Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms sets the stage for an adversarial and potentially destructive approach. There is a need for change in the construction industry—not only to a more cooperative approach to build mutual trust, respect and good faith—but also from a confrontationist and adversarial attitude to a harmonious relationship. It is necessary to change the culture to create a win-win situation. “Strategic Alliances” is one such concept. A strategic alliance is a cooperative arrangement between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. This paper begins with an overview of the Australian building construction industry, then reviews the literature and describes an analysis framework comprising six attributes of strategic alliances—trust, commitment, interdependence, cooperation, communication, and joint problem solving. Given the trend towards greater emphasis on broader contracting firm performance criteria, indicators are proposed as a component of the tender evaluation process for public works.
Resumo:
Road and highway infrastructure provides the backbone for a nation’s economic growth. The versatile dispersion of population in Australia and its resource boom, coupled with improved living standards and growing societal expectations, calls for continuing development and improvement of road infrastructure under the current local, state and federal governments’ policies and strategic plans. As road infrastructure projects involve huge resources and mechanisms, achieving sustainability not only on economic scales but also through environmental and social responsibility becomes a crucial issue. While sustainability is a logical link to infrastructure development, literature study and consultation with the industry found that there is a lack of common understanding on what constitutes sustainability in the infrastructure context. Its priorities are often interpreted differently among multiple stakeholders. For road infrastructure projects which typically span over long periods of time, achieving tangible sustainability outcomes during the lifecycle of development remains a formidable task. Sustainable development initiatives often remain ideological as in macro-level policies and broad-based concepts. There were little elaboration and exemplar cases on how these policies and concepts can be translated into practical decision-making during project implementation. In contrast, there seemed to be over commitment on research and development of sustainability assessment methods and tools. Between the two positions, there is a perception-reality gap and mismatch, specifically on how to enhance sustainability deliverables during infrastructure project delivery. Review on past research in this industry sector also found that little has been done to promote sustainable road infrastructure development; this has wide and varied potential impacts. This research identified the common perceptions and expectations by different stakeholders towards achieving sustainability in road and highway infrastructure projects. Face to face interviews on selected representatives of these stakeholders were carried out in order to select and categorize, confirm and prioritize a list of sustainability performance targets identified through literature and past research. A Delphi study was conducted with the assistance of a panel of senior industry professionals and academic experts, which further considered the interrelationship and influence of the sustainability indicators, and identified critical sustainability indicators under ten critical sustainability criteria (e.g. Environmental, Health & Safety, Resource Utilization & Management, Social & Cultural, Economic, Public Governance & Community Engagement, Relations Management, Engineering, Institutional and Project Management). This presented critical sustainability issues that needed to be addressed at the project level. Accordingly, exemplar highway development projects were used as case studies to elicit solutions for the critical issues. Through the identification and integration of different perceptions and priority needs of the stakeholders, as well as key sustainability indicators and solutions for critical issues, a set of decision-making guidelines was developed to promote and drive consistent sustainability deliverables in road infrastructure projects.
Resumo:
Construction clients often use financial incentives to encourage stakeholder motivation and commitment to voluntary higher-order project goals. Despite the increased use of financial incentives, there is little literature addressing means of optimizing outcomes. Using a case study methodology, the examination of a successful Australian construction project demonstrates the features of a positively geared procurement approach that promotes the effectiveness of financial incentives. The research results show that if the incentive system is perceived to be fair and is applied to reward exceptional performance, and not to manipulate, then contractors are more likely to be positively motivated.
Resumo:
Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
The Silk Road Project was a practice-based research project investigating the potential of motion capture technology to inform perceptions of embodiment in dance performance. The project created a multi-disciplinary collaborative performance event using dance performance and real-time motion capture at Deakin University’s Deakin Motion Lab. Several new technological advances in producing real-time motion capture performance were produced, along with a performance event that examined the aesthetic interplay between a dancer’s movement and the precise mappings of its trajectories created by motion capture and real-time motion graphic visualisations.
Resumo:
The tourism, construction, and education plans and skills strategies (embedded in project reports) were developed as part of a nation-wide comprehensive research project covering current, emerging and future skills deficiencies and requirements in Bahrain’s labour market. The research covered the majority of economic sectors and activities in the Kingdom and will serve as a basis for formulating industry and occupational outlooks as well as career guidance and awareness activities by academic and training institutions across Bahrain. It will provides foundation work for industry skills councils in order to conduct and achieve a uniform system of occupational standards across industries, occupations and job levels.
Resumo:
Crashes at rail level crossings represent a significant problem, both in Australia and worldwide. Advances in driving assessment methods, such as the provision of on-road instrumented test vehicles, now provide researchers with the opportunity to further understand driver behaviour at rail level crossings in ways not previously possible. This paper gives an overview of a recent on-road pilot study of driver behaviour at rail level crossings in which 25 participants drove a pre-determined route, incorporating 4 rail level crossings, using MUARC's instrumented On-Road Test Vehicle (ORTeV). Drivers provided verbal commentary whilst driving the route, and a range of other data were collected, including eye fixations, forward, cockpit and driver video, and vehicle data (speed, braking, steering wheel angle, lane tracking etc). Participants also completed a post trial cognitive task analysis interview. Extracts from the wider analyses are used to examine in depth driver behaviour at one of the rail level crossings encountered during the study. The analysis presented, along with the overall analysis undertaken, gives insight into the driver and wider systems factors that shape behaviour at rail level crossings, and highlights the utility of using a multi-method, instrumented vehicle approach for gathering data regarding driver behaviour in different contexts.
Resumo:
Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)
Resumo:
The purpose of this paper is to summarize the outcomes of a detailed research study carried out as part of the fulfilment of a doctoral programme which examined the relationships between, and impacts of organisational culture on construction performance within a Hong Kong context. The research used a mixed methodology approach consisting of an organisational culture survey using an adapted validated and reliable measurement instrument (the Denison Organisational Culture Survey), mini-case studies in four Hong Kong construction companies and correlated the derived culture scores against performance scores measured by the Hong Kong Housing Department Performance Assessment Scoring System (PASS). The significance of the research was to advance knowledge of the importance of organisational culture strength as a performance driver in the construction industry and the further proof of the culture performance links using a set of measures of the latter which were not financially-based. The findings of the research make a contribution to theory by further validating the work by Denison (1990) and others, not only in that a successful link between organisational culture and performance was demonstrated, but it also identifies particular cultural factors in organisations that appear to be significantly responsible for achieving successful outcomes and reveals opportunities for further research into the organisational culture of construction companies Keywords: organisational culture, construction performance, business success.
Resumo:
Highway construction often requires a significant capital input; therefore it often causes serious financial implications for developers, owners and operators. The recent industry-wide focus on sustainability has added a new dimension to the evaluation of highway projects, particularly on the economical scale of ‘going green’. Comprehensive analysis of the whole-of-life highway development that responds to sustainability challenges is one of the primary concerns for stakeholders. Principles of engineering economics and life cycle costing have been used to determine the incremental capacity investments for highway projects. However, the consideration of costs and issues associated with sustainability is still very limited in current studies on highway projects. Previous studies have identified that highway project investments are primarily concerned with direct market costs that can be quantified through life cycle costing analysis (LCCA). But they tend to ignore costs that are difficult to calculate, as those related to environmental and social elements. On a more positive note, these studies proved that the inclusion of such costs is an essential part of the overall development investment and a primary concern for decision making by the stakeholders. This paper discusses a research attempt to identify and categorise sustainability cost elements for highway projects. Through questionnaire survey, a set of sustainability cost elements on highway projects has been proposed. These cost elements are incorporated into the extension of some of the existing Life Cycle Costing Analysis (LCCA) models in order to produce a holistic financial picture of the highway project. It is expected that a new LCCA model will be established to serve as a suitable tool for decision making for highway project stakeholders.
Resumo:
With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.
Resumo:
Simultaneous Localization And Mapping (SLAM) is one of the major challenges in mobile robotics. Probabilistic techniques using high-end range finding devices are well established in the field, but recent work has investigated vision only approaches. This paper presents a method for generating approximate rotational and translation velocity information from a single vehicle-mounted consumer camera, without the computationally expensive process of tracking landmarks. The method is tested by employing it to provide the odometric and visual information for the RatSLAM system while mapping a complex suburban road network. RatSLAM generates a coherent map of the environment during an 18 km long trip through suburban traffic at speeds of up to 60 km/hr. This result demonstrates the potential of ground based vision-only SLAM using low cost sensing and computational hardware.
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
Productivity is basic statistical information for many international comparisons and country performance assessments. This study estimates the construction labour productivity of 79 selected economies. The real (purchasing power parities converted) and nominal construction expenditure from the Report of 2005 International Comparison Programme published by the World Bank and construction employment from the database of labour statistics (LABORSTA) operated by the Bureau of Statistics of International Labour Organization were used in the estimation. The inference statistics indicate that the descending order of nominal construction labour productivity from high income economies to low income economies is not established. The average construction labour productivity of low income economies is higher than middle income economies when the productivity calculation uses purchasing power parities converted data. Malaysia ranked 50th and 63rd position among the 79 selected economies on real and nominal measurement respectively.