941 resultados para Multiprocessor scheduling with resource sharing


Relevância:

40.00% 40.00%

Publicador:

Resumo:

the modern joint protection (JP) concept for people with rheumatoid arthritis (RA) is an active coping strategy to improve daily tasks and role performance by changing working methods and using assistive devices. Effective group JP education includes psycho-educational interventions. The Pictorial Representation of Illness and Self Measure (PRISM) is an interactive hands-on-tool, assessing (a) the individual's perceived burden of illness and (b) relevant individual resources. Both issues are important for intrinsic motivation to take action and change behaviour. This study compared individual conventional JP education (C-JP) with PRISM-based JP education (PRISM-JP).

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Venous thromboembolism (VTE) is common and has a high impact on morbidity, mortality, and costs of care. Although most of the patients with VTE are aged ≥65 years, there is little data about the medical outcomes in the elderly with VTE. The Swiss Cohort of Elderly Patients with VTE (SWITCO65+) is a prospective multicenter cohort study of in- and outpatients aged ≥65 years with acute VTE from all five Swiss university and four high-volume non-university hospitals. The goal is to examine which clinical and biological factors and processes of care drive short- and long-term medical outcomes, health-related quality of life, and medical resource utilization in elderly patients with acute VTE. The cohort also includes a large biobank with biological material from each participant. From September 2009 to March 2012, 1,863 elderly patients with VTE were screened and 1003 (53.8 %) were enrolled in the cohort. Overall, 51.7 % of patients were aged ≥75 years and 52.7 % were men. By October 16, 2012, after an average follow-up time of 512 days, 799 (79.7 %) patients were still actively participating. SWITCO65+ is a unique opportunity to study short- and long-term outcomes in elderly patients with VTE. The Steering Committee encourages national and international collaborative research projects related to SWITCO65+, including sharing anonymized data and biological samples.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

INTRODUCTION: The paucity of data on resource use in critically ill patients with hematological malignancy and on these patients' perceived poor outcome can lead to uncertainty over the extent to which intensive care treatment is appropriate. The aim of the present study was to assess the amount of intensive care resources needed for, and the effect of treatment of, hemato-oncological patients in the intensive care unit (ICU) in comparison with a nononcological patient population with a similar degree of organ dysfunction. METHODS: A retrospective cohort study of 101 ICU admissions of 84 consecutive hemato-oncological patients and 3,808 ICU admissions of 3,478 nononcological patients over a period of 4 years was performed. RESULTS: As assessed by Therapeutic Intervention Scoring System points, resource use was higher in hemato-oncological patients than in nononcological patients (median (interquartile range), 214 (102 to 642) versus 95 (54 to 224), P < 0.0001). Severity of disease at ICU admission was a less important predictor of ICU resource use than necessity for specific treatment modalities. Hemato-oncological patients and nononcological patients with similar admission Simplified Acute Physiology Score scores had the same ICU mortality. In hemato-oncological patients, improvement of organ function within the first 48 hours of the ICU stay was the best predictor of 28-day survival. CONCLUSION: The presence of a hemato-oncological disease per se is associated with higher ICU resource use, but not with increased mortality. If withdrawal of treatment is considered, this decision should not be based on admission parameters but rather on the evolutional changes in organ dysfunctions.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

BACKGROUND: In high-income countries, viral load is routinely measured to detect failure of antiretroviral therapy (ART) and guide switching to second-line ART. Viral load monitoring is not generally available in resource-limited settings. We examined switching from nonnucleoside reverse transcriptase inhibitor (NNRTI)-based first-line regimens to protease inhibitor-based regimens in Africa, South America and Asia. DESIGN AND METHODS: Multicohort study of 17 ART programmes. All sites monitored CD4 cell count and had access to second-line ART and 10 sites monitored viral load. We compared times to switching, CD4 cell counts at switching and obtained adjusted hazard ratios for switching (aHRs) with 95% confidence intervals (CIs) from random-effects Weibull models. RESULTS: A total of 20 113 patients, including 6369 (31.7%) patients from 10 programmes with access to viral load monitoring, were analysed; 576 patients (2.9%) switched. Low CD4 cell counts at ART initiation were associated with switching in all programmes. Median time to switching was 16.3 months [interquartile range (IQR) 10.1-26.6] in programmes with viral load monitoring and 21.8 months (IQR 14.0-21.8) in programmes without viral load monitoring (P < 0.001). Median CD4 cell counts at switching were 161 cells/microl (IQR 77-265) in programmes with viral load monitoring and 102 cells/microl (44-181) in programmes without viral load monitoring (P < 0.001). Switching was more common in programmes with viral load monitoring during months 7-18 after starting ART (aHR 1.38; 95% CI 0.97-1.98), similar during months 19-30 (aHR 0.97; 95% CI 0.58-1.60) and less common during months 31-42 (aHR 0.29; 95% CI 0.11-0.79). CONCLUSION: In resource-limited settings, switching to second-line regimens tends to occur earlier and at higher CD4 cell counts in ART programmes with viral load monitoring compared with programmes without viral load monitoring.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

When project managers determine schedules for resource-constrained projects, they commonly use commercial project management software packages. Which resource-allocation methods are implemented in these packages is proprietary information. The resource-allocation problem is in general computationally difficult to solve to optimality. Hence, the question arises if and how various project management software packages differ in quality with respect to their resource-allocation capabilities. None of the few existing papers on this subject uses a sizeable data set and recent versions of common software packages. We experimentally analyze the resource-allocation capabilities of Acos Plus.1, AdeptTracker Professional, CS Project Professional, Microsoft Office Project 2007, Primavera P6, Sciforma PS8, and Turbo Project Professional. Our analysis is based on 1560 instances of the precedence- and resource-constrained project scheduling problem RCPSP. The experiment shows that using the resource-allocation feature of these packages may lead to a project duration increase of almost 115% above the best known feasible schedule. The increase gets larger with increasing resource scarcity and with increasing number of activities. We investigate the impact of different complexity scenarios and priority rules on the project duration obtained by the software packages. We provide a decision table to support managers in selecting a software package and a priority rule.