823 resultados para probabilistic risk assessment
Resumo:
This paper reviews the literature of construction risk modelling and assessment. It also reviews the real practice of risk assessment. The review resulted in significant results, summarised as follows. There has been a major shift in risk perception from an estimation variance into a project attribute. Although the Probability–Impact risk model is prevailing, substantial efforts are being put to improving it reflecting the increasing complexity of construction projects. The literature lacks a comprehensive assessment approach capable of capturing risk impact on different project objectives. Obtaining a realistic project risk level demands an effective mechanism for aggregating individual risk assessments. The various assessment tools suffer from low take-up; professionals typically rely on their experience. It is concluded that a simple analytical tool that uses risk cost as a common scale and utilises professional experience could be a viable option to facilitate closing the gap between theory and practice of risk assessment.
Resumo:
The Short Term Assessment of Risk and Treatability is a structured judgement tool used to inform risk estimation for multiple adverse outcomes. In research, risk estimates outperform the tool's strength and vulnerability scales for violence prediction. Little is known about what its’component parts contribute to the assignment of risk estimates and how those estimates fare in prediction of non-violent adverse outcomes compared with the structured components. START assessment and outcomes data from a secure mental health service (N=84) was collected. Binomial and multinomial regression analyses determined the contribution of selected elements of the START structured domain and recent adverse risk events to risk estimates and outcomes prediction for violence, self-harm/suicidality, victimisation, and self-neglect. START vulnerabilities and lifetime history of violence, predicted the violence risk estimate; self-harm and victimisation estimates were predicted only by corresponding recent adverse events. Recent adverse events uniquely predicted all corresponding outcomes, with the exception of self-neglect which was predicted by the strength scale. Only for victimisation did the risk estimate outperform prediction based on the START components and recent adverse events. In the absence of recent corresponding risk behaviour, restrictions imposed on the basis of START-informed risk estimates could be unwarranted and may be unethical.
Resumo:
Protective factors are neglected in risk assessment in adult psychiatric and criminal justice populations. This review investigated the predictive efficacy of selected tools that assess protective factors. Five databases were searched using comprehensive terms for records up to June 2014, resulting in 17 studies (n = 2,198). Results were combined in a multilevel meta-analysis using the R (R Core Team, R: A Language and Environment for Statistical Computing, Vienna, Austria: R Foundation for Statistical Computing, 2015) metafor package (Viechtbauer, Journal of Statistical Software, 2010, 36, 1). Prediction of outcomes was poor relative to a reference category of violent offending, with the exception of prediction of discharge from secure units. There were no significant differences between the predictive efficacy of risk scales, protective scales, and summary judgments. Protective factor assessment may be clinically useful, but more development is required. Claims that use of these tools is therapeutically beneficial require testing.
Resumo:
BACKGROUND: Risk assessment is fundamental in the management of acute coronary syndromes (ACS), enabling estimation of prognosis. AIMS: To evaluate whether the combined use of GRACE and CRUSADE risk stratification schemes in patients with myocardial infarction outperforms each of the scores individually in terms of mortality and haemorrhagic risk prediction. METHODS: Observational retrospective single-centre cohort study including 566 consecutive patients admitted for non-ST-segment elevation myocardial infarction. The CRUSADE model increased GRACE discriminatory performance in predicting all-cause mortality, ascertained by Cox regression, demonstrating CRUSADE independent and additive predictive value, which was sustained throughout follow-up. The cohort was divided into four different subgroups: G1 (GRACE<141; CRUSADE<41); G2 (GRACE<141; CRUSADE≥41); G3 (GRACE≥141; CRUSADE<41); G4 (GRACE≥141; CRUSADE≥41). RESULTS: Outcomes and variables estimating clinical severity, such as admission Killip-Kimbal class and left ventricular systolic dysfunction, deteriorated progressively throughout the subgroups (G1 to G4). Survival analysis differentiated three risk strata (G1, lowest risk; G2 and G3, intermediate risk; G4, highest risk). The GRACE+CRUSADE model revealed higher prognostic performance (area under the curve [AUC] 0.76) than GRACE alone (AUC 0.70) for mortality prediction, further confirmed by the integrated discrimination improvement index. Moreover, GRACE+CRUSADE combined risk assessment seemed to be valuable in delineating bleeding risk in this setting, identifying G4 as a very high-risk subgroup (hazard ratio 3.5; P<0.001). CONCLUSIONS: Combined risk stratification with GRACE and CRUSADE scores can improve the individual discriminatory power of GRACE and CRUSADE models in the prediction of all-cause mortality and bleeding. This combined assessment is a practical approach that is potentially advantageous in treatment decision-making.
Resumo:
Some polycyclic aromatic hydrocarbons (PAHs) are ubiquitous in air and have been implicated as carcinogenic materials. Therefore, literature is replete with studies that are focused on their occurrence and profiles in indoor and outdoor air samples. However, because the relative potency of individual PAHs vary widely, health risks associated with the presence of PAHs in a particular environment cannot be extrapolated directly from the concentrations of individual PAHs in that environment. In addition, database on the potency of PAH mixtures is currently limited. In this paper, we have utilized multi-criteria decision making methods (MCDMs) to simultaneously correlate PAH-related health risk in some microenvironments to the concentration levels, ethoxyresorufin-O-deethylase (EROD) activity induction equivalency factors and toxic equivalency factors (TEFs) of PAHs found in those microenvironments. The results showed that the relative risk associated with PAHs in different air samples depends on the index used. Nevertheless, this approach offers a promising tool that could help identify microenvironments of concern and assist the prioritisation of control strategies.
Resumo:
The historical challenge of environmental impact assessment (EIA) has been to predict project-based impacts accurately. Both EIA legislation and the practice of EIA have evolved over the last three decades in Canada, and the development of the discipline and science of environmental assessment has improved how we apply environmental assessment to complex projects. The practice of environmental assessment integrates the social and natural sciences and relies on an eclectic knowledge base from a wide range of sources. EIA methods and tools provide a means to structure and integrate knowledge in order to evaluate and predict environmental impacts.----- This Chapter will provide a brief overview of how impacts are identified and predicted. How do we determine what aspect of the natural and social environment will be affected when a mine is excavated? How does the practitioner determine the range of potential impacts, assess whether they are significant, and predict the consequences? There are no standard answers to these questions, but there are established methods to provide a foundation for scoping and predicting the potential impacts of a project.----- Of course, the community and publics play an important role in this process, and this will be discussed in subsequent chapters. In the first part of this chapter, we will deal with impact identification, which involves appplying scoping to critical issues and determining impact significance, baseline ecosystem evaluation techniques, and how to communicate environmental impacts. In the second part of the chapter, we discuss the prediction of impacts in relation to the complexity of the environment, ecological risk assessment, and modelling.
Resumo:
Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.
Resumo:
A shortage of affordable housing is a major problem in Australia today. This is mainly due to the limited supply of affordable housing that is provided by the non-government housing sector. Some private housing developers see the provision of affordable housing for lower income people as a high risk investment which offers a lower return than broader market-based housing. The scarcity of suitable land, a limited government ‘subsidy’, and increasing housing costs have not provided sufficient development incentives to encourage their investment despite the existing high demand for affordable housing. This study analyses the risk management process conducted by some private and not-for-profit housing providers in South East Queensland, and draws conclusions about the relationship between risk assessments/responses and past experiences. In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment/response in developing and in managing affordable housing projects. These developers use an informal risk management process as part of their normal business process in accordance with industry standards. A simple qualitative matrix has been used to analyse probability and impacts using a qualitative scale - low, medium and high. For housing providers who have considered investing in affordable housing but have not yet implemented any such projects, affordable housing development is seen as an opportunity that needs to be approached with caution. The risks associated with such projects and the levels of acceptance of these are not consistently identified by current housing providers. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. This study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.
Resumo:
Purpose: The purpose of this paper is to analyse the risk management process conducted by some private and not-for-profit affordable housing providers in South East Queensland, and draw conclusions about the relationship between risk assessments/responses and past experiences.----- Design/methodology/approach: In-depth interviews of selected non-government housing providers have been conducted to facilitate an understanding of their approach to risk assessment in developing and in managing affordable housing projects. Qualitative data are analysed using thematic analysis to find emerging themes suggested by interview participants.----- Findings: The paper finds that informal risk management process is used as part of normal business process in accordance with industry standards. Many interviewees agree that the recognition of financial risk and the fear of community rejection of such housing projects have restrained them from committing to such investment projects. The levels of acceptance of risk are not always consistent across housing providers which create opportunities to conduct multi-stakeholder partnership to reduce overall risk.----- Research limitations/implications: The paper has implications for developers or investors who seek to include affordable housing as part of their portfolio. However, data collected in the study are a cross-section of interviews that will not include the impact on recent tax incentives offers by the Australian Commonwealth Government.----- Practical implications: The study suggests that implementing improvements to the risk mitigation and management framework may assist in promoting the supply of affordable housing by non-government providers.----- Originality/value: The focus of the study is the interaction between partnerships and risk management in development and management of affordable rental housing.
Resumo:
Quantitative Microbial Risk Assessment (QMRA) analysis was used to quantify the risk of infection associated with the exposure to pathogens from potable and non-potable uses of roof-harvested rainwater in South East Queensland (SEQ). A total of 84 rainwater samples were analysed for the presence of faecal indicators (using culture based methods) and zoonotic bacterial and protozoan pathogens using binary and quantitative PCR (qPCR). The concentrations of Salmonella invA, and Giardia lamblia β-giradin genes ranged from 65-380 genomic units/1000 mL and 9-57 genomic units/1000 mL of water, respectively. After converting gene copies to cell/cyst number, the risk of infection from G. lamblia and Salmonella spp. associated with the use of rainwater for bi-weekly garden hosing was calculated to be below the threshold value of 1 extra infection per 10,000 persons per year. However, the estimated risk of infection from drinking the rainwater daily was 44-250 (for G. lamblia) and 85-520 (for Salmonella spp.) infections per 10,000 persons per year. Since this health risk seems higher than that expected from the reported incidences of gastroenteritis, the assumptions used to estimate these infection risks are critically discussed. Nevertheless, it would seem prudent to disinfect rainwater for potable use.
Resumo:
Large mysticete whales represent a unique challenge for chemical risk assessment. Few epidemiological investigations are possible due to the low incidence of adult stranding events. Similarly their often extreme life-history adaptations of prolonged migration and fasting challenge exposure assumptions. Molecular biomarkers offer the potential to complement information yielded through tissue chemical analysis, as well as providing evidence of a molecular response to chemical exposure. In this study we confirm the presence of cytochrome P450 reductase (CPR) and cytochrome P450 isoenzyme 1A1 (CYP1A1) in epidermal tissue of southern hemisphere humpback whales (Megaptera novaeangliae). The detection of CYP1A1 in the integument of the humpback whale affords the opportunity for further quantitative non-destructive investigations of enzyme activity as a function of chemical stress.
Resumo:
Different international plant protection organisations advocate different schemes for conducting pest risk assessments. Most of these schemes use structured questionnaire in which experts are asked to score several items using an ordinal scale. The scores are then combined using a range of procedures, such as simple arithmetic mean, weighted averages, multiplication of scores, and cumulative sums. The most useful schemes will correctly identify harmful pests and identify ones that are not. As the quality of a pest risk assessment can depend on the characteristics of the scoring system used by the risk assessors (i.e., on the number of points of the scale and on the method used for combining the component scores), it is important to assess and compare the performance of different scoring systems. In this article, we proposed a new method for assessing scoring systems. Its principle is to simulate virtual data using a stochastic model and, then, to estimate sensitivity and specificity values from these data for different scoring systems. The interest of our approach was illustrated in a case study where several scoring systems were compared. Data for this analysis were generated using a probabilistic model describing the pest introduction process. The generated data were then used to simulate the outcome of scoring systems and to assess the accuracy of the decisions about positive and negative introduction. The results showed that ordinal scales with at most 5 or 6 points were sufficient and that the multiplication-based scoring systems performed better than their sum-based counterparts. The proposed method could be used in the future to assess a great diversity of scoring systems.