868 resultados para Construction projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Management (PM) as an academic field is relatively new in Australian universities. Moreover, the field is distributed across four main areas: business (management), built environment and construction, engineering and more recently ICT (information systems). At an institutional level, with notable exceptions, there is little engagement between researchers working in those individual areas. Consequently, an initiative was launched in 2009 to create a network of PM researchers to build a disciplinary base for PM in Australia. The initiative took the form of a bi-annual forum. The first forum established the constituency and spread of PM research in Australia (Sense et al., 2011). This special issue of IJPM arose out of the second forum, held in 2012, that explored the notion of an Australian perspective on PM. At the forum, researchers were invited to collaborate to explore issues, methodological approaches, and theoretical positions underpinning their research and to answer the question: is there a distinctly Australian research agenda which responds to the current challenges of large and complex projects in our region? From a research point of view, it was abundantly clear at the forum that many of the issues facing Australian researchers are shared around the world. However, what emerged from the forum as the Australian perspective was a set of themes and research issues that dominate the Australia research agenda.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gross value of cons truction work in the repair , maintenance, minor alte ration and addition (RMAA) sector in Hong Kong has expanded dramatically by 58% from 1998 to 2007, accounting for over 53% of the whole construction market in 2007. Unfortunately, the portion of industrial accidents arising from this sector also increased substantially during the same period. It is important to improve the safety performance of the RMAA sector. This paper has set out the objectives to examine safety statistics of RMAA works; to compare them with those of green field projects; and more importantly, to highlight potential hurdles en countered in the process of comparison and finally to provide effective recommendations for overcoming these impediments. To strive for continuous safety improvement of RMAA works, comparable safety statistics should be compiled for this sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was a step forward in developing an extension of the concept of constructability to include the post-occupancy stages of operation and maintenance. This was through an in-depth study of Australian health projects and interviews with professionals in the field. The thesis investigated how the operation and maintenance stakeholders can enter the initial planning, design and construction phases resulting in more efficient and effective delivery of infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The design-build (DB) system is regarded as an effective means of delivering sustainable buildings. Specifying clear sustainability requirements to potential contractors is of great importance to project success. This research investigates the current state-of-the-practice for the definition of sustainability requirements within the public sectors of the U.S. construction market using a robust content analysis of 49 DB requests for proposals (RFPs). The results reveal that owners predominantly communicate their desired level of sustainability through the LEED certification system. The sustainability requirement has become an important dimension for the best-value evaluation of DB contractors with specific importance weightings of up to 25%. Additionally, owners of larger projects and who provide less design information in their RFPs generally allocate significantly higher importance weightings to sustainability requirements. The primary knowledge contribution of this study to the construction industry is the reveal of current trend in DB procurement for green projects. The findings also provide owners, architects, engineers, and constructors with an effective means of communicating sustainability objectives in solicitation documents.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.