979 resultados para Professional projects
Resumo:
Professional development opportunities are offered piecemeal to K-12 teachers in Iowa through Area Education Agencies (AEAs), Regents’ institutions, community colleges, private colleges, private corporations, and out-of-state institutions (often online). Compiling a comprehensive list of in-service and pre-service opportunities for primary and secondary public school educators is not feasible for a variety of reasons. However, this report briefly summarizes most of the bioscience-related options for professional development available for K-12 educators this summer and over the past year.
Resumo:
Alumnes de formació professional copen els graus dedicats a formar el professorat. La irrupcio d'estudiants de FP deixa fora de la universitat alguns batxillers.
Resumo:
Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.
Resumo:
Considering teams as complex adaptive systems (CAS) this study deals with changes in team effectiveness over time in a specific context: professional basketball. The sample comprised 23 basketball teams whose outcomes were analysed over a 12-year period according to two objective measures. The results reveal that all the teams showed chaotic dynamics, one of the key characteristics of CAS. A relationship was also found between teams showing low-dimensional chaotic dynamics and better outcomes, supporting the idea of healthy variability in organizational behaviour. The stability of the squad was likewise found to influence team outcomes, although it was not associated with the chaotic dynamics in team effectiveness. It is concluded that studying teams as CAS enables fluctuations in team effectiveness to be explained, and that the techniques derived from nonlinear dynamical systems, developed specifically for the study of CAS, are useful for this purpose.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
The Iowa Department of Transportation's Access Management Task Force was established as part of the Iowa Department of Transportation's overall Safety Management System (SMS) effort. The goal of the Access Management Task Force is to develop a program designed to educate and market the concept and benefits of access management to landowners and developers, professional planners and engineers, planning and zoning staff members, appointed and elected officials, and motorists. Access management is pursued through the design and control of driveways, curb cuts, turning movements, interior circulation of parking lots, and public street connections and intersections. Usually, state highways or major urban and suburban arterial streets are the targets of access management projects. Access management is also a concern on main county roads when there is a transition from a rural environment to a town or city.
Resumo:
The Iowa Department of Transportation Office of Research & Analytics has created this Guide to help researchers and contractors of the Iowa DOT attain compliance with Federal and Iowa DOT Public Access Policies for transportation-related research publications and datasets. This guide provides direction for filling out the data management plan template (also attached to this record) that will help satisfy Iowa DOT and U.S. DOT requirements.
Resumo:
Peer-reviewed