999 resultados para Abandoned Mined Lands Reclamation Council (Ill.)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Iowa Turkey Marketing Council for the years ended December 31, 2010 and 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Council Bluffs Airport Authority for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the City of Council Bluffs, Iowa for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Congress established the State Children's Health Insurance Program (SCHIP) with passage of the Balanced Budget Act of 1997, which authorized $40 billion for the SCHIP program through Federal Fiscal Year (FFY) 2007. Under the program, a federal block grant was awarded to states to provide health insurance to children from families with income about Medicaid eligibility levels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Iowa Egg Council for the years ended June 30, 2011 and 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objective: There is little evidence regarding the benefit of stress ulcer prophylaxis (SUP) outside critical care setting. Over-prescription of SUP is not devoid of risks. This prospective study aimed to evaluate the use of proton pump inhibitors (PPIs) for SUP in a general surgery department.Methods: Data collection was performed prospectively during an 8-week period on patients hospitalized in a general surgery department (58 beds) by pharmacists. Patients with a PPI prescription for the treatment of ulcers, gastro-oesophageal reflux disease, oesophagitis or epigastric pain were excluded. Patients admitted twice during the study period were not re-included. The American Society of Health-System Pharmacists guidelines on SUP were used to assess the appropriateness of de novo PPI prescriptions.Results: Among 255 consecutive patients in the study, 138 (54%) received a prophylaxis with PPI, of which 86 (62%) were de novo PPI prescriptions. One-hundred twenty-nine patients (94%) received esomeprazole (according to the hospital drug policy). The most frequent dosage was 40 mg/day. Use of PPI for SUP was evaluated in 67 patients. Fifty-three patients (79%) had no risk factors for SUP. Twelve and 2 patients had one or two risk factors, respectively. At discharge, PPI prophylaxis was continued in 34% of patients with a de novo PPI prescription.Conclusion: This study highlights the overuse of PPIs in non-ICU patients and the inappropriate continuation of PPI prescriptions at discharge.Treatment

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As of yearend 2008, about 41.2% of inmates had at least one diagnosis of a mental illness. The prevalence of mental illness among female offenders is higher than for men. However, it is important to look beyond these numbers to obtain a more accurate picture of the mentally ill inmate population and the challenges they pose for the Department of Corrections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a previous Data Download, we reported that about 27% of offenders under CBC field supervision and 42.6% of offenders in residential facilities are in need of mental health treatment services. In addition,more than 35% of offenders needing mental health treatment are not receiving services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

FHWA and the Iowa Department of Transportation are proposing geometric and capacity improvements to the Interstate 29 and Interstate 80 mainline in Segment 3 and the I-80/I-29 East System interchange, the South Expressway interchange, the U.S. Highway 275 interchange, and the Madison Avenue interchange to to safely and efficiently of transportation in the City of Council Bluffs, the Iowa DOT is also proposing to eliminate several railroad alignments and to develop new, consolidated tracks in Segment 3.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.