1000 resultados para Rapid Technologie
Resumo:
The need to estimate percentages and/or numbers occurs frequently during practical research work; accurate but rapid estimates can be useful when planning research programmes. Charts are provided that may be used as a visual aid to estimating numbers of animals/plants in a specific situation, for example, the number of fish fry in a subsample from a hatchery tank, or the percentage composition of a sample such as the percentage algal cover in a pond.
Resumo:
This is the River Gowy rapid corridor survey July 1995: Ecology South Mersey report produced by the National Rivers Authority North West Region in 1995. This report looks at the survey carried out by the South Mersey Ecology Team prior to routine deweeding operations on the main River Gowy at the end of July, 1995. The survey covered Flood Defence Stretch References RGOW03 to RGOW16. These stretches were further divided into a series of 43 stretches, each one being approximately 500m in length for ease o f mapping by Ecology. Recommendations for each length have been cross-referenced with the Bill of Quantities where possible, e.g. retention o f margins. In Flood Defence stretch RGOW03, the South West Winter Wetland forms an important habitat for birds. In stretches RGOW04 to RGOW05, the Gowy Meadows and Ditches have been designated a Grade A, Site of Biological Importance, by Cheshire County Council due to the nature of the acidic grassland and diverse ditches. In stretches RGOWIO to RGOW11 the left bank forms Hockenhull Platts, Grade A Site of Biological Importance and County Trust Reserve. In stretches RGOW15 to RGOW16, the area from Mill Farm to the Shropshire Union Canal is a Grade A Site of Biological Importance. These sites are very sensitive and detailed recommendations for working practices can be found in the relevant sections o f the survey.