788 resultados para Construction industry Management Computer programs


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study explores the special characteristics of the construction industry and develops a maturity model for measuring and improving the relationships between the key players of a construction supply chain. The model adopts the capability maturity methodology and defines four maturity levels of construction supply chain relationships. It is in a matrix format, consisting of 24 assessment criteria in eight categories at each maturity level. It also provides three different ways of using the model. The model is evaluated through a series of expert interviews. A case study is also presented to demonstrate the application of this model in practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.

Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.

Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.

Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.

Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.

Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been an increasing highlight of supply chain collaboration in UK construction. However, few studies have provided evidence for the current status. Based on the analysis of over 100 questionnaire responses in this research, it is found that the UK construction industry as a whole is experiencing an important change and moving towards supply chain collaboration. On the other hand, an unbalance is found for the change movement. In addition to the questionnaire survey, a series of expert interviews help to explore the specific characteristics of supply chain collaboration in construction and provide practical implications for collaboration strategy implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: This paper investigates the link between two knowledge areas that have not been previously linked conceptually; stakeholder management and corporate culture. Focussing on the UK Construction Industry, the research study demonstrates mutual dependency of each of these areas on the other and establishes a theoretical framework with real potential to impact positively upon industry.

Design/methodology/approach: The study utilises both qualitative and quantitative data collection and then analysis to produce results contributing to the final framework. Semi-structured interviews were used and analysed through a cognitive mapping procedure. The result of this stage, set in the context of previous research, facilitated a questionnaire to be developed which helped gather quantitative values from a larger sample to enhance the final framework.

Findings: The data suggests that stakeholder management and corporate culture are key areas of an organisation’s success, and that this importance will only grow in future. A clearly identifiable relationship was established between the two theoretical areas and a framework developed and quantified.

Originality/value: It is evident that change is needed within the UK Construction Industry. Companies must employ ethical and social stakeholder management and manage their corporate culture like any other aspect of their business. Successfully doing this will lead to more successful projects, better reputation and survival. The findings of this project begin to show how change may occur and how companies might intentionally deploy advantageous configurations of corporate culture and stakeholder management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.


Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.

Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.


Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The mining/quarrying industry is a sector of industry where there are very few Life Cycle Assessment (LCA) tools, and where the role of LCA has been poorly investigated. A key issue is the integration of three inter-dependent life cycles: Project, Asset and Product. Given the unique features of mining LCAs, this Note from the Field presents a common methodology implemented within the Sustainable Aggregates Resource Management (SARMa) Project (www.sarmaproject.eu) in order to boost adoption of LCA in the aggregate industry in South Eastern Europe. The proposed methodology emphasises the importance of resource efficiency and recycling in the context of a Sustainable Supply Mix of aggregates for the construction industry. Through its adoption, aggregate producers, recyclers, and governmental planners would gain confidence with LCA tools and conduct consistent and meaningful life cycle analyses of natural and recycled aggregates. © 2011 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil Especialização em Edificações

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho de Projeto

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study compared the relative effectiveness of two computerized remedial reading programs in improving the reading word recognition, rate, and comprehension of adolescent readers demonstrating significant and longstanding reading difficulties. One of the programs involved was Autoskill Component Reading Subskills Program, which provides instruction in isolated letters, syllables, and words, to a point of rapid automatic responding. This program also incorporates reading disability subtypes in its approach. The second program, Read It Again. Sam, delivers a repeated reading strategy. The study also examined the feasibility of using peer tutors in association with these two programs. Grade 9 students at a secondary vocational school who satisfied specific criteria with respect to cognitive and reading ability participated. Eighteen students were randomly assigned to three matched groups, based on prior screening on a battery of reading achievement tests. Two I I groups received training with one of the computer programs; the third group acted as a control and received the remedial reading program offered within the regular classroom. The groups met daily with a trained tutor for approximately 35 minutes, and were required to accumulate twenty hours of instruction. At the conclusion of the program, the pretest battery was repeated. No significant differences were found in the treatment effects of the two computer groups. Each of the two treatment groups was able to effect significantly improved reading word recognition and rate, relative to the control group. Comprehension gains were modest. The treatment groups demonstrated a significant gain, relative to the control group, on one of the three comprehension measures; only trends toward a gain were noted on the remaining two measures. The tutoring partnership appeared to be a viable alternative for the teacher seeking to provide individualized computerized remedial programs for adolescent unskilled readers. Both programs took advantage of computer technology in providing individualized drill and practice, instant feedback, and ongoing recordkeeping. With limited cautions, each of these programs was considered effective and practical for use with adolescent unskilled readers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objectif principal: Il n’est pas démontré que les interventions visant à maîtriser voire modérer la médicamentation de patients atteints d’hypertension peuvent améliorer leur gestion de la maladie. Cette revue systématique propose d’évaluer les programmes de gestion contrôlée de la médicamentation pour l’hypertension, en s’appuyant sur la mesure de l’observance des traitements par les patients (CMGM). Design: Revue systématique. Sources de données: MEDLINE, EMBASE, CENTRAL, résumés de conférences internationales sur l’hypertension et bibliographies des articles pertinents. Méthodes: Des essais contrôlés randomisés (ECR) et des études observationnelles (EO) ont été évalués par 2 réviseurs indépendants. L’évaluation de la qualité (de ce matériel) a été réalisée avec l’aide de l’outil de Cochrane de mesure du risque de biais, et a été estimée selon une échelle à quatre niveaux de qualité Une synthèse narrative des données a été effectuée en raison de l'hétérogénéité importante des études. Résultats: 13 études (8 ECR, 5 EO) de 2150 patients hypertendus ont été prises en compte. Parmi elles, 5 études de CMGM avec l’utilisation de dispositifs électroniques comme seule intervention ont relevé une diminution de la tension artérielle (TA), qui pourrait cependant être expliquée par les biais de mesure. L’amélioration à court terme de la TA sous CMGM dans les interventions complexes a été révélée dans 4 études à qualité faible ou modérée. Dans 4 autres études sur les soins intégrés de qualité supérieure, il n'a pas été possible de distinguer l'impact de la composante CMGM, celle-ci pouvant être compromise par des traitements médicamenteux. L’ensemble des études semble par ailleurs montrer qu’un feed-back régulier au médecin traitant peut être un élément essentiel d’efficacité des traitements CMGM, et peut être facilement assuré par une infirmière ou un pharmacien, grâce à des outils de communication appropriés. Conclusions: Aucune preuve convaincante de l'efficacité des traitements CMGM comme technologie de la santé n’a été établie en raison de designs non-optimaux des études identifiées et des ualités méthodologiques insatisfaisantes de celles-ci. Les recherches futures devraient : suivre les normes de qualité approuvées et les recommandations cliniques actuelles pour le traitement de l'hypertension, inclure des groupes spécifiques de patients avec des problèmes d’attachement aux traitements, et considérer les résultats cliniques et économiques de l'organisation de soins ainsi que les observations rapportées par les patients.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os Sistemas de Informação têm influenciado a vida quotidiana a um ritmo inesperado e com mudanças significativas na setor da construção, cuja importância é crucial para a economia de qualquer país. Sendo Angola, um país de economia emergente, caracterizado por um mercado em expansão e reestruturação, onde as decisões de Sistema Informação ainda são tomadas de forma isolada, e cada vez mais investidores estão a atuar no país, impulsionando o crescimento, é imperioso para o sector a identificação e exploração de Sistemas de Informação flexíveis e adaptáveis para fazer face as forças competitivas do setor. Partindo desta envolvente a presente dissertação visa ressaltar o reconhecimento da importância do Planeamento Estratégico de Sistemas de Informação-PESI para as organizações atuais. Neste contexto realizou-se o estudo de PESI em torno de um caso concreto numa Pequena Media Empresa, Angolana, a Terponte,SA, cujo objectivo é fornecer a construtora um plano em termos de SI para futuro. Os dados foram recolhidos através da utilização dos métodos qualitativos e quantitativos, sendo os mais pertinentes a análise documental, observação direta, entrevistas, questionários aos órgãos da empresa em estudo e demais intuições. A análise dos dados demonstrou uma deficiente gestão da informação, bem como inexistência de integração aplicacional. A presente dissertação pretende contribuir para o avanço do conhecimento científico no domínio do Planeamento Estratégico dos Sistemas de Informação e para a resolução de problemas específicos nomeadamente nas empresas do setor da construção civil.