869 resultados para Demanda de energia elétrica
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
This study aims to prove the economic feasibility of the installation of mechanical compression chillers on plastic injection molding machines in order to reduce the production cycle time of toothbrush cables in a specific case study. This evidence was confirmed by the comparative analysis of the system replaced and the new system installed. The old system had only one closed loop cooling tower which pumped chilled water to the injection molds, and the new system has the same tower sending cold water to the condensers of individual chillers installed on each injection machine. We conducted an analysis of energy efficiency in each system, showing that in terms of thermal efficiency virtually nothing has changed, but in terms of electricity demand the new system consumes 60.3 kW more. We conducted an analysis of machine productivity for both systems, showing a much higher productivity of the new system due to reduced cycle times caused by the presence of chillers and their greater cooling capacities. Equipped with data such as electricity rates, increases in operating costs and initial investments, the increase in consumption and demand of electricity plus the cycle time reduction were also calculated over so the simple payback 1 year and 2 months was reached
Comissionamento de turbinas hidráulicas: ensaios de faixa operativa, índex, test e rejeição de carga
Resumo:
With growing electricty demand, the importance of generation through hydropower, a renewable energy source, it’s of great importance. This demand derives from the country’s growth, as well as events that will occur in the coming years. The commission has a crucial role before the entry into operation of hydroelectric plant, sice, ensures a good operation of hydraulic and electrical systems, as well as the safety of the installation. This paper is a case study, commissioning in a PCH in especially the most important tests, such as range operation, índex tes and load rejection. In these trials we can get a Idea of the actual behavior of the unit, as well as future operation maneuvers, and evidence of real efficiency
Resumo:
With the increasing demand for electricity, the retraining of transmission lines is necessary despite environmental restrictions and crossings in densely populated areas to build new transmission and distribution lines. Solution is reuse the existent cables, replacing the old conductor cables for new cables with higher capacity power transmission, and control of sag installed. The increasing demand for electrical power has increased the electric current on the wires and therefore, it must bear out temperatures of 150°C or more, without the risk of the increasing sag beyond the established limits. In the case of long crossings or densely populated areas, sag is due to high weight of the cable on clearance. The cable type determines the weight, sag, height and the towers dimensions, which are the items that most influence the investment of the transmission line. Hence, to reduce both cost of investment and maintenance of the line, the use of a lighter cable can reduce both number and the height of the towers, with financial return on short and long term. Therefore, in order to increase the amount of transmitted energy and reduce the number of built towers and sag, is recommended in the current work substitute the current core material (steel or aluminium) for alternatives alloys or new materials, in this case a composite, which has low density, elevated stiffness (elasticity module), thus apply the pultruded carbon fiber with epoxy resin as matrix systems and perform the study of the kinetics of degradation by thermogravimetric analysis (TGA), dynamic mechanical analysis (DMA) and differential scanning calorimetry (DSC), according to their respective standards
Resumo:
The crescent increasing demand of the electric power in Brazil has stimulated the implantation of Small Central Hydroelectric Power (SCHP) in several regions of the country. However, the silting up of the reservoirs is one of the main problems faced by hydroelectric power plants and SCHP. In this context, this research aimed evaluate the phenomenology and propose the enforcement of appropriate bioengineering techniques to control the intense erosive process of the hydrographical basin of the “Alto Rio Sucuriú,” that cause silting up of the reservoirs of the SCHP Costa Rica, located in the municipal district of Costa Rica (MS). In order to identify the phenomenology of the main falling in of this basin, a diagnosis of the conditions of the physical environment of the region (climate, geology, pedology, hydrology, and use of the ground) was realized. A surveying was also realized to specify the geometric feature of the falling in using the Total Station of the Ruide brand, series RTS 860R and the geodetic GPS of the Ashtech brand and the data obtained was used on the preparation of the Digital Elevation Model (DEM) of the falling in. Based on this diagnosis an official register of the falling in was done with identification of the different types of present erosion. Due to the advanced erosive stage of the falling in researched, the use of bioengineering techniques could be the best solution considering that the traditional engineering techniques make use of heavy material like concrete, iron and large machines that besides causing higher impact to the natural and esthetic aspects of the environment also require a higher investment of capital. This research establish a great cooperation to the knowledge of the erosive process and of the rehabilitation of the degraded areas with application of bioengineering techniques not only hydrographical basin of “Alto Rio Sucuriú” but also to other basins that show similar situation
Resumo:
The growing demand for electricity in Brazil has stimulated the implementation of Small Hydro Power (PCH) in various regions of the country. However, the silting of reservoirs is a major problem faced by power plants and power plants. In this context, this study aimed to evaluate the data hydrosedimentological strategic points of the watershed of the Alto Rio Sucuriú (MS) to identify the possible causes siltation of the reservoir PCH Costa Rica and suggest mitigation measures. Hydrosedimentological surveys were conducted during the rainy season (February / March 2012) and drought (August 2012), and obtained data flow, discharge liquid, suspended solids and bottom and organic matter content. Based on these results it was determined that the points 2, 4, 7 and 9 are the largest contributors to sedimentation, and point 4 got most liquid discharge (38,20 m3s-1), point 7 largest discharge of solid suspension (906,3 mg L-1), points 2 and 4 major discharges solid totals (231,59 t dia-1 and 238,185 t dia-1 respectively) and point 9 higher organic matter content (22,18%) . Found greater fraction of fine sand and very fine suspended solids and solid medium sand in the background. As mitigation measures for the process of silting of the reservoir PCH Costa Rica (MS) highlights the orientation of landowners in adopting conservation measures and planting of leguminous species native to the region in symbiosis with nitrogen-fixing bacteria
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
The increasing demand in electricity and decrease forecast, increasingly, of fossil fuel reserves, as well as increasing environmental concern in the use of these have generated a concern about the quality of electricity generation, making it well welcome new investments in generation through alternative, clean and renewable sources. Distributed generation is one of the main solutions for the independent and selfsufficient generating systems, such as the sugarcane industry. This sector has grown considerably, contributing expressively in the production of electricity to the distribution networks. Faced with this situation, one of the main objectives of this study is to propose the implementation of an algorithm to detect islanding disturbances in the electrical system, characterized by situations of under- or overvoltage. The algorithm should also commonly quantize the time that the system was operating in these conditions, to check the possible consequences that will be caused in the electric power system. In order to achieve this it used the technique of wavelet multiresolution analysis (AMR) for detecting the generated disorders. The data obtained can be processed so as to be used for a possible predictive maintenance in the protection equipment of electrical network, since they are prone to damage on prolonged operation under abnormal conditions of frequency and voltage.
Resumo:
Esse caderno é fruto de uma parceria entre a FGV Energia e a Catavento, que somaram esforços no intuito de estimular um novo olhar sobre os dilemas enfrentados no setor de energia no Brasil. Alimentar o debate em torno de questões primordiais, que afetam tanto as possibilidades de expansão das fontes de energia, quanto o papel da demanda, em um contexto de uso eficiente de recursos naturais e restrições crescentes às emissões de gases de efeito estufa, é a premissa desse trabalho.
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
O ano de 2012 foi um marco para o setor elétrico brasileiro. Foi um ano de muitas surpresas, debates e mudanças de paradigmas. Um setor tido anteriormente como exemplo de estabilidade e conservadorismo, passou a ser alvo de dúvidas e críticas por parte de diferentes agentes, investidores, operadores, consumidores e governantes. As bases regulatórias do setor elétrico brasileiro são muito recentes. Entretanto é notável que houve um progresso nas últimas décadas, em direção a um melhor serviço prestado à população e ao desenvolvimento de um ambiente propício ao investimento. Ambos os objetivos foram acompanhados de uma maior preocupação com o atendimento da demanda por energia, crescente no país, e com a busca por tarifas baixas de forma a não haver impactos inflacionários. Desviando desta trajetória, a edição da MP 579 em setembro de 2012 levou a um clima de insegurança para novos investimentos devido à falta de clareza a cerca de muitas regras sancionadas, consequencia do insuficiente debate com o setor privado. A MP teve como ambição diminuir a tarifa de energia paga pelo consumidor final, e usou como principal mecanismo a não renovação das concessões de geração de energia, possibilidade prevista nos contratos de concessão de cada usina de geração de energia. Esta tese faz uma análise do setor de geração energia do Brasil. Nela é estudada a matriz energética, aspectos do modelo regulatório adotado, sua evolução nas últimas décadas, e a motivação para a sanção da MP. O objetivo central é estudar seu impacto nos investimentos no setor.
Resumo:
Atualmente há uma grande preocupação em relação a substituição das fontes não renováveis pelas fontes renováveis na geração de energia elétrica. Isto ocorre devido a limitação do modelo tradicional e da crescente demanda. Com o desenvolvimento dos conversores de potência e a eficácia dos esquemas de controle, as fontes renováveis têm sido interligadas na rede elétrica, em um modelo de geração distribuída. Neste sentido, este trabalho apresenta uma estratégia de controle não convencional, com a utilização de um controlador robusto, para a interconexão de sistemas fotovoltaicos com à rede elétrica trifásica. A compensação da qualidade de energia no ponto de acoplamento comum (PAC) é realizada pela estratégia proposta. As técnicas tradicionais utilizam detecção de harmônicos, já neste trabalho o controle das correntes é feita de uma forma indireta sem a necessidade desta detecção. Na estratégia indireta é de grande importância que o controle da tensão do barramento CC seja efetuado de uma forma que não haja grandes flutuações, e que a banda passante do controlador em regime permanente seja baixa para que as correntes da rede não tenham um alto THD. Por este motivo é utilizado um controlador em modo dual DSM-PI, que durante o transitório se comporta como um controlador em modo deslizante SM-PI, e em regime se comporta como um PI convencional. A corrente é alinhada ao ângulo de fase do vetor tensão da rede elétrica, obtido a partir do uso de um PLL. Esta aproximação permite regular o fluxo de potência ativa, juntamente com a compensação dos harmônicos e também promover a correção do fator de potência no ponto de acoplamento comum. Para o controle das correntes é usado um controlador dupla sequencia, que utiliza o princípio do modelo interno. Resultados de simulação são apresentados para demonstrar a eficácia do sistema de controle proposto
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Economia - FCLAR