1000 resultados para denture construction
Resumo:
Capacity is affected by construction type and its intensity on adjacent open traffic lanes. The effect on capacity is a function of vehicles moving in and out of the closed lanes of the work zone, and the presence of heavy construction vehicles. Construction activity and its intensity, however, are not commonly considered in estimating capacity of a highway lane. The main purpose of this project was to attempt to quantify the effects of construction type and intensity (e.g. maintenance, rehabilitation, reconstruction, and milling) on work zone capacity. The objective of this project is to quantify the effects of construction type and its intensity on work zone capacity and to develop guidelines for MoDOT to estimate the specific operation type and intensity that will improve the traffic flow by reducing the traffic flow and queue length commonly associated with work zones. Despite the effort put into field data collection, the data collected did not show a full speed-flow chart therefore extracting a reliable capacity value was difficult. A statistical comparison between the capacity values found in this study using either methodologies indicates that there is an effect of construction activity on the values work zone capacity. It was found that the heavy construction activity reduces the capacity. It is very beneficial to conduct similar studies on the capacity of work zone with different lane closure barriers, which is also directly related to the type of work zone being short-term or long-term work zones. Also, the effect of different geometric and environmental characteristics of the roadway should be considered in future studies.
Resumo:
This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.
Resumo:
During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom developed WPMS solutions on Iowa DOT bridge projects. At the end of the first year of research, a Request for Proposals (RFP) was developed and issued by the Iowa DOT for the selection of a commercial WPMS to pilot test on multiple bridge projects. During the second year of research, the responses to the RFP issued during the first year of research were evaluated and a solution was selected. The selected solution, Attolist, was customized, tested, and implemented during the fall of 2009. Beginning in the winter of 2010, the solution was implemented on Iowa DOT projects. Researchers worked to assist in the training, implementation, and performance evaluation of the solution. Work will continue beyond the second year of research to implement Attolist on an additional pilot project. During this time, work will be completed to evaluate the impact of WPMS on Iowa DOT bridge projects.
Resumo:
Granular shoulders need to be maintained on a regular basis because edge ruts and potholes develop, posing a safety hazard to motorists. The successful mitigation of edge-rut issues for granular shoulders would increase safety and reduce the number of procedures currently required to maintain granular shoulders in Iowa. In addition, better performance of granular shoulders reduces the urgency to pave granular shoulders. Delaying or permanently avoiding paving shoulders where possible allows more flexibility in making investments in the road network. To stabilize shoulders and reduce the number of maintenance cycles necessary per season, one possible stabilizing agent—acidulated soybean oil soapstock—was investigated in this research. A pilot testing project was conducted for selected problematic shoulders in northern and northeastern Iowa. Soapstock was applied on granular shoulders and monitored during application and pre- and post-application. Application techniques were documented and the percentage of application success was calculated for each treated shoulder section. As a result of this research, it was concluded that soybean oil soapstock can be an effective stabilizer for granular shoulders under certain conditions. The researchers also developed draft specifications that could possibly be used to engage a contractor to perform the work using a maintenance-type construction contract. The documented application techniques from this project could be used as guidance for those who want to apply soapstock for stabilizing granular shoulders but might not be familiar with this technique.
Resumo:
This issue review provides information on the Department of Corrections current and projected offender population, facility capacity, construction update and impact on the general fund.
Resumo:
This pamphlet will help you decide which trees to save during construction. It shows simple, reliable methods that will keep trees safe during construction work.
Resumo:
This document includes the general provisions and regulations of the Iowa Sate Traveling Library under the Library Services and Construction Act. It also includes information of appropriations of funds available for expenditure, authority of local agencies to administer and state agency to supervise local administration and certification.
Resumo:
This issue review provides information on the Department of Corrections construction and of proposed staffing for additional beds in the prison system and community-based corrections.
Resumo:
OBJECTIVE: (1) To quantify wear of two different denture tooth materials in vivo with two study designs, (2) to relate tooth variables to vertical loss. METHODS: Two different denture tooth materials had been used (experimental material=test; DCL=control). In study 1 (split-mouth, 6 test centers) 60 subjects received complete dentures, in study 2 (two-arm, 1 test center) 29 subjects. In study 1 the mandibular dentures were supported by implants in 33% of the subjects, in study 2 only in 3% of the subjects. Impressions of the dentures were taken and poured with improved stone at baseline and after 6, 12, 18 and 24 months. Each operator evaluated the wear subjectively. Wear analysis was carried out with a laser scanning device. Maximal vertical loss of the attrition zones was calculated for each tooth cusp and tooth. A mixed linear model was used to statistically analyse the logarithmically transformed wear data. RESULTS: Due to drop-outs and unmatchable casts, only 47 subjects of study 1 and 14 of study 2 completed the 2-year recall. Overall, 75% of all teeth present could be analysed. There was no statistically difference in the overall wear between the test and control material for either study 1 or study 2. The relative increase in wear over time was similar in both study designs. However, a strong subject effect and center effect were observed. The fixed factors included in the model (time, tooth, center, etc.) accounted for 43% of the variability, whereas the random subject effect accounted for another 30% of the variability, leaving about 28% of unexplained variability. More wear was consistently recorded in the maxillary teeth compared to the mandibular teeth and in the first molar teeth compared to the premolar teeth and the second molars. Likewise, the supporting cusps showed more wear than the non-supporting cusps. The amount of wear did not depend on whether or not the lower dentures were supported by implants. The subjective wear was correct in about 67% of the cases if it is postulated that a wear difference of 100μm should be subjectively detectable. SIGNIFICANCE: The clinical wear of denture teeth is highly variable with a strong patient effect. More wear can be expected in maxillary denture teeth compared to mandibular teeth, first molars compared to premolars and supported cusps compared to non-supported cusps. Laboratory data on the wear of denture tooth materials may not be confirmed in well-structured clinical trials probably due to the large inter-individual variability.
Resumo:
This report covers the construction in 1961 of the soil-cement base and related pavement structure on Iowa 37 from Soldier to Dunlap, (F-861(6), Crawford, Harrison, Monona). The report also contains an account of the experimental work performed on the same road under research project HR-75.
Resumo:
Objectives: This qualitative study aims at understanding the consequences of body deconstruction through mastectomy on corporality and identity in women with breast cancer. Design: Nineteen women were contacted through the hospital. All had to undergo mastectomy. Some were offered immediate breast reconstruction, others, because of cancer treatments, had no planned reconstruction. A qualitative reflexive methodological background was chosen. Method: Women were invited to participate in three semi-structured interviews, one shortly before or after mastectomy, and the other interviews later in their illness courses, after surgery. All interviews were transcribed verbatim. Thematic analysis was performed. The analysis of the first interview of each woman is presented in this article. Results: Mastectomy provokes a painful experience of body deconstruction. Even when immediate reconstruction is proposed, contrasted feelings and dissonance are expressed when comparing the former healthy body to the present challenged body entity. Body transformations are accompanied with experiences of mutilation, strangeness, and modify the physical, emotional social, symbolic and relational dimensions of the woman's gendered identity. Although the opportunity of breast reconstruction is seen as a possible recovery of a lost physical symmetry and body integrity, grieving the past body and integrating a new corporality leads to a painful identity crisis. Conclusion: With mastectomy, the roots of the woman's identity are challenged, leading to a re-evaluation of her existential values. The consequences of mastectomy transform the woman's corporality and embodiment, and question her identity. Psychological support is discussed in the perspective of our results.
Resumo:
Pseudomonas fluorescens CHA0, an effective biological control agent of soilborne plant diseases, is naturally non-mucoid. We have isolated a highly mucoid Tn5 insertion mutant of strain CHA0. The mucoid phenotype was found to be due to the overproduction of exopolysaccharide (EPS), as a result of a mutation in the mucA gene. The wild-type mucA gene was cloned by a two-step, Tn5-dependent cloning procedure previously described and the deduced amino acid sequence showed 71% identity with MucA of P. aeruginosa, a negative regulator of the alternative sigma factor AlgU (=s22, sE). As in P. aeruginosa, mucA is preceded by the algU gene encoding s22 (91% identity at the amino acid sequence level). A mucA in-frame deletion mutant of CHA0 overproduced EPS and formed mucoid colonies, whereas an algU in-frame deletion mutant showed a non-mucoid phenotype. Pyoluteorin, an antibiotic produced by P. fluorescens, was found to be entrapped in EPS of a mucoid mutant. In natural soil, mucoidy negatively affected survival of the bacteria, suggesting that under these conditions the potential to produce abundant EPS does not confer a selective advantage on the bacteria.
Resumo:
Les textes inédits traduits et présentés dans ce volume constituent un témoignage exceptionnel quant à l'évolution de la pensée de Carnap, l'un des fondateurs de la philosophie analytique. Des premières ébauches d'une construction logique du monde à l'analyse logique des propositions du langage, ils nous font en effet assister aux différents moments d'un programme philosophique inscrit dans le débat du physicalisme et de l'unité de la science. La réductibilité des termes de la psychologie puis de la biologie aux termes de la physique implique-t-elle la dérivabilité de leurs lois aux siennes ? Y a-t-il bonne conséquence d'une épistémologie de la réduction à une réduction ontologique ? Le monde, en somme, est-il entièrement explicable par le langage, et si oui, lequel ?
Resumo:
For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.
Resumo:
In 1982 the Iowa DOT allowed a successful bidder the option of submitting materials and proportions using fly ash to produce a portland cement concrete (PCC) paving mixture to meet a specified compressive strength. The contractor, Irving F. Jensen, received approval for the use of a concrete mixture utilizing 500 lbs. of portland cement and 88 lbs. of fly ash as a replacement of 88 lbs. of portland cement. The PCC mixture was utilized on the Muscatine County US 61 relocation bypass paved as project F-61-4(32)--20-70. A Class "C" fly ash obtained from the Chillicothe electric generating plant approximately 100 miles away was used in the project. This use of fly ash in lieu of portland cement resulted in a cost savings of $64,500 and an energy savings of approximately 16 billion BTU. The compressive strength of this PCC mixture option was very comparable to concrete mixtures produced without the use of fly ash. The pavement has been performing very well. The substitution of fly ash for 15% of the cement has been allowed as a contractor's option since 1984. Due to the cost savings, it has been used in almost all Iowa PCC paving since that time.