826 resultados para the construction of housing and quality of life


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sexpartite vaults constitute one of the most interesting chapters in European Gothic architecture. Originally, the use of the square cross-ribbed vault was limited to relatively small spaces, but when the need arose to cover spaces of considerable size, a new vault with very peculiar characteristics appeared. This new vault was a cross-ribbed vault that was reinforced in the centre by a rib that was parallel to the transverse ribs which effectively divided the vault in half. This configuration breaks the side arch into two fragments, creating a pair of windows on each side. The volumetrics of these vaults is extremely complex and the difficulties involved in their construction perhaps explain why they were abandoned in favour of the simple cross ribbed vault, now with rectangular sections. The existence of the sexpartite vault barely lasted more than fifty years, from the end of the XII century and the beginning of the XIII. Towards the end of the 19th century Viollet-le-Duc gave a succinct explanation of this type of vault. A. Choisy also, later, devotes some pages to the French sexpartite vault; since then, the subject has only been broached in a few references in later studies on Gothic architecture. However, despite its short period of existence, the sexpartite vault spread throughout Europe and was used to build important vaulting. Viollet-le-Duc's sexpartite vault could be considered to be the prototype of them all, while it is true that the studies that we have conducted so far lead us to affirm that there is a wide variety of vaults, with different volumetric spaces and different construction strategies. Therefore, we believe that this chapter of international Gothic deserves further study applying the knowledge and resources that are available today. This paper has been written to explore the most significant European sexpartite vaults. New measurement technology has led to a revolution in research into the history of construction, allowing studies to be conducted that were hitherto impossible. Thorough data collection using total station and photogrammetry has enabled us to identify the stereotomy of the voussoirs, tas-de-charges and keystones, as well as the bonding of the surfaces of the severies. A comparison of the construction techniques employed in the different vaults studied reveals common construction features and aspects that are specific to each country. Thus we are able to establish the relationship between sexpartite vaults in different European countries and their influence on each other.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Structural information on complex biological RNA molecules can be exploited to design tectoRNAs or artificial modular RNA units that can self-assemble through tertiary interactions thereby forming nanoscale RNA objects. The selective interactions of hairpin tetraloops with their receptors can be used to mediate tectoRNA assembly. Here we report on the modulation of the specificity and the strength of tectoRNA assembly (in the nanomolar to micromolar range) by variation of the length of the RNA subunits, the nature of their interacting motifs and the degree of flexibility of linker regions incorporated into the molecules. The association is also dependent on the concentration of magnesium. Monitoring of tectoRNA assembly by lead(II) cleavage protection indicates that some degree of structural flexibility is required for optimal binding. With tectoRNAs one can compare the binding affinities of different tertiary motifs and quantify the strength of individual interactions. Furthermore, in analogy to the synthons used in organic chemistry to synthesize more complex organic compounds, tectoRNAs form the basic assembly units for constructing complex RNA structures on the nanometer scale. Thus, tectoRNA provides a means for constructing molecular scaffoldings that organize functional modules in three-dimensional space for a wide range of applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Gazprom is determined to continue its efforts to build the South Stream gas pipeline regardless of the slump on the European gas market and the fact that there is sufficient capacity already in the existing transport infrastructure. The official inauguration of the maritime section of South Stream was held on 7 December this year, but the construction itself will commence in 2014. The agreements concluded so far, both intergovernmental and between corporations, are necessary for the launch of the construction of the new pipeline, but still do not guarantee that the project will be completed on time. First of all, some legal problems have yet to be resolved, such as the evaluation of the compliance of the planned actions with the ‘third energy package’ or the fact that ecological surveys required under European law need to be carried out. Secondly, given the present situation on the European gas market and medium-term forecasts, the high cost of implementation of this project and the maintenance expenses of existing pipelines – which are not being used to full capacity – the new project seems to be unfeasible. However, Gazprom’s determination in its efforts to build the pipeline proves that Russia is ready to take a high economic risk to maintain its dominant position on the European gas supply market; it will restrict the possibilities of alternative infrastructural projects being implemented (above all, the EU’s Southern Corridor) and use the construction of new pipelines as an instrument of political pressure on the present transit countries (especially Ukraine).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During Russian PM Dmitry Medvedev’s working visit to Minsk on 18 July, Russia and Belarus signed a general contract for the construction of a nuclear power plant in Belarus. The signature brought to an end the complex negotiations which had been underway since January 2009 involving the leadership in Minsk, the Russian government and Atomstroyexport, the Russian company that will be the main contractor of the investment. However, the power plant’s future ownership structure, management arrangements and terms and conditions of profit sharing remain unclear. The Belarusian leadership hopes that with the launch of the nuclear power plant, it will be able to reduce gas imports from Russia, gas being the main resource used in producing heat and electricity in Belarus. This should in turn reduce the costs of energy generation. In addition, Minsk expects that the new investment will allow it to export electricity surpluses to the European Union, including Poland. Agreements concerning the power plant have been concluded over the last year or so and, according to these, Russia has acquired partial control of the Belarusian electricity grid, especially with regard to the transmission of energy to foreign markets. Russia is also the sole creditor and contractor for the investment, and the sole future provider of nuclear fuel. Therefore, implementation of the project will exacerbate Minsk’s already significant dependence on Moscow in energy and political terms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

First published in 1891 under title: Tales of soldiers and civilians.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fourth annual meeting held in Chicago.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"New series" vol. IV, no. 11.