946 resultados para Financial Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Midwest Independent Transmission System Operator (MISO) has experienced significant amounts of wind power development within the last decade. The MISO footprint spans the majority of the upper Midwest region of the country, from the Dakotas to Indiana and as far east as Michigan. These areas have a rich wind energy resource. States in the MISO footprint have passed laws or set goals that require load serving entities to supply a portion of their load using renewable energy. In order to meet these requirements, significant investments are needed to build the transmission infrastructure necessary to deliver the power from these often remote wind energy resources to the load centers. This paper presents some of the transmission planning related work done at MISO which was largely influenced by current and future needs for increased wind power generation in the footprint. Specifically, topics covered are generator interconnection, long-term planning coordination, and cost-allocation for new transmission lines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the past few years, the Midwest ISO has experienced a surge in requests to interconnect large amounts of wind generation, driven largely by a favorable political environment and an abundant wind resource in the Midwestern US. This tremendous influx of proposed generators along with a highly constrained transmission system adversely impacted interconnection queue processing, resulting in an unmanageable backlog. Under these circumstances, Midwest ISO successfully reformed the interconnection tariff to improve cycle times and provide increased certainty to interconnection customers. One of the key features of the reformed queue process is the System Planning and Analysis (SPA) phase which allows integration of the interconnection studies with regional transmission planning. This paper presents a brief background of the queue reform effort and then delves deeply in to the work performed at the Midwest ISO during the first SPA cycle - the study approach, the challenges faced in having to study over 50,000 MWs of wind generation and the effective solutions designed to complete these studies within tariff timelines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Problem, research strategy, and findings: The privatization of airports in Australia included airport property development rights, regulated only by federal, not local, land use control. Airports then developed commercial and retail centers outside local community plans, resulting in a history of poor coordination of planning and reflecting strong differences between public and private values in the role of the airport. Private owners embraced the concept of an Airport City, envisioning the airport as a portal of global infrastructure, whereas public planning agencies are struggling with infrastructure coordination and the development of real estate outside of the local planning regulations. Stakeholder workshops were conducted in each of the cases where key stakeholders from airports, regulating agencies, state and local governments participated in identifying key issues impacting the planning in and around airports. This research demonstrates that if modes of infrastructure provision change significantly (such as through privatization of public services), that transformation would best be accompanied by comprehensive changes in planning regimes to accommodate metropolitan and airport interdependencies. Privatization has exacerbated the poor coordination of planning in the past, and a focus on coordination between public and private infrastructure planning is needed to overcome differences in values and interests. Takeaway for practice: Governance styles differ considerably between public agencies and private corporations. Planners should understand the drivers and value differences to better coordinate infrastructure delivery and effective planning. Research support: The Airport Metropolis Research Project under the Australian Research Council's Linkage Projects funding scheme (LP0775225).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the advent of large-scale wind farms and their integration into electrical grids, more uncertainties, constraints and objectives must be considered in power system development. It is therefore necessary to introduce risk-control strategies into the planning of transmission systems connected with wind power generators. This paper presents a probability-based multi-objective model equipped with three risk-control strategies. The model is developed to evaluate and enhance the ability of the transmission system to protect against overload risks when wind power is integrated into the power system. The model involves: (i) defining the uncertainties associated with wind power generators with probability measures and calculating the probabilistic power flow with the combined use of cumulants and Gram-Charlier series; (ii) developing three risk-control strategies by specifying the smallest acceptable non-overload probability for each branch and the whole system, and specifying the non-overload margin for all branches in the whole system; (iii) formulating an overload risk index based on the non-overload probability and the non-overload margin defined; and (iv) developing a multi-objective transmission system expansion planning (TSEP) model with the objective functions composed of transmission investment and the overload risk index. The presented work represents a superior risk-control model for TSEP in terms of security, reliability and economy. The transmission expansion planning model with the three risk-control strategies demonstrates its feasibility in the case study using two typical power systems

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The inner city Brisbane suburbs of the West End peninsula are poised for redevelopment. Located within walking distance to CBD workplaces, home to Queensland’s highest value cultural precinct, and high quality riverside parklands, there is currently a once-in-a-lifetime opportunity to redevelop parts of the suburb to create a truly urban neighbourhood. According to a local community association, local residents agree and embrace the concept of high-density living, but are opposed to the high-rise urban form (12 storeys) advocated by the City’s planning authority (BCC, 2011) and would prefer to see medium-rise (5-8 storeys) medium-density built form. Brisbane experienced a major flood event which inundated the peninsula suburbs of West End in summer January 2011. The vulnerability of taller buildings to the vagaries of climate and more extreme weather events and their reliance on main electricity was exposed when power outages immediately before, during and after the flood disaster seriously limited occupants’ access and egress when elevators were disabled. Not all buildings were flooded but dwellings quickly became unliveable due to disabled air-conditioning. Some tall buildings remained uninhabitable for several weeks after the event. This paper describes an innovative design research method applied to the complex problem of resilient, sustainable neighbourhood form in subtropical cities, in which a thorough comparative analysis of a range of multiple-dwelling types has revealed the impact that government policy regarding design of the physical environment has on a community’s resilience. The outcomes advocate the role of climate-responsive design in averting the rising human capital and financial costs of natural disasters and climate change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Precise protein quantification and recommendation is essential in clinical dietetics, particularly in the management of individuals with chronic kidney disease, malnutrition, burns, wounds, pressure ulcers, and those in active sports. The Expedited 10g Protein Counter (EP-10) was developed to simplify the quantification of dietary protein for assessment and recommendation of protein intake.1 Instead of using separate protein exchanges for different food groups to quantify the dietary protein intake of an individual, every exchange in the EP-10 accounts for an exchange each of 3g non-protein-rich food and 7g protein-rich food (Table 1). The EP-10 was recently validated and published in the Journal of Renal Nutrition recently.1 This study demonstrated that using the EP-10 for dietary protein intake quantification had clinically acceptable validity and reliability when compared with the conventional 7g protein exchange while requiring less time.2 In clinical practice, the use of efficient, accurate and practical methods to facilitate assessment and treatment plans is important. The EP-10 can be easily implemented in the nutrition assessment and recommendation for a patient in the clinical setting. This patient education tool was adapted from materials printed in the Journal of Renal Nutrition.1 The tool may be used as presented or adapted to assist patients to achieve their recommended daily protein intake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainable development has long been promoted as the best answer to the world’s environmental problems. This term has generated mass appeal as it implies that both the development of the built environment and its associated resource consumption can be achieved without jeopardising the natural environment. In the urban context, sustainability issues have been reflected in the promotion of sustainable urban development, which emphasises the sensible exploitation of scarce natural resources for urbanisation in a manner that allows future generations to repeat the process. This chapter highlights attempts to promote sustainable urban development through an integration of three important considerations: planning, development and the ecosystem. It highlights the fact that spatial planning processes were traditionally driven by economic and social objectives, and rarely involved promoting the sustainability agenda to achieve a sustainable urban future. As a result, rapid urbanisation has created a variety of pressures on the ecosystem upon which we rely. It is believed that the integration of the urban planning and development processes within the limitations of the ecosystem, monitored by a sustainability assessment mechanism, would offer a better approach to maintaining sustainable resource use without compromising urban development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, cities have shown increasing signs of environmental problems due to the negative impacts of urban activities. The degradation and depletion of natural resources, climate change, and development pressure on green areas have become major concerns for cities. In response to these problems, urban planning policies have shifted to a sustainable focus and authorities have begun to develop new strategies for improving the quality of urban ecosystems. An extremely important function of an urban ecosystem is to provide healthy and sustainable environments for both natural systems and communities. Therefore, ecological planning is a functional requirement in the establishment of sustainable built environment. With ecological planning, human needs are supplied while natural resources are used in the most effective and sustainable manner and ecological balance is sustained. Protecting human and environmental health, having healthy ecosystems, reducing environmental pollution and providing green spaces are just a few of the many benefits of ecological planning. In this context, this chapter briefly presents a short overview of the importance of the implementation of ecological planning into sustainable urban development. Furthermore, it presents a conceptual framework for a new methodology for developing sustainable urban ecosystems through ecological planning approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Social media and web 2.0 tools offer opportunities to devise novel participation strategies that can engage previously difficult to reach as well as new segments of society in urban planning. This paper examines participatory planning in the four local government areas of Brisbane City Council, Gold Coast City Council, Redland City Council, and Toowoomba Regional Council, all situated in South East Queensland, Australia. The paper discusses how social media and web 2.0 tools can deliver a more engaging planning experience to citizens, and investigates local government’s current use and receptiveness to social media tools for plan making and community engagement. The study’s research informed the development of criteria to assess the level of participation reached through the current use of social media and web 2.0 in the four local government areas. This resulted in an adaptation of the International Association for Public Participation (IAP2) Toolbox to integrate these new tools which is being presented to encourage further discussion and evaluation by planning professionals.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study contributes to the understanding of the contribution of financial reserves to sustaining nonprofit organisations. Recognising the limited recent Australian research in the area of nonprofit financial vulnerability, it specifically examines financial reserves held by signatories to the Code of Conduct of the Australian Council for International Development (ACFID) for the years 2006 to 2010. As this period includes the Global Financial Crisis, it presents a unique opportunity to observe the role of savings in a period of heightened financial threats to sustainability. The need for nonprofit entities to maintain reserves, while appearing intuitively evident, is neither unanimously accepted nor supported by established theoretic constructs. Some early frameworks attempt to explain the savings behaviour of nonprofit organisations and its role in organisational sustainability. Where researchers have considered the issue, its treatment has usually been either purely descriptive or alternatively, peripheral to a broader attempt to predict financial vulnerability. Given the importance of nonprofit entities to civil society, the sustainability of these organisations during times of economic contraction, such as the recent Global Financial Crisis, is a significant issue. Widespread failure of nonprofits, or even the perception of failure, will directly affect, not only those individuals who access their public goods and services, but would also have impacts on public confidence in both government and the sectors’ ability to manage and achieve their purpose. This study attempts to ‘shine a light’ on the paradox inherent in considering nonprofit savings. On the one hand, a public prevailing view is that nonprofit organisations should not hoard and indeed, should spend all of their funds on the direct achievement of their purposes. Against this, is the commonsense need for a financial buffer if only to allow for the day to day contingencies of pay rises and cost increases. At the entity level, the extent of reserves accumulated (or not) is an important consideration for Management Boards. The general public are also interested in knowing the level of funds held by nonprofits as a measure of both their commitment to purpose and as an indicator of their effectiveness. There is a need to communicate the level and prevalence of reserve holdings, balancing the prudent hedging of uncertainty against a sense of resource hoarding in the mind of donors. Finally, funders (especially governments) are interested in knowing the appropriate level of reserves to facilitate the ongoing sustainability of the sector. This is particularly so where organisations are involved in the provision of essential public goods and services. At a scholarly level, the study seeks to provide a rationale for this behaviour within the context of appropriate theory. At a practical level, the study seeks to give an indication of the drivers for savings, the actual levels of reserves held within the sector studied, as well as an indication as to whether the presence of reserves did mitigate the effects of financial turmoil during the Global Financial Crisis. The argument is not whether there is a need to ensure sustainability of nonprofits, but rather how it is to be done and whether the holding of reserves (net assets) is an essential element is achieving this. While the study offers no simple answers, it does appear that the organisations studied present as two groups, the ‘savers’ who build reserves and keep ‘money in the bank’ and ‘spender-delivers’ who put their resources ‘on the ground’. To progress an understanding of this dichotomy, the study suggests a need to move from its current approach to one which needs to more closely explore accounts based empirical donor attitude and nonprofit Management Board strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Modern healthcare managers are faced with pressure to deliver effective, efficient services within the context of fixed budget constraints. This requires decisions regarding the skill mix of the workforce particularly when staffing new services. One measure used to identify numbers and mix of staff in healthcare settings is workforce ratio. The aim of this study was to identify workforce ratios in nine allied health professions and to identify whether these measures are useful for planning allied health workforce requirements. Method: A systematic literature search using relevant MeSH headings of business, medical and allied health databases and relevant grey literature for the period 2000-2008 was undertaken. Results: Twelve articles were identified which described the use of workforce ratios in allied health services. Only one of these was a staffing ratio linked to clinical outcomes. The most comprehensive measures were identified in rehabilitation medicine. Conclusions: The evidence for use of staffing ratios for allied health practitioners is scarce and lags behind the fields of nursing and medicine.