944 resultados para Electric power systems-protection
Resumo:
Fault location has been studied deeply for transmission lines due to its importance in power systems. Nowadays the problem of fault location on distribution systems is receiving special attention mainly because of the power quality regulations. In this context, this paper presents an application software developed in Matlabtrade that automatically calculates the location of a fault in a distribution power system, starting from voltages and currents measured at the line terminal and the model of the distribution power system data. The application is based on a N-ary tree structure, which is suitable to be used in this application due to the highly branched and the non- homogeneity nature of the distribution systems, and has been developed for single-phase, two-phase, two-phase-to-ground, and three-phase faults. The implemented application is tested by using fault data in a real electrical distribution power system
Resumo:
This paper presents an approach for probabilistic analysis of unbalanced three-phase weakly meshed distribution systems considering uncertainty in load demand. In order to achieve high computational efficiency this approach uses both an efficient method for probabilistic analysis and a radial power flow. The probabilistic approach used is the well-known Two-Point Estimate Method. Meanwhile, the compensation-based radial power flow is used in order to extract benefits from the topological characteristics of the distribution systems. The generation model proposed allows modeling either PQ or PV bus on the connection point between the network and the distributed generator. In addition allows control of the generator operating conditions, such as the field current and the power delivery at terminals. Results on test with IEEE 37 bus system is given to illustrate the operation and effectiveness of the proposed approach. A Monte Carlo Simulations method is used to validate the results. © 2011 IEEE.
Resumo:
This article aims to present proposals for improvement of key standards and resolutions concerned about the methodology for calculating the indicator of total harmonic voltage distortion, and should contribute to the process of examining the compatibility of potentially disturbing loads in electric power quality in distribution systems. These proposals were drawn from the analysis of results from measurement campaigns conducted in a case study including analysis of the connection of a new induction furnace in a foundry served by a distributor of São Paulo state. A general historical situating the quality of electric energy in the electricity sector is presented, and methodological guidelines and procedures used in experimental trials are shown. The analysis and discussion of results are prepared to answer the main questions that arise during the implementation of standards, resolutions and procedures. © 2011 IEEE.
Resumo:
Distributed Generation, microgrid technologies, two-way communication systems, and demand response programs are issues that are being studied in recent years within the concept of smart grids. At some level of enough penetration, the Distributed Generators (DGs) can provide benefits for sub-transmission and transmission systems through the so-called ancillary services. This work is focused on the ancillary service of reactive power support provided by DGs, specifically Wind Turbine Generators (WTGs), with high level of impact on transmission systems. The main objective of this work is to propose an optimization methodology to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). LOC occur when more reactive power is required than available, and the active power generation has to be reduced in order to increase the reactive power capacity. In the optimization process, three objectives are considered: active power generation costs of DGs, voltage stability margin of the system, and losses in the lines of the network. Uncertainties of WTGs are reduced solving multi-objective optimal power flows in multiple probabilistic scenarios constructed by Monte Carlo simulations, and modeling the time series associated with the active power generation of each WTG via Fuzzy Logic and Markov Chains. The proposed methodology was tested using the IEEE 14 bus test system with two WTGs installed. © 2011 IEEE.
Resumo:
Grant R803971.
Resumo:
Cover title: Separate evaluations of electrogasdynamic (EGD) power generation.
Resumo:
Mode of access: Internet.
Resumo:
The simulation of a power system such as the More Electric Aircraft is a complex problem. There are conflicting requirements of the simulation, for example in order to reduce simulation run-times, power ratings that need to be established over long periods of the flight can be calculated using a fairly coarse model, whereas power quality is established over relatively short periods with a detailed model. An important issue is to establish the requirements of the simulation work at an early stage. This paper describes the modelling and simulation strategy adopted for the UK TIMES project, which is looking into the optimisation of the More Electric Aircraft from a system level. Essentially four main requirements of the simulation work have been identified, resulting in four different types of simulation. Each of the simulations is described along with preliminary models and results.
Resumo:
To examine the detailed operation of the power distribution network in a future more electric aircraft that employs electric actuation systems, a Micro-Cap SPICE simulation is developed for one of the essential buses. Particular attention is paid to model accurately the most important effects that influence system power quality. Representative system and flight data are used to illustrate the operation of the simulation and to assess the power quality conditions within the network as the flight control surfaces are deployed. The results illustrate the importance of correct cable sizing to ensure stable operation of actuators during transient conditions.
Resumo:
Two different fuzzy approaches to voltage control in electric power distribution systems are introduced in this paper. The real-time controller in each case would act on power transformers equipped with under-load tap changers. Learning systems are employed to turn the voltage-control relays into adaptive devices. The scope of this study has been limited to the power distribution substation, and the voltage measurements and control actions are carried out on the secondary bus. The capacity of fuzzy systems to handle approximate data, together with their unique ability to interpret qualitative information, make it possible to design voltage-control strategies that satisfy the requirements of the Brazilian regulatory bodies and the real concerns of the electric power distribution companies. Fuzzy control systems based on these two strategies have been implemented and the test results were highly satisfactory.
Resumo:
A fuzzy control strategy for voltage regulation in electric power distribution systems is introduced in this article. This real-time controller would act on power transformers equipped with under-load tap changers. The fuzzy system was employed to turn the voltage-control relays into adaptive devices. The scope of the present study has been limited to the power distribution substation, and both the voltage measurements and control actions are carried out on the secondary bus. The capacity of fuzzy systems to handle approximate data, together with their unique ability to interpret qualitative information, make it possible to design voltage control strategies that satisfy both the requirements of the Brazilian regulatory bodies and the real concerns of the electric power distribution companies. A prototype based on the fuzzy control strategy proposed in this paper has also been implemented for validation purposes and its experimental results were highly satisfactory.
Resumo:
This letter presents an extension of an existing ground distance relay algorithm to include phase distance relays. The algorithm uses a fault resistance estimation process in the phase domain, improving efficiency in the distance protection process. The results show that the algorithm is suitable for online applications, and that it has an independent performance from the fault resistance magnitude, the fault location, and the line asymmetry.
Resumo:
An algorithm inspired on ant behavior is developed in order to find out the topology of an electric energy distribution network with minimum power loss. The algorithm performance is investigated in hypothetical and actual circuits. When applied in an actual distribution system of a region of the State of Sao Paulo (Brazil), the solution found by the algorithm presents loss lower than the topology built by the concessionary company.
Resumo:
A transient analysis for two full-power converter wind turbines equipped with a permanent magnet synchronous generator is studied in this article, taking into consideration, as a new contribution to earlier studies, a pitch control malfunction. The two full-power converters considered are, respectively, a two-level and a multi-level converter. Moreover, a novel control strategy based on fractional-order controllers for wind turbines is studied. Simulation results are presented; conclusions are in favor of the novel control strategy, improving the quality of the energy injected into the electric grid.
Resumo:
A concepção de instalações eléctricas deve garantir condições de segurança para as pessoas e equipamentos. Para tal é exigida, quer por força de regulamentação ou de normalização, a instalação de dispositivos que garantam a detecção e a protecção contra os defeitos mais comuns nas instalações eléctricas como, por exemplo, as sobreintensidades e as sobretensões. Susceptíveis de criar sobretensões perigosas nas instalações eléctricas, as descargas atmosféricas podem ainda causar danos estruturais elevados, o que, em algumas actividades económicas, torna fundamental a implementação de medidas de protecção contra este fenómeno natural. A protecção contra descargas atmosféricas directas consiste em identificar as vulnerabilidades das estruturas e, nesses locais, implementar dispositivos de captura, direccionamento e escoamento da descarga atmosférica à terra, em condições de segurança. O presente trabalho, desenvolvido no âmbito da dissertação de Mestrado em Engenharia Electrotécnica, visa desenvolver e implementar uma ferramenta computacional, baseada em programas de desenho assistido por computador (CAD) de utilização corrente na área de projecto de arquitectura e de engenharia, que permita, no âmbito de normas internacionais, a análise e implementação de sistemas de protecção em edifícios contra descargas atmosféricas de uma forma rápida e expedita. Baseado num programa CAD 3D, que permite a modelização tridimensional das estruturas a proteger, a ferramenta desenvolvida tentará identificar as suas vulnerabilidades das estruturas às descargas atmosféricas directas, com o intuito de implementar as medidas de protecção mais adequadas do ponto de vista técnico económico. Prevê-se que a ferramenta resultante deste estudo, o Simulador do Modelo Electrogeométrico (SIMODEL), possibilite aos projectistas e particularmente aos alunos das unidades curriculares na área do projecto de instalações eléctricas da Área Departamental de Engenharia de Sistemas e Potencia e Automação (ADESPA) do ISEL, estudar e implementar sistemas de protecção contra descargas atmosféricas (SPDA) baseados na normalização internacional do CENELEC e da IEC, nomeadamente as normas da série 62305.