydrological safety requirements, however, are recommended for general acceptance. Dam rehabilitation projects demand very careful and detailed construction planning because of their dependence on river flow conditions, operational restrictions and, often, on procedures or limitations imposed to avoid harm to the environment. of utmost importance is the timely availability of the financial funds required to complete the project, in order to avoid delays which could result in structural or operational unsafety. Since every dam sooner or later will have to undergo major repair or updating of safety, rehabilitation may evolve to a speciality of dam engineering.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two cases treated for hypertrophy of the frontal sinus are presented. In both patients, the excised frontal bone was inverted, and the resultant cavity was filled with either bone dust from the parietal region or Medpor. The first patient is shown with an excellent result after a follow-up period of 16 years. The second patient, who also achieved an excellent result, is presented after a follow-up period of 5 years. Using Medpor instead of bone dust resulted in the advantage that the operation could be performed with the patient under local anesthesia with sedation and prevention of an additional donor site. The use of Medpor has certain advantages over the use of hydroxyapatite, not least of which is its significant lower cost.