907 resultados para Project process
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Cover title.
Resumo:
"MM Project nr. 8-101."
Resumo:
"Materials Central, Contract no. AF 33(616)-5878, Project no. 7351."
Resumo:
The Illinois Department of Transportation (IDOT) has initiated the Illinois Route 2 Phase I Study. The study will examine the transportation needs of and solutions for the corridor through an extensive public involvement process. The study area is located in Winnebago County, extending approximately 2.0 miles from north of Auburn Street on the south to north of Riverside Blvd. on the north, all within the City of Rockford, Illinois.
Resumo:
At head of title on cover: Environmental Impact Analysis Process.
Resumo:
September 1979.
Resumo:
Thesis (Master's)--University of Washington, 2016-06
Resumo:
A methodological framework for conducting a systematic, mostly qualitative, meta-synthesis of community-based rehabilitation (CBR) project evaluation reports is described. Developed in the course of an international pilot study, the framework proposes a systematic review process in phases which are strongly collaborative, methodologically rigorous and detailed. Through this suggested process, valuable descriptive data about CBR practice, strategies and outcomes may be synthesized. It is anticipated that future application of this methodology will contribute to an improved evidence base for CBR, which will facilitate the development of more appropriate policy and practice guidelines for disability service delivery in developing countries. The methodology will also have potential applications in areas beyond CBR, which are similarly. evidence poor' (lacking empirical research) but 'data rich' (with plentiful descriptive and evaluative reports).
Resumo:
This article reports of the papers present at the International Symposium 2006 'Shaping the future: connecting career development and workforce development'. The International Symposium 2006 provided an opportunity to move the project forward by considering career development in relation to the workforce development issues of human capital, labour supply, employability skills and older workers. In addition to these specific issues, it examined the broader issues of how career development services might contribute to workforce development and the career development information base needed to support public policy making. By way of background to this special issue on the International Symposium 2006, this paper briefly examines the context and the reasons behind career development's rise to a more prominent position on the public policy arena. Following this, the process of the International Symposium 2006 that resulted in the writing of the documents contained in the special issue are briefly outlined.
Resumo:
One of the challenges for software engineering is collecting meaningful data from industrial projects. Software process improvement depends on measurement to provide baseline status and confirming evidence of the effect of process changes. Without data, any conclusions rely on intuition and guessing. The Team Software ProcessSM (TSPSM) provides a powerful framework for data collection and analysis, in addition to its primary goal as a basis for highly effective software development. In this paper, we describe the experiences of, and benefits realized by, a team using the TSP for the first time. By reviewing how this particular team collected and used data, we show features of the TSP that make it a powerful foundation for software process improvement.
Resumo:
Geological sequestration of CO2 is a technically feasible and potentially economic option for significantly and safely reducing greenhouse gas emissions, with CO2 injection already practiced in Canada and the USA to enhance crude oil production. The Enhanced Coalbed Methane (ECBM) process is seen as the next most economical sequestration options. The authors estimate an incremental methane recovery factor from 20% to 50%, depending on coal rank and seam depth. Others have estimated the potential to increase worldwide CBM production, utilising ECBM, by 18 Trillion cubic meters, while simultaneously sequestering 345 Giga tonnes of CO2. This paper presents technical and economic factors to consider for developing a commercial ECBM project. Technical factors include: geostructural and hydrogeological issues, geochemical reactions, stressed and competitive sorption, counter-diffusion, effective and relative 4-D coal permeability and methane recovery levels. Key economic factors are injectant acquisition price, sale price of methane and the level of carbon credits.
Resumo:
Evidence supporting the efficacy of physical activity promotion in primary care settings has evaluated patient-level changes in physical activity, with little focus on the issue of general practitioner (GP) uptake. The 'GP Strategy' of 10,000 Steps Rockhampton provided an opportunity to explore this issue in the context of a multi-strategy, community-based physical activity intervention project. The 'GP Strategy' was developed in partnership with the Capricornia Division of General Practice. It aimed to: 1) increase GP awareness of the 10,000 Steps project, 2) upskill GPs in brief physical activity counselling techniques, and 3) provide GPs with evidencebased physical activity counselling materials and pedometers. The evaluation, which was guided by the RE-AIM evaluation framework, used a pre-post design, including a GP mailed survey, and collection of process data. Survey response rates were 67% (n=44/66; baseline) and 70% (n=37/53; 14-month follow-up). GP awareness of 10,000 Steps Rockhampton increased from 46% to 97%. 21/23 practices were visited by 10,000 Steps staff and accepted 10,000 Steps posters, brochures, and pedometers. At follow-up, 78% had displayed the poster, 81% were using the brochures, and 70% had loaned pedometers to patients. Despite the very high rate of uptake and use of 10,000 Steps materials, there was no change in the percentage of patients counselled, and relatively few pedometers had been loaned to patients. The results of this trial indicate that it will take more effort to change GP physical activity counselling behaviour, and provide only modest support for use of pedometers in the busy general practice setting. Acknowledgement:This project is supported by a grant from Health Promotion Queensland.
Resumo:
Recently, within the VISDEM project (EPSRC funded EP/C005848/1), a novel variational approximation framework has been developed for inference in partially observed, continuous space-time, diffusion processes. In this technical report all the derivations of the variational framework, from the initial work, are provided in detail to help the reader better understand the framework and its assumptions.