928 resultados para planning model
Resumo:
The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.
Resumo:
Shropshire Energy Team initiated this study to examine consumption and associated emissions in the predominantly rural county of Shropshire. Current use of energy is not sustainable in the long term and there are various approaches to dealing with the environmental problems it creates. Energy planning by a local authority for a sustainable future requires detailed energy consumption and environmental information. This information would enable target setting and the implementation of policies designed to encourage energy efficiency improvements and exploitation of renewable energy resources. This could aid regeneration strategies by providing new employment opportunities. Associated reductions in carbon dioxide and other emissions would help to meet national and international environmental targets. In the absence of this detailed information, the objective was to develop a methodology to assess energy consumption and emissions on a regional basis from 1990 onwards for all local planning authorities. This would enable a more accurate assessment of the relevant issues, such that plans are more appropriate and longer lasting. A first comprehensive set of data has been gathered from a wide range of sources and a strong correlation was found between population and energy consumption for a variety of regions across the UK. In this case the methodology was applied to the county of Shropshire to give, for the first time, estimates of primary fuel consumption, electricity consumption and associated emissions in Shropshire for 1990 to 2025. The estimates provide a suitable baseline for assessing the potential contribution renewable energy could play in meeting electricity demand in the country and in reducing emissions. The assessment indicated that in 1990 total primary fuel consumption was 63,518,018 GJ/y increasing to 119,956,465 GJ/y by 2025. This is associated with emissions of 1,129,626 t/y of carbon in 1990 rising to 1,303,282 t/y by 2025. In 1990, 22,565,713 GJ/y of the primary fuel consumption was used for generating electricity rising to 23,478,050 GJ/y in 2025. If targets to reduce primary fuel consumption are reached, then emissions of carbon would fall to 1,042,626 by 2025, if renewable energy targets were also reached then emissions of carbon would fall to 988,638 t/y by 2025.
Resumo:
The thesis describes the work carried out to develop a prototype knowledge-based system 'KBS-SETUPP' to generate process plans for the manufacture of seamless tubes. The work is specifically related to a plant in which hollows are made from solid billets using a rotary piercing process and then reduced to required size and finished properties using the fixed plug cold drawing process. The thesis first discusses various methods of tube production in order to give a general background of tube manufacture. Then a review of the automation of the process planning function is presented in terms of its basic sub-tasks and the techniques and suitability of a knowledge-based system is established. In the light of such a review and a case study, the process planning problem is formulated in the domain of seamless tube manufacture, its basic sub-tasks are identified and capabilities and constraints of the available equipment in the specific plant are established. The task of collecting and collating the process planning knowledge in seamless tube manufacture is discussed and is mostly fulfilled from domain experts, analysing of existing manufacturing records specific to plant, textbooks and applicable Standards. For the cold drawing mill, tube-drawing schedules have been rationalised to correspond with practice. The validation of such schedules has been achieved by computing the process parameters and then comparing these with the drawbench capacity to avoid over-loading. The existing models cannot be simulated in the computer program as such, therefore a mathematical model has been proposed which estimates the process parameters which are in close agreement with experimental values established by other researchers. To implement the concepts, a Knowledge-Based System 'KBS- SETUPP' has been developed on Personal Computer using Turbo- Prolog. The system is capable of generating process plans, production schedules and some additional capabilities to supplement process planning. The system generated process plans have been compared with the actual plans of the company and it has been shown that the results are satisfactory and encouraging and that the system has the capabilities which are useful.
Resumo:
The manufacture of copper alloy flat rolled metals involves hot and cold rolling operations, together with annealing and other secondary processes, to transform castings (mainly slabs and cakes) into such shapes as strip, plate, sheet, etc. Production is mainly to customer orders in a wide range of specifications for dimensions and properties. However, order quantities are often small and so process planning plays an important role in this industry. Much research work has been done in the past in relation to the technology of flat rolling and the details of the operations, however, there is little or no evidence of any research in the planning of processes for this type of manufacture. Practical observation in a number of rolling mills has established the type of manual process planning traditionally used in this industry. This manual approach, however, has inherent drawbacks, being particularly dependent on the individual planners who gain their knowledge over a long span of practical experience. The introduction of the retrieval CAPP approach to this industry was a first step to reduce these problems. But this could not provide a long-term answer because of the need for an experienced planner to supervise generation of any plan. It also fails to take account of the dynamic nature of the parameters involved in the planning, such as the availability of resources, operation conditions and variations in the costs. The other alternative is the use of a generative approach to planning in the rolling mill context. In this thesis, generative methods are developed for the selection of optimal routes for single orders and then for batches of orders, bearing in mind equipment restrictions, production costs and material yield. The batch order process planning involves the use of a special cluster analysis algorithm for optimal grouping of the orders. This research concentrates on cold-rolling operations. A prototype model of the proposed CAPP system, including both single order and batch order planning options, has been developed and tested on real order data in the industry. The results were satisfactory and compared very favourably with the existing manual and retrieval methods.
Resumo:
The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.
Resumo:
The research was carried out within a major public company. It sought to implement an approach to strategic planning which accounted for organisational values as well as employing a holistic value-free analysis of the firm and its environment. To this end, an 'ecological' model of the firm was formulated. A series of value-free strategic policies for its development were generated. These policies were validated by the company's top-management.They compared favourably with their own planning outcomes. The approach appeared to be diagnostically strong but lacked sufficient depth in the context of finding realistic corrective measures. However, feedback from the company showed it to be a useful complementary process to conventional procedures, in providing an explicitly different perspective. The research empirically evaluated the company's value-systems and their influence on strategy. It introduced the idea of an organisational 'self-concept' pre-determining the acceptability of various strategies.The values and the "self-concept' of the company were identified and validated, They appeared to have considerable influence on strategy. In addition, tho company's planning process within the decentralised structure was shown to be sub-optimal. This resulted from the variety of value systems maintained by different parts of the organisation. Proposals attempting to redress this situation were ofJered and several accepted. The study was postured as process-action research and the chosen perspective could be succinctly described as a 'worm's-eye view', akin to that of many real planners operating at some distance from the decision-making body. In this way, the normal strategic functionings of the firm and any changes resulting from the researcher's intervention were observed and recorded. Recurrent difficulties of the planning process resulting from the decentralised structure were identified. The overall procedure suggested as a result of the research aimed to increase the viabiIity of planning and the efficiency of the process. It is considered to be flexible enough to be applicable in a broader context.
Resumo:
Investment in transport infrastructure can be highly sensitive to uncertainty. The scale and lead time of strategic transport programmes are such that they require continuing policy support and accurate forecasting. Delay, cost escalation and abandonment of projects often result if these conditions are not present. In Part One the physical characteristics of infrastructure are identified as a major constraint on planning processes. The extent to which strategies and techniques acknowledge these constraints is examined. A simple simulation model is developed to evaluate the effects on system development of variations in the scale and lead time of investments. In Part Two, two case studies of strategic infrastructure investment are analysed. The absence of a policy consensus for airport location was an important factor in the delayed resolution of the Third London Airport issue. In London itself, the traffic and environmental effects of major highway investment ultimately resulted in the abandonment of plans to construct urban motorways. In both cases, the infrastructure implications of alternative strategies are reviewed with reference to the problems of uncertainty. In conclusion, the scale of infrastructure investment is considered the most important of the constraints on the processes of transport planning. Adequate appraisal of such constraints may best be achieved by evaluation more closely aligned to policy objectives.
Resumo:
Manufacturing planning and control systems are fundamental to the successful operations of a manufacturing organisation. 10 order to improve their business performance, significant investment is made by companies into planning and control systems; however, not all companies realise the benefits sought Many companies continue to suffer from high levels of inventory, shortages, obsolete parts, poor resource utilisation and poor delivery performance. This thesis argues that the fit between the planning and control system and the manufacturing organisation is a crucial element of success. The design of appropriate control systems is, therefore, important. The different approaches to the design of manufacturing planning and control systems are investigated. It is concluded that there is no provision within these design methodologies to properly assess the impact of a proposed design on the manufacturing facility. Consequently, an understanding of how a new (or modified) planning and control system will perform in the context of the complete manufacturing system is unlikely to be gained until after the system has been implemented and is running. There are many modelling techniques available, however discrete-event simulation is unique in its ability to model the complex dynamics inherent in manufacturing systems, of which the planning and control system is an integral component. The existing application of simulation to manufacturing control system issues is limited: although operational issues are addressed, application to the more fundamental design of control systems is rarely, if at all, considered. The lack of a suitable simulation-based modelling tool does not help matters. The requirements of a simulation tool capable of modelling a host of different planning and control systems is presented. It is argued that only through the application of object-oriented principles can these extensive requirements be achieved. This thesis reports on the development of an extensible class library called WBS/Control, which is based on object-oriented principles and discrete-event simulation. The functionality, both current and future, offered by WBS/Control means that different planning and control systems can be modelled: not only the more standard implementations but also hybrid systems and new designs. The flexibility implicit in the development of WBS/Control supports its application to design and operational issues. WBS/Control wholly integrates with an existing manufacturing simulator to provide a more complete modelling environment.
Resumo:
The loss of habitat and biodiversity worldwide has led to considerable resources being spent for conservation purposes on actions such as the acquisition and management of land, the rehabilitation of degraded habitats, and the purchase of easements from private landowners. Prioritising these actions is challenging due to the complexity of the problem and because there can be multiple actors undertaking conservation actions, often with divergent or partially overlapping objectives. We use a modelling framework to explore this issue with a study involving two agents sequentially purchasing land for conservation. We apply our model to simulated data using distributions taken from real data to simulate the cost of patches and the rarity and co-occurence of species. In our model each agent attempted to implement a conservation network that met its target for the minimum cost using the conservation planning software Marxan. We examine three scenarios where the conservation targets of the agents differ. The first scenario (called NGO-NGO) models the situation where two NGOs are both are targeting different sets of threatened species. The second and third scenarios (called NGO-Gov and Gov-NGO, respectively) represent a case where a government agency attempts to implement a complementary conservation network representing all species, while an NGO is focused on achieving additional protection for the most endangered species. For each of these scenarios we examined three types of interactions between agents: i) acting in isolation where the agents are attempting to achieve their targets solely though their own actions ii) sharing information where each agent is aware of the species representation achieved within the other agent’s conservation network and, iii) pooling resources where agents combine their resources and undertake conservation actions as a single entity. The latter two interactions represent different types of collaborations and in each scenario we determine the cost savings from sharing information or pooling resources. In each case we examined the utility of these interactions from the viewpoint of the combined conservation network resulting from both agents' actions, as well as from each agent’s individual perspective. The costs for each agent to achieve their objectives varied depending on the order in which the agents acted, the type of interaction between agents, and the specific goals of each agent. There were significant cost savings from increased collaboration via sharing information in the NGO-NGO scenario were the agent’s representation goals were mutually exclusive (in terms of specie targeted). In the NGO-Gov and Gov-NGO scenarios, collaboration generated much smaller savings. If the two agents collaborate by pooling resources there are multiple ways the total cost could be shared between both agents. For each scenario we investigate the costs and benefits for all possible cost sharing proportions. We find that there are a range of cost sharing proportions where both agents can benefit in the NGO-NGO scenarios while the NGO-Gov and Gov-NGO scenarios again showed little benefit. Although the model presented here has a range of simplifying assumptions, it demonstrates that the value of collaboration can vary significantly in different situations. In most cases, collaborating would have associated costs and these costs need to be weighed against the potential benefits from collaboration. The model demonstrates a method for determining the range of collaboration costs that would result in collaboration providing an efficient use of scarce conservation resources.
Resumo:
The loss of habitat and biodiversity worldwide has led to considerable resources being spent on conservation interventions. Prioritising these actions is challenging due to the complexity of the problem and because there can be multiple actors undertaking conservation actions, often with divergent or partially overlapping objectives. We explore this issue with a simulation study involving two agents sequentially purchasing land for the conservation of multiple species using three scenarios comprising either divergent or partially overlapping objectives between the agents. The first scenario investigates the situation where both agents are targeting different sets of threatened species. The second and third scenarios represent a case where a government agency attempts to implement a complementary conservation network representing 200 species, while a non-government organisation is focused on achieving additional protection for the ten rarest species. Simulated input data was generated using distributions taken from real data to model the cost of parcels, and the rarity and co-occurrence of species. We investigated three types of collaborative interactions between agents: acting in isolation, sharing information and pooling resources with the third option resulting in the agents combining their resources and effectively acting as a single entity. In each scenario we determine the cost savings when an agent moves from acting in isolation to either sharing information or pooling resources with the other agent. The model demonstrates how the value of collaboration can vary significantly in different situations. In most cases, collaborating would have associated costs and these costs need to be weighed against the potential benefits from collaboration. Our model demonstrates a method for determining the range of costs that would result in collaboration providing an efficient use of scarce conservation resources.
Resumo:
This paper examines the construction of a strategic plan as a communicative process. Drawing on Ricoeur’s concepts of decontextualization and recontextualization, we conceptualize strategic planning activities as being constituted through the iterative and recursive relationship of talk and text. Based on an in-depth case study, our findings show how multiple actors engage in a formal strategic planning process which is manifested in a written strategy document. This document is thus central in the iterative talk to text cycles. As individuals express their interpretations of the current strategic plan in talk, they are able to make amendments to the text, which then shape future textual versions of the plan. This cycle is repeated in a recursive process, in which the meanings attributed to talk and text increasingly converge within a final agreed plan. We develop our findings into a process model of the communication process that explains how texts become more authoritative over time and, in doing so, how they inscribe power relationships and social order within organizations. These findings contribute to the literature on strategic planning and on organization as a communication process.
Resumo:
The Implementation of Enterprise Resource Planning (ERP) systems require huge investments while ineffective implementations of such projects are commonly observed. A considerable number of these projects have been reported to fail or take longer than it was initially planned, while previous studies show that the aim of rapid implementation of such projects has not been successful and the failure of the fundamental goals in these projects have imposed huge amounts of costs on investors. Some of the major consequences are the reduction in demand for such products and the introduction of further skepticism to the managers and investors of ERP systems. In this regard, it is important to understand the factors determining success or failure of ERP implementation. The aim of this paper is to study the critical success factors (CSFs) in implementing ERP systems and to develop a conceptual model which can serve as a basis for ERP project managers. These critical success factors that are called “core critical success factors” are extracted from 62 published papers using the content analysis and the entropy method. The proposed conceptual model has been verified in the context of five multinational companies.
Resumo:
Large-scale disasters are constantly occurring around the world, and in many cases evacuation of regions of city is needed. ‘Operational Research/Management Science’ (OR/MS) has been widely used in emergency planning for over five decades. Warning dissemination, evacuee transportation and shelter management are three ‘Evacuation Support Functions’ (ESF) generic to many hazards. This thesis has adopted a case study approach to illustrate the importance of integrated approach of evacuation planning and particularly the role of OR/MS models. In the warning dissemination phase, uncertainty in the household’s behaviour as ‘warning informants’ has been investigated along with uncertainties in the warning system. An agentbased model (ABM) was developed for ESF-1 with households as agents and ‘warning informants’ behaviour as the agent behaviour. The model was used to study warning dissemination effectiveness under various conditions of the official channel. In the transportation phase, uncertainties in the household’s behaviour such as departure time (a function of ESF-1), means of transport and destination have been. Households could evacuate as pedestrians, using car or evacuation buses. An ABM was developed to study the evacuation performance (measured in evacuation travel time). In this thesis, a holistic approach for planning the public evacuation shelters called ‘Shelter Information Management System’ (SIMS) has been developed. A generic allocation framework of was developed to available shelter capacity to the shelter demand by considering the evacuation travel time. This was formulated using integer programming. In the sheltering phase, the uncertainty in household shelter choices (either nearest/allocated/convenient) has been studied for its impact on allocation policies using sensitivity analyses. Using analyses from the models and detailed examination of household states from ‘warning to safety’, it was found that the three ESFs though sequential in time, however have lot of interdependencies from the perspective of evacuation planning. This thesis has illustrated an OR/MS based integrated approach including and beyond single ESF preparedness. The developed approach will help in understanding the inter-linkages of the three evacuation phases and preparing a multi-agency-based evacuation planning evacuation
Resumo:
Purpose: The purpose of this paper is to investigate enterprise resource planning (ERP) systems development and emerging practices in the management of enterprises (i.e. parts of companies working with parts of other companies to deliver a complex product and/or service) and identify any apparent correlations. Suitable a priori contingency frameworks are then used and extended to explain apparent correlations. Discussion is given to provide guidance for researchers and practitioners to deliver better strategic, structural and operational competitive advantage through this approach; coined here as the "enterprization of operations". Design/methodology/approach: Theoretical induction uses a new empirical longitudinal case study from Zoomlion (a Chinese manufacturing company) built using an adapted form of template analysis to produce a new contingency framework. Findings: Three main types of enterprises and the three main types of ERP systems are defined and correlations between them are explained. Two relevant a priori frameworks are used to induct a new contingency model to support the enterprization of operations; known as the dynamic enterprise reference grid for ERP (DERG-ERP). Research limitations/implications: The findings are based on one longitudinal case study. Further case studies are currently being conducted in the UK and China. Practical implications: The new contingency model, the DERG-ERP, serves as a guide for ERP vendors, information systems management and operations managers hoping to grow and sustain their competitive advantage with respect to effective enterprise strategy, enterprise structure and ERP systems. Originality/value: This research explains how ERP systems and the effective management of enterprises should develop in order to sustain competitive advantage with respect to enterprise strategy, enterprise structure and ERP systems use. © Emerald Group Publishing Limited.