Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
ABSTRACT : A firm's competitive advantage can arise from internal resources as well as from an interfirm network. -This dissertation investigates the competitive advantage of a firm involved in an innovation network by integrating strategic management theory and social network theory. It develops theory and provides empirical evidence that illustrates how a networked firm enables the network value and appropriates this value in an optimal way according to its strategic purpose. The four inter-related essays in this dissertation provide a framework that sheds light on the extraction of value from an innovation network by managing and designing the network in a proactive manner. The first essay reviews research in social network theory and knowledge transfer management, and identifies the crucial factors of innovation network configuration for a firm's learning performance or innovation output. The findings suggest that network structure, network relationship, and network position all impact on a firm's performance. Although the previous literature indicates that there are disagreements about the impact of dense or spare structure, as well as strong or weak ties, case evidence from Chinese software companies reveals that dense and strong connections with partners are positively associated with firms' performance. The second essay is a theoretical essay that illustrates the limitations of social network theory for explaining the source of network value and offers a new theoretical model that applies resource-based view to network environments. It suggests that network configurations, such as network structure, network relationship and network position, can be considered important network resources. In addition, this essay introduces the concept of network capability, and suggests that four types of network capabilities play an important role in unlocking the potential value of network resources and determining the distribution of network rents between partners. This essay also highlights the contingent effects of network capability on a firm's innovation output, and explains how the different impacts of network capability depend on a firm's strategic choices. This new theoretical model has been pre-tested with a case study of China software industry, which enhances the internal validity of this theory. The third essay addresses the questions of what impact network capability has on firm innovation performance and what are the antecedent factors of network capability. This essay employs a structural equation modelling methodology that uses a sample of 211 Chinese Hi-tech firms. It develops a measurement of network capability and reveals that networked firms deal with cooperation between, and coordination with partners on different levels according to their levels of network capability. The empirical results also suggests that IT maturity, the openness of culture, management system involved, and experience with network activities are antecedents of network capabilities. Furthermore, the two-group analysis of the role of international partner(s) shows that when there is a culture and norm gap between foreign partners, a firm must mobilize more resources and effort to improve its performance with respect to its innovation network. The fourth essay addresses the way in which network capabilities influence firm innovation performance. By using hierarchical multiple regression with data from Chinese Hi-tech firms, the findings suggest that there is a significant partial mediating effect of knowledge transfer on the relationships between network capabilities and innovation performance. The findings also reveal that the impacts of network capabilities divert with the environment and strategic decision the firm has made: exploration or exploitation. Network constructing capability provides a greater positive impact on and yields more contributions to innovation performance than does network operating capability in an exploration network. Network operating capability is more important than network constructing capability for innovative firms in an exploitation network. Therefore, these findings highlight that the firm can shape the innovation network proactively for better benefits, but when it does so, it should adjust its focus and change its efforts in accordance with its innovation purposes or strategic orientation.
Resumo:
This minireview is meant as an introduction to the following paper. To this end, it presents the general background against which the joint paper should be understood. The first objective of the present paper is thus to clarify some concepts and related terminology, drawing a clear distinction between i) atomic diversity (i.e., atomic-property space), ii) molecular or macromolecular diversity (i.e., molecular- or macromolecular-property spaces), and iii) chemical diversity (i.e., chemical-diversity space). The first refers to the various electronic states an atom can occupy. The second encompasses the conformational and property spaces of a given (macro)molecule. The third pertains to the diversity in structure and properties exhibited by a library or a supramolecular assembly of different chemical compounds. The ground is thus laid for the content of the joint paper, which pertains to case ii, to be placed in its broader chemodiversity context. The second objective of this paper is to point to the concepts of chemodiversity and biodiversity as forming a continuum. Chemodiversity is indeed the material substratum of organisms. In other words, chemodiversity is the material condition for life to emerge and exist. Increasing our knowledge of chemodiversity is thus a condition for a better understanding of life as a process.
Resumo:
Aim Background The expected benefit of transvaginal specimen extraction is reduced incision-related morbidity. Objectives A systematic review of transvaginal specimen extraction in colorectal surgery was carried out to assess this expectation. Method Search strategy The following keywords, in various combinations, were searched: NOSE (natural orifices specimen extraction), colorectal, colon surgery, transvaginal, right hemicolectomy, left hemicolectomy, low anterior resection, sigmoidectomy, ileocaecal resection, proctocolectomy, colon cancer, sigmoid diverticulitis and inflammatory bowel diseases. Selection criteria Selection criteria included large bowel resection with transvaginal specimen extraction, laparoscopic approach, human studies and English language. Exclusion criteria were experimental studies and laparotomic approach or local excision. All articles published up to February 2011 were included. Results Twenty-three articles (including a total of 130 patients) fulfilled the search criteria. The primary diagnosis was colorectal cancer in 51% (67) of patients, endometriosis in 46% (60) of patients and other conditions in the remaining patients. A concurrent gynaecological procedure was performed in 17% (22) of patients. One case of conversion to laparotomy was reported. In two patients, transvaginal extraction failed. In left- and right-sided resections, the rate of severe complications was 3.7% and 2%, respectively. Two significant complications, one of pelvic seroma and one of rectovaginal fistula, were likely to have been related to transvaginal extraction. The degree of follow up was specified in only one study. Harvested nodes and negative margins were adequate and reported in 70% of oncological cases. Conclusion Vaginal extraction of a colorectal surgery specimen shows potential benefit, particularly when associated with a gynaecological procedure. Data from prospective randomized trials are needed to support the routine use of this technique.
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.
Resumo:
This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Resumo:
Rapport de synthèse : Le glaucome à angle ouvert est une neuropathie optique chronique progressive pour laquelle de nombreux traitements tant médicaux que chirurgicaux ont été proposés. La prise en charge chirurgicale s'articule principalement autour de deux chirurgies filtrantes, la trabéculectomie et la sclérectomie profonde avec implant de collagène. Cependant, les complications postopératoires de ces deux interventions étant relativement fréquentes, la recherche s'est orientée vers des traitements alternatifs dont la mise en place de micro-drains. Ces implants de drainage diminuent la pression intraoculaire en créant un court-circuit du flux d'humeur aqueuse de la chambre antérieure vers l'espace sous-conjonctival avec formation d'une bulle de filtration. L'implant Ex-PRESS R-50 est un implant miniature (2.5 mm de long pour 400 µm de diamètre) en acier inoxydable et biocompatible. La présente étude s'est proposée d'étudier l'efficacité et la sécurité de l'implant miniature Ex-Press R-50 lors d'une opération combinée cataracte-glaucome. Trente-cinq yeux de 35 patients (âge moyen: 75 ans) ont été inclus dans l'étude. Tous les patients ont bénéficié d'une opération de la cataracte par phacoemulsification et mise en place d'un implant de chambre postérieure suivie de l'implantation du micro-drain. Les pressions intraoculaires préopératoires et postopératoires, la meilleure acuité visuelle corrigée, le nombre de médicaments anti-glaucomateux ainsi que le type et le nombre de complications ont été évalués mensuellement puis tous les 6 mois pendant 4 ans. Le succès total a été défini par une pression postopératoire finale inférieure à 18mmHg sans traitement médical associé, le succès partiel par une pression postopératoire finale inférieure à 18mmHg avec ou sans traitement médical associé.. Le suivi moyen a été de 36.9 mois avec une baisse de la pression intraoculaire significative d'environ 25%. Une augmentation de l'acuité visuelle a été observée après l'opération de la cataracte et le nombre de médicaments anti-glaucomateux a été réduit de 57%. Dix patients ont bénéficié d'un traitement supplémentaire de la bulle de filtration par injection d'anti-métabolite (mitomycine C). Nous avons observé 8 complications majeures (4 érosions conjonctivales et 4 obstructions de l'orifice interne du micro-drain), toutes suivies de l'ablation de l'implant et de la réalisation d'une chirurgie classique du glaucome. En se basant sur les courbes de Kaplan-Meier à 48 mois, le taux de succès total était de 32.7% et le succès partiel de 53.7%. Nous pouvons conclure suite à ce travail que l'implant miniature Ex-PRESS R-50 est associé à un nombre trop élevé de complications, même si les cas non compliqués ont bénéficié d'une baisse significative de la pression intraoculaire. La modification de l'architecture du micro-drain ainsi que de la technique chirurgicale devrait augmenter le taux de succès.
Resumo:
This report documents Phase II activities of a potentially four-phase project. The goal of the project is to study the feasibility of using advanced technologies from other industries to improve the efficiency and safety of winter highway maintenance vehicle operations. State departments of transportation from Iowa, Minnesota, and Michigan initially formed the study consortium, and several private vendors have become project partners. The Center for Transportation Research and Education (CTRE) at Iowa State University is managing project tasks
Resumo:
Selostus: Maan laadun käsite suomalaisen maatalousmaan tutkimuksessa