976 resultados para Accuracy of Hotel Feasibility Study Projections
Resumo:
At head of title: Volume I.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Figure eight format for driver collision response data collection - feasibility study. Final report.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Federal Highway Administration, Office of Research and Development, Washington, D.C.
Resumo:
Federal Highway Administration, Office of Research and Development, Washington, D.C.
Resumo:
"April 1977."
Resumo:
"Other issues of this report may bear the number BAW-7."
Resumo:
"An investigation conducted by Acurex Corporation, Mountain View, CA, sponsored by Naval Facilities Engineering Command"--Cover.
Resumo:
[1] Skylounge Project final report.--[2] Skylounge legal, technical, and financial supplementary study.
Resumo:
Mode of access: Internet.
Resumo:
Bibliography: p. 57-59.
Resumo:
"The diagnostic-feasibility study of Baumann Park Lake was provided by Conservation 2000 funds through the Illinois Environmental Protection Agency."
Resumo:
"Project no. 60.057."
Resumo:
"21 February 1991"--V. 1.
Resumo:
Prepared for the Institute of Natural Resources by John Bishop in cooperation with the Dept. of Local Government Affairs and Illinois Environmental Protection Agency.