951 resultados para bond steel-concrete


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bomb attacks carried out by terrorists, targeting high occupancy buildings, have become increasingly common in recent times. Large numbers of casualties and property damage result from overpressure of the blast followed by failing of structural elements. Understanding the blast response of multi-storey buildings and evaluating their remaining life have therefore become important. Response and damage analysis of single structural components, such as columns or slabs, to explosive loads have been examined in the literature, but the studies on blast response and damage analysis of structural frames in multi-storey buildings is limited and this is necessary for assessing the vulnerability of them. This paper investigates the blast response and damage evaluation of reinforced concrete (RC) frames, designed for normal gravity loads, in order to evaluate their remaining life. Numerical modelling and analysis were carried out using the explicit finite element software, LS DYNA. The modelling and analysis takes into consideration reinforcement details together and material performance under higher strain rates. Damage indices for columns are calculated based on their residual and original capacities. Numerical results generated in the can be used to identify relationships between the blast load parameters and the column damage. Damage index curve will provide a simple means for assessing the damage to a typical multi-storey building RC frame under an external bomb circumstance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Welding system has now been concentrated on the development of new process to achieve cost savings, higher productivity and better quality in manufacturing industry. Discrete alternate supply of shielding gas is a new technology that alternately supplies the different kinds of shielding gases in weld zone. As the newdevelopedmethods compared to the previous generalwelding with a mixing supply of shielding gas, it cannot only increase thewelding quality, but also reduce the energy by 20% and the emission rate of fume. As a result, under thesamewelding conditions,comparedwith thewelding by supplying pure argon, argon + 67% helium mixture by conventional method and thewelding by supplying alternately pure argon and pure helium by alternate method showed the increased welding speed. Also, the alternate method showed the same welding speed with argon + 67% helium mixture without largely deteriorating of weld penetration. The alternate method with argon and helium compared with the conventional methods of pure argon and argon + 67% helium mixture produced the lowest degree of welding distortion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.