913 resultados para Drilling process monitoring
Resumo:
To address concerns expressed about the possible effect of drilling mud discharges on shallow, low-energy estuarine ecosystems, a 12 month study was designed to detect alterations in water quality and sediment geochemistry. Each drilling mud used in the study and sediments from the study site were analyzed in the laboratory for chemical and physical characteristics. Potential water quality impacts were simulated by the EPA-COE elutriation test procedure. Mud toxicity was measured by acute and chronic bioassays with Mysidopsis bahia, Mercenaria mercenaria, and Nereis virens.^ For the field study, a relatively pristine, shallow (1.2 m) estuary (Christmas Bay, TX) without any drilling activity for the last 30 years was chosen for the study site. After a three month baseline study, three stations were selected. Station 1 was an external control. At each treatment station (2, 3), mesocosms were constructed to enclose a 3.5 m$\sp3$ water column. Each treatment station included an internal control site also. Each in situ mesocosm, except the controls, was successively dosed at a mesocosm-specific dose (1:100; 1:1,000; or 1:10,000 v/v) with 4 field collected drilling muds (spud, nondispersed, lightly-treated, and heavily-treated lignosulfonate) in sequential order over 1.5 months. Twenty-four hours after each dose, water exchange was allowed until the next treatment. Station 3 was destroyed by a winter storm. After the last treatment, the enclosures were removed and the remaining sites monitored for 6 months. One additional site was similarly dosed (1:100 v/v) with clean dredged sediment from Christmas Bay for comparison between dredged sediments and drilling muds.^ Results of the analysis of the water samples and field measurements showed that water quality was impacted during the discharges, primarily at the highest dose (1:100 v/v), but that elevated levels of C, Cr (T,F), Cr$\sp{+3}$ (T, F), N, Pb, and Zn returned to ambient levels before the end of the 24 hour exposure period or immediately after water exchange was allowed (Al, Ba(T), Chlorophyll ABC, SS, %T). Barium, from the barite, was used as a geochemical tracer in the sediments to confirm estimated doses by mass balance calculations. Barium reached a maximum of 166x background levels at the high dose mesocosm. Barium levels returned to ambient or only slightly elevated levels at the end of the 6 month monitoring period due to sediment deposition, resuspension, and bioturbation. QA/QC results using blind samples consisting of lab standards and spiked samples for both water and sediment matrices were within acceptable coefficients of variation.^ In order to avoid impacts on water quality and sediment geochemistry in a shallow estuarine ecosystem, this study concluded that a minimal dilution of 1:1,000 (v/v) would be required in addition to existing regulatory constraints. ^
Resumo:
We report on the EPICA Dronning Maud Land (East Antarctica) deep drilling operation. Starting with the scientific questions that led to the outline of the EPICA project, we introduce the setting of sister drillings at NorthGRIP and EPICA Dome C within the European ice-coring community. The progress of the drilling operation is described within the context of three parallel, deep-drilling operations, the problems that occurred and the solutions we developed. Modified procedures are described, such as the monitoring of penetration rate via cable weight rather than motor torque, and modifications to the system (e.g. closing the openings at the lower end of the outer barrel to reduce the risk of immersing the drill in highly concentrated chip suspension). Parameters of the drilling (e.g. core-break force, cutter pitch, chips balance, liquid level, core production rate and piece number) are discussed. We also review the operational mode, particularly in the context of achieved core length and piece length, which have to be optimized for drilling efficiency and core quality respectively. We conclude with recommendations addressing the design of the chip-collection openings and strictly limiting the cable-load drop with respect to the load at the start of the run.
Resumo:
The Leg 104 organic geochemistry program consisted of monitoring (a) hydrocarbon gases, (b) organic and inorganic carbon, and (c) parameters resulting from Rock-Eval pyrolysis at three sites on the Voring Plateau. The results amplify some of those obtained earlier on Deep Sea Drilling Project (DSDP) Leg 38. In a regional sense there is an inverse correlation between amounts of hydrocarbon gas and organic carbon. For example, significant concentrations of methane are present only at Site 644 in the inner part of the plateau where organic carbon contents are always less than 1%; in contrast, at Site 642 on the outer plateau, methane concentrations are very low (ppm range) whereas amounts of organic carbon approach 2%. Only at Site 644 are the environmental conditions such that methanogenesis is an active diagenetic process. Because of the importance of routine gas analyses to the Ocean Drilling Program (ODP), a procedure was devised to improve the use of Vacutainers for collection of gas samples. Comparison of methods for determining organic carbon showed that at Sites 643 and 644 Rock-Eval TOC could be used as a measure of organic carbon, but not at Site 642. Although no liquid or solid hydrocarbons were encountered at any of the sites, a catalog of potential organic geochemical contaminants was developed in anticipation of such a discovery.