866 resultados para Project 2007-001-EP : Interoperable Standards Development


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

There is substantial evidence that Specialist Breast Nurses (SBNs) make an important contribution to improved outcomes for women with breast cancer, by providing information and support and promoting continuity of care. However, a recent study has identified significant variation in how the role functions across individual nurses and settings, which is likely to contribute to varied outcomes for women with breast cancer. The project reported in this paper illustrates how a set of competency standards for SBNs were developed by the National Breast Cancer Centre. The competency standards were developed through a review of published literature and consultation with key stakeholders. The resulting SBN Competency Standards reflect the core domains and elements of SBN practice seen as integral to achieving optimal outcomes for women with breast cancer. This project identifies the SBN as a registered nurse who applies advanced knowledge of the health needs, preferences and circumstances of women with breast cancer to optimise the individual's health and well-being at various phases across the continuum of care, including diagnosis, treatment, rehabilitation, follow-up and palliative care. The five core domains of practice identified are: Supportive care; Collaborative care; Coordinated care; Information provision and education; and Clinical leadership. A variety of education programs are currently available for nurses who wish to learn about breast cancer nursing. The majority of stakeholders consulted in this project agreed that a Graduate Diploma level of education is required at minimum in order for an SBN to develop the minimum level of competence required to perform the role. The evidence supports the view that as an advanced role, nurses practising as SBNs require high-quality programs of sufficient depth and scope to achieve the required level of competence

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research study investigated the factors that influenced the development of teacher identity in a small cohort of mature-aged graduate pre-service teachers over the course of a one-year Graduate Diploma program (Middle Years). It sought to illuminate the social and relational dynamics of these pre-service teachers’ experiences as they began new ways of being and learning during a newly introduced one-year Graduate Diploma program. A relational-ontological perspective underpinned the relational-cultural framework that was applied in a workshop program as an integral part of this research. A relational-ontological perspective suggests that the development of teacher identity is to be construed more as an ontological process than an epistemological one. Its focus is more on questions surrounding the person and their ‘becoming’ a teacher than about the knowledge they have or will come to have. Hence, drawing on work by researchers such as Alsup (2006), Gilligan, (1982), Isaacs, (2007), Miller (1976), Noddings, (2005), Stout (2001), and Taylor, (1989), teacher identity was defined as an individual pre-service teacher’s unique sense of self as a teacher that included his or her beliefs about teaching and learning (Alsup, 2006; Stout, 2001; Walkington, 2005). Case-study was the preferred methodology within which this research project was framed, and narrative research was used as a method to document the way teacher identity was shaped and negotiated in discursive environments such as teacher education programs, prior experiences, classroom settings and the practicum. The data that was collected included student narratives, student email written reflections, and focus group dialogue. The narrative approach applied in this research context provided the depth of data needed to understand the nature of the mature-aged pre-service teachers’ emerging teacher identities and experiences in the graduate diploma program. Findings indicated that most of the mature-aged graduate pre-service teachers came in to the one-year graduate diploma program with a strong sense of personal and professional selves and well-established reasons why they had chosen to teach Middle Years. Their choice of program involved an expectation of support and welcome to a middle-school community and culture. Two critical issues that emerged from the pre-service teachers’ narratives were the importance they placed on the human support including the affirmation of themselves and their emerging teacher identities. Evidence from this study suggests that the lack of recognition of preservice teachers’ personal and professional selves during the graduate diploma program inhibited the development of a positive middle-school teacher identity. However, a workshop program developed for the participants in this research and addressing a range of practical concerns to beginning teachers offered them a space where they felt both a sense of belonging to a community and where their thoughts and beliefs were recognized and valued. Thus, the workshops provided participants with the positive social and relational dynamics necessary to support them in their developing teacher identities. The overall findings of this research study strongly indicate a need for a relational support structure based on a relational-ontological perspective to be built into the overall course structure of Graduate Pre-service Diplomas in Education to support the development of teacher identity. Such a support structure acknowledges that the pre-service teacher’s learning and formation is socially embedded, relational, and a continual, lifelong process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The increasing prevalence of new media technologies and the rise of citizen journalism has coincided with a crisis in industrial journalism –as the figure of the "journalist as hero" is fading, new media forms have facilitated the production of news content "from below" by citizens and "pro-am" journalists. Participation in an action-research project run during the 2007 Australian Federal Election, youdecide 2007, allowed the authors to gain first-hand insights into the progress of citizen-led news media in Australia, but also allowed us to develop an account of what the work of facilitating citizen journalism involves. These insights are important to understanding the future of professional journalism and journalism education, as more mainstream media organizations move to accommodate and harness user-created content. The paper considers the relevance of citizen journalism projects as forms of R&D for understanding news production and distribution in participatory media cultures, and the importance of grounded case studies for moving beyond normative debates about new media and the future of journalism.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In December 2006, the Engineering and Technology Group of Queensland’s Department of Main Roads entered into a three-year skid resistance management research project with QUT Faculty of Built Environment and Engineering researchers and the QUT-based CRC for Integrated Engineering Asset Management (CIEAM). CIEAM undertakes a broad range of asset management research in the areas of defence, utilities, transportation and industrial processes. “The research project is an important activity of Main Roads’ Skid Resistance Management Plan published in June 2006.” said Main Roads project leader Mr Justin Weligamage. “The intended project output is a decision-support model for use by Road Asset Managers throughout a road network. The research objective is to enable road asset managers to better manage the surfacing condition of the road asset with specific focus on skid resistance,” said QUT project leader Professor Arun Kumar. The research project will review existing skid resistance investigatory levels, develop a risk-based method to establish skid resistance investigatory levels and improve the decision support methodology in order to minimise crashes. The new risk-based approach will be used to identify locations on the Queensland state-controlled road network that may have inadequate skid resistance. Once a high risk site is identified, the appropriate remedial action will be decided on. This approach will allow road asset managers to target optimal remedial actions, reducing the incidence and severity of crashes where inadequate skid resistance is a contributing cause.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper investigated the phenomenon of prejudice among ISD project members. We presented a theoretical discussion followed by one qualitative and one quantitative study. In the qualitative study, we interviewed different members of the project teams to understand the different types of prejudice possessed by team members. Results of this interview study led to the development of prejudice scales for IT members and users, which was used in the quantitative study. We surveyed 128 ISD teams and found that prejudice was related task and relationship conflict, satisfaction and willingness to work together in the future. Furthermore, prejudice exerts stronger influences on users than IT members in terms of increasing task and relationship conflicts and decreasing goal commitment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Picturebooks invite performance every time they are read. What happens to them when they’re adapted for live performance? This ongoing practice led research project (2008-) regenerates and transforms picturebook The Empty City (Hachette/Livre 2007) by David Megarrity and Jonathon Oxlade into a live experience. In this rebuilding, interanimation of text and illustration on the picturebook page suddenly open up into a new and complex structure incorporating composition of music, animation, live action, projected image and performing objects. The presenter is the creator of both the source text and writer/composer of the adaptation, providing a unique vantage point that draws on sources from both within and without the creative process up to and including audience reception. From the foundations up, this paper’s focus is on deep, muddy sites of development in the adaptation process, unearthed treasures, and how perceptions of fear and safety push, sway and stress the building of a new performance work for children in content, form and process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Georgia’s ‘National Integrity Systems’ are the institutions, laws, procedures, practices and attitudes that encourage and support integrity in the exercise of power in modern Georgian society. Integrity systems function to ensure that power is exercised in a manner that is true to the values, purposes and duties for which that power is entrusted to, or held by, institutions and individual office-holders. This report presents the results of the Open Society Institute / Open Society – Georgia Foundation funded project Georgian National Integrity Systems Assessment (GNISA), conducted in 2005–2006 by Caucasus Institute for Peace, Democracy and Development, Transparency International Georgia, Georgian Young Lawyers Association, in close cooperation with Griffith University Institute for Ethics, Governance and Law (Australia), and Tiri Group (UK), into how different elements of integrity systems interact, which combinations of institutions and reforms make for a strong integrity system, and how Georgia’s integrity systems should evolve to ensure coherence, not chaos in the way public integrity is maintained. Nevertheless all participants of the research may not share some conclusions given in the GNISA report.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The ICT degrees in most Australian universities have a sequence of up to three programming subjects, or units. BABELnot is an ALTC-funded project that will document the academic standards associated with those three subjects in the six participating universities and, if possible, at other universities. This will necessitate the development of a rich framework for describing the learning goals associated with programming. It will also be necessary to benchmark exam questions that are mapped onto this framework. As part of the project, workshops are planned for ACE 2012, ICER 2012 and ACE 2013, to elicit feedback from the broader Australasian computing education community, and to disseminate the project’s findings. The purpose of this paper is to introduce the project to that broader Australasian computing education community and to invite their active participation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.