954 resultados para cephalosporin C production


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Magnetic fields are used in a number of processes related to the extraction of metals, production of alloys and the shaping of metal components. Computational techniques have an increasingly important role to play in the simulation of such processes, since it is often difficult or very costly to conduct experiments in the high temperature conditions encountered and the complex interaction of fluid flow, heat transfer and magnetic fields means simple analytic models are often far removed from reality. In this paper an overview of the computational activity at the University of Greenwich is given in this area, covering the past ten years. The overview is given from the point of view of the modeller and within the space limitations imposed by the format it covers the numerical methods used, attempts at validation against experiments or analytic procedures; it highlights successes, but also some failures. A broad range of models is covered in the review (and accompanying lecture), used to simulate (a) A-C field applications: induction melting, magnetic confinement and levitation, casting and (b) D-C field applications such as: arc welding and aluminium electroloysis. Most of these processes involve phase change of the metal (melting or solidification), the presence of a dynamic free surface and turbulent flow. These issues affect accuracy and need to be address by the modeller.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The two-stage assembly scheduling problem is a model for production processes that involve the assembly of final or intermediate products from basic components. In our model, there are m machines at the first stage that work in parallel, and each produces a component of a job. When all components of a job are ready, an assembly machine at the second stage completes the job by assembling the components. We study problems with the objective of minimizing the makespan, under two different types of batching that occur in some manufacturing environments. For one type, the time to process a batch on a machine is equal to the maximum of the processing times of its operations. For the other type, the batch processing time is defined as the sum of the processing times of its operations, and a setup time is required on a machine before each batch. For both models, we assume a batch availability policy, i.e., the completion times of the operations in a batch are defined to be equal to the batch completion time. We provide a fairly comprehensive complexity classification of the problems under the first type of batching, and we present a heuristic and its worst-case analysis under the second type of batching.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The article focuses on an information system to exploit the use of metadata within film and television production. It is noted that the television and film industries are used to working on big projects. This involves the use of actual film, video tape, and P.E.R.T charts for project planning. Scripts are in most instances revised. It is essential to attach information on these in order to manage, track and retrieve them. The use of metadata eases the operations involved in these industries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The television and film industries are used to working on large projects. These projects use media and documents of various types, ranging from actual film and videotape to items such as PERT charts for project planning. Some items, such as scripts, evolve over a period and go through many versions. It is often necessary to attach information to these “objects” in order to manage, track, and retrieve them. On large productions there may be hundreds of personnel who need access to this material and who in their turn generate new items which form some part of the final production. The requirements for this industry in terms of an information system may be generalized and a distributed software architecture built, primarily using the internet, to serve the needs of these projects. This architecture must enable potentially very large collections of objects to be managed in a secure environment with distributed responsibilities held by many working on the production. Copyright © 2005 by the Society of Motion Picture and Television Engineers, Inc.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents novel collaboration methods implemented using a centralized client/server product development integration architecture, and a decentralized peer-to-peer network for smaller and larger companies using open source solutions. The product development integration architecture has been developed for the integration of disparate technologies and software systems for the benefit of collaborative work teams in design and manufacturing. This will facilitate the communication of early design and product development within a distributed and collaborative environment. The novelty of this work is the introduction of an‘out-of-box’ concept which provides a standard framework and deploys this utilizing a proprietary state-of-the-art product lifecycle management system (PLM). The term ‘out-of-box’ means to modify the product development and business processes to suit the technologies rather than vice versa. The key business benefits of adopting such an approach are a rapidly reconfigurable network and minimal requirements for software customization to avoid systems instability

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The primary production in the Bristol Channel, U.K., was studied from 1973 to 1977: in this estuary, the euphotic zone extends from less than 0.5 m to greater than 10m and there is a large riverine input of inorganic nutrients. The standing stock of phytoplankton chlorophyll a was measured in 1973 and 1974 and was similar throughout the Bristol Channel but the rate of primary production was much greater where the water was less turbid. The estimated primary production was 6.8g C m−2 for the most turbid region and 164.9g C m−2 for the Outer Bristol Channel. A larger proportion of the annual primary production occurred in the spring in the Outer Channel than in the most turbid regions. Phaeocystis developed into blooms in some, but not all, years and exhibited a different light saturation curve to other phytoplankton populations. Serial incubations of short duration gave higher fixation rates than day-long incubations and it is argued that photoinhibition is probably insignificant in a mixed water column. Excretion rates of dissolved organic carbon by phytoplankton were always low.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Samples taken in the northern North Sea with the Continuous Plankton Recorder (CPR), the Undulating Oceanographic Recorder (UOR), the Longhurst Hardy Plankton Recorder (LHPR) and by our colleagues from other participating Institutes during the Fladen Ground Experiment (FLEX 76) were used to describe the vertical distribution and population dynamics of Calanus finmarchicus (Gunnerus) and to provide estimates of the production and carbon budget of the population from 19 March to 3 June, 1976. Total production of the 19 March to 3 June, 1976. Total production of the nauplii and copepodite stages (including adults), during the exponential growth phase in May, was estimated to be in the range of 0.49 to 0.91 g C m-2 d-1 or 29.0 to 55 g dry wt m-2 (14.5 to 27.8 g C m-2) for the three successive 10 d periods in May. Two gross growth efficiencies (K 1) (20 and 34%), together with the lower value of C. finmarchicus production, were used to calculate the gross ingestion levels of algae as 2.45 and 1.44 g C m-2 d-1 (73.5 and 43.2 g C m-2 over the May period). These ingestion levels, together with the algae ingested by other zooplankton species, are greater than the estimated total phytoplankton production of 45.9 g C m-2 over the FLEX period. A number of factors are discussed which could explain the discrepancies between the production estimates. One suggestion is that the vertical distribution of the development stages of this herbivorous copepod and their diel and ontogenetic migration patterns enable it to efficiently exploit its food source. Data from the FLEX experiment indicated that the depletion of nutrients limited the size of the spring bloom, but that it was the grazing pressure exerted by C. finmarchicus which was responsible for the control and depletion of the phytoplankton in the spring of 1976 in the northern North Sea.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Samples taken in the northern North Sea with the Continuous Plankton Recorder (CPR), the Undulating Oceanographic Recorder (UOR) and the Longhurst-Hardy Plankton Recorder (LHPR) during the Fladen Ground Experiment in 1976 (FLEX 76) are used to describe the vertical distribution and population dynamics of Thysanoessa inermis (Krøyer) and to provide estimates of the production and carbon budget of the population from 19th March to 3 June 1976. Spawning occurred in late April and early May, in near synchronisation with the start of the spring bloom of phytoplankton. Eggs, nauplii and calyptopes reached maximum abundance in succession, and furciliae were numerous when sampling ceased in early June. Adults increased in length from a mean of 12.1 mm in mid-March to 17.5 mm in early June and the estimated production was 2.40 mg m-3 over the 74 d period. Total carbon ingested by the population of T. inermis was estimated to be 10 mg C m-2 d-1 in the upper 100m which was only 1.5% of the daily primary production of 0.68 gC m-2 measured over the FLEX period 26 March to 4 June 1976. The grazing by T. inermis on the phytoplankton population was assumed to have little effect on the control and depletion of the spring phytoplankton bloom during FLEX 77.