876 resultados para project planning and controlling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Strategic planning and more specifically, the impact of strategic planning on organisational performance has been the subject of significant academic interest since the early 1970's. However, despite the significant amount of previous work examining the relationship between strategic planning and organisational performance, a comprehensive literature review identified a number of areas where contributions to the domain of study could be made. In overview, the main areas for further study identified from the literature review were a) a further examination of both the dimensionality and conceptualisation of strategic planning and organisational performance and b) a further, multivariate, examination of the relationship between strategic planning and performance, to capture the newly identified dimensionality. In addition to the previously identified strategic planning and organisational performance constructs, a comprehensive literature based assessment was undertaken and five main areas were identified for further examination, these were a) organisational b) comprehensive strategic choice, c) the quality of strategic options generated, d) political behavior and e) implementation success. From this, a conceptual model incorporating a set of hypotheses to be tested was formulated. In order to test the conceptual model specified and also the stated hypotheses, data gathering was undertaken. The quantitative phase of the research involved a mail survey of senior managers in medium to large UK based organisations, of which a total of 366 fully useable responses were received. Following rigorous individual construct validity and reliability testing, the complete conceptual model was tested using latent variable path analysis. The results for the individual hypotheses and also the complete conceptual model were most encouraging. The findings, theoretical and managerial implications, limitations and directions for future research are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis describes a study of the content and applicability of BS8800:1996 Guide to occupational health and safety management systems. The research is presented chronologically, with literature review and content analysis of SMS related guides and standards interwoven with two elements of qualitative empirical work. The first of these was carried out shortly after publication of BS8800 in 1996, a 'before-the-event' investigation of how organisations were intending to approach SMS implementation. The challenges faced by these organisations are reviewed against standard management theory, suggesting that the initial motivation for SMS implementation governs the approach organisations will adopt to guidance such as BS8800. The second phase of empirical work was undertaken in the context of OHSAS 18001, an auditable protocol based on BS8800, which allows organisations to certify their safety management systems. A discussion of the evolution of certifiable safety management system is presented, highlighting the similarities and differences between this, BS8800, SMS and wider management system standards. A case study then reviews the experiences of a catering company that implemented 18001, motivated by the opportunity for certification as a business benefit. The empirical work is used to comment on the guidance provided by BS8800, within its evolved role as guidance organisations may use for implementation of a SMS to be certified according to the specifications of OHSAS 18001. It is suggested that optimal implementation is facilitated by initial status review, continual improvement and the use of annexes, where there are used to make changes to the existing safety management system. This thesis concludes with a discussion of these elements, highlighting pertinent areas within BS8800 where revision or amendment may be appropriate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis investigates the role of accounting in planning and control in the Egyptian Iron and Steel Company "Hadisolb". The hypothesis is that there should be planning and control at appropriate levels, with a significant accounting involvement, In an organisation such as the Egyptian Iron and Steel Company "Hadisolb" . Part One of the thesis explains the role of accounting in planning and control, with special emphasis on its role in long-range corporate planning and control. Parts Two and Three review the history of the Egyptian Iron and Steel Company "Hadisolb", its organisation and structure, also the role of accounting in its planning and control arrangements, together with comments and criticisms concerning this. Part Four is mainly recommendations for alterations or improvements in planning and control in Hadisolb. This includes a suggested planning and organisation structure, physical and cost control reporting structures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this thesis, I view the historical background of Zimbabwe to show the patterns of traditional life that existed prior to settlerism. The form, nature, pace and impact of settlerism and colonialism up to the time of independence are also discussed to show how they affected the health of the population and the pace of development of the country. The political, social and economic underdevelopment of the African people that occurred in Zimbabwe prior to independence was a result of deliberate, politically motivated and controlled policy initiatives. These led to inequatable, inadequate, inappropriate and inaccessible health care provision. It is submitted that since it was the politics that determined the pace of underdevelopment, it must be the politics that must be at the forefront of the development strategy adopted. In the face of the amed conflict that existed in Zimbabwe, existing frameworks of analyses are shown to be inadequate for planning purposes because of their inability to provide indications about the stability of future outcomes. The Metagame technique of analysis of options is proposed as a methology that can be applied in such situations. It rejects deterministic predicative models as misleading and advocates an interactive model based on objective and subjective valuation of human behaviour. In conclusion, the search for stable outcomes rather than optimal and best solutions strategies is advocated in decision making in organisations of all sizes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The need for an adequate information system for the Highways Departments in the United Kingdom has been recognised by the report of a committee presented to the Minister of Transport in 1970, (The Marshall Report). This research aims to present a comprehensive information system on a sound theoretical basis which should enable the different levels of management to execute their work adequately. The suggested system presented in this research covers the different functions of the Highways Department, and presents a suggested solution for problems which may occur during the planning and controlling of work in the different locations of the Highways Department. The information system consists of:- 1. A coding system covering the cost units, cost centres and cost elements. 2. Cost accounting records for the cost units and cost centres. 3. A budgeting and budgetary control system covering, the different planning methods and procedures which are required for preparing the capital expenditure budget, the improvement and maintenance operation flexible budgets and programme of work, the plant budget, the administration budget, and the purchasing budget. 4. A reporting system which ensures that the different levels of management are receiving relevant and timely information. 5. The flow of documents which covers the relationship between the prime documents, the cost accounting records, budgets, reports and their relation to the different sections and offices within the department. A comprehensive cost units, cost centres, and cost elements codes together with a number of examples demonstrating the results of the survey, and examples of the application and procedures of the suggested information system have been illustrated separately as appendices. The emphasis is on the information required for internal control by management personnel within the County Council.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Manufacturing planning and control systems are fundamental to the successful operations of a manufacturing organisation. 10 order to improve their business performance, significant investment is made by companies into planning and control systems; however, not all companies realise the benefits sought Many companies continue to suffer from high levels of inventory, shortages, obsolete parts, poor resource utilisation and poor delivery performance. This thesis argues that the fit between the planning and control system and the manufacturing organisation is a crucial element of success. The design of appropriate control systems is, therefore, important. The different approaches to the design of manufacturing planning and control systems are investigated. It is concluded that there is no provision within these design methodologies to properly assess the impact of a proposed design on the manufacturing facility. Consequently, an understanding of how a new (or modified) planning and control system will perform in the context of the complete manufacturing system is unlikely to be gained until after the system has been implemented and is running. There are many modelling techniques available, however discrete-event simulation is unique in its ability to model the complex dynamics inherent in manufacturing systems, of which the planning and control system is an integral component. The existing application of simulation to manufacturing control system issues is limited: although operational issues are addressed, application to the more fundamental design of control systems is rarely, if at all, considered. The lack of a suitable simulation-based modelling tool does not help matters. The requirements of a simulation tool capable of modelling a host of different planning and control systems is presented. It is argued that only through the application of object-oriented principles can these extensive requirements be achieved. This thesis reports on the development of an extensible class library called WBS/Control, which is based on object-oriented principles and discrete-event simulation. The functionality, both current and future, offered by WBS/Control means that different planning and control systems can be modelled: not only the more standard implementations but also hybrid systems and new designs. The flexibility implicit in the development of WBS/Control supports its application to design and operational issues. WBS/Control wholly integrates with an existing manufacturing simulator to provide a more complete modelling environment.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT