853 resultados para mega-projects
Resumo:
Purpose: The purpose of this paper is to investigate the relationship between the facets of cultural intelligence (CQ) (cognitive, meta-cognitive, motivational and behavioural) and the dimensions of cross-cultural adjustment (interaction, general and work adjustment).
Design/methodology/approach: Interviews and questionnaire survey were carried out with British expatriates from the architectural, engineering and construction sector. A total of 191 respondents, with experience from 29 different countries, actively participated in this research. Structural equation model was subsequently developed to investigate the relationship between elements of CQ and cross-cultural adjustment.
Findings: Results of structural equation modelling revealed that collectively all the four aspects of CQ have significant influence on general, interaction and work adjustment, particularly motivational and cognitive CQ. Cognitive CQ which empowers the expatriates with in-depth knowledge about different cultures was a significant predictor of interaction and work adjustment, whereas, motivational CQ is a significant predictor for general and work adjustment. However, no support was gathered for meta-cognitive and behavioural aspects of CQ.
Practical implications: Globally, construction companies and projects are entering an era of increased internationalisation which has prompted the migration/promotion of British construction professionals to different parts of the world for their specialised capabilities and skills. Thus, it is of utmost importance that these professionals adjust to their new world of varied culture and still be productive in their work.
Originality/value: An understanding of these essential factors can actually help British construction organisations to select and mentor individuals and to provide necessary training for successful international assignments.
Resumo:
Live projects adopt a wide range of approaches: design/ build, community engagement, participation, protest, analysis, etc. They are driven by tutors with passion, expertise and the ability to manage risk, in ways that exhibit fluency and high levels of skill. They also offer sites of student-led and community co-learning, can support research, demonstrate ‘impact’ and satisfy universities’ policies on outreach. Whilst the breadth and reach of Live Projects is now demonstrably wide, we still fail to fully locate Live Projects within a pedagogical context, tending instead to limit our descriptions and hence analysis to the architectural process and outcome. This failure to locate Live Projects within a pedagogical framework means we still struggle to encapsulate, critique, progress, and indeed, elevate the work.
This chapter draws on some of the case studies presented in recent papers and international conferences in order to provide educators with signposts and important overviews around which and in respect to they can develop their own pedagogical frameworks.
Resumo:
Participant recruitment is understood to be one of the most difficult aspects of the research process. Researchers are now devoting increasing amounts of time and resources to understand how participants decide to take part in research and what researchers can do to make their work appeal to potential participants. The purpose of the study is to assess the problems experienced by researchers in Northern Ireland when recruiting human participants into trials and studies and to gain insight into how researchers handle and overcome these issues. The main research question being addressed by this research is to develop an understanding of the problems experienced by staff when recruiting human participants to research projects. Methods used to increase study recruitment were also examined. The participants in this research are investigators and other associated staff on research studies based in Northern Ireland. Potential participants were identified through contacts with research active organizations such as the academic researchers in Queen’s University Belfast and research physicians and clinical trialists employed by the Belfast Health and Social Care Trust. Each organization forwarded on the survey request via email or newsletters. Researchers willing to take part accessed the questionnaire through the Survey Monkey website. This study utilised a cross-sectional questionnaire design.
Resumo:
The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.
Resumo:
The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate
Resumo:
Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due
to, for example, more frequent and earlier feedback, shorter periods of development time and easier prediction of cost. Therefore, there is a need to investigate how risk management can be usable in iterative and evolutionary software development processes. This paper investigates the gathering of empirical data on risk management from the project environment and presents
a novel approach to manage risk in agile projects. Our approach is based on a prototype tool, Agile Risk Tool (ART). This tool reduces human effort in risk management by using software agents to identify, assess and monitor risk, based on input and data collected from the project environment and by applying
some designated rules. As validation, groups of student project data were used to provide evidence of the efficacy of this approach. We demonstrate the approach and the feasibility of using a lightweight risk management tool to alert, assess and monitor risk with reduced human effort.
Resumo:
Prior research on NGO accountability argued that in the process of upward accountability to donors NGOs’ accountability towards beneficiaries had been compromised. With a focus on beneficiary accountability this paper undertakes a comparative examination of a donor funded project and a non-donor funded project. The study has been carried out in the context of a large Bangladeshi NGO with international operations. While the above conclusion on NGO accountability generally holds our study shows a somewhat different picture. Drawing on a comprehensive set of empirical evidence from various sources such as documentary analysis, interviews, focus groups and observations we show that beneficiary accountability can be better in donor funded projects as compared to non-donor funded projects. We theorise the circumstances under which it can happen. This finding has significant implications for the policy makers and donors in the context of recent drive for the self-sustainability of NGOs and its impact on the crucial issue of beneficiary accountability.
Resumo:
This paper examines the extent to which the proclamation by the International Olympic Committee (IOC) that Olympic Games hosting can improve the environmental capacity of the host nation holds. It singles out the post-event environmental concern exhibited by the population of the host country as the most important indicator and proceeds towards examining how successive host nations have performed in relation to that. The intervening variable of the global environmental crisis is put under the microscope and as a result the general conclusion suggests that environmental concern is much more tied to the general socio-economic predicament that the host country finds itself to be in the post-event phase than the successful hosting of green Games.
Resumo:
Congenital anomalies (CA) are the paradigm example of rare diseases liable to primary prevention actions due to the multifactorial etiology of many of them, involving a number of environmental factors together with genetic predispositions. Yet despite the preventive potential, lack of attention to an integrated preventive strategy has led to the prevalence of CA remaining relatively stable in recent decades. The 2 European projects, EUROCAT and EUROPLAN, have joined efforts to provide the first science-based and comprehensive set of recommendations for the primary prevention of CA in the European Union. The resulting EUROCAT-EUROPLAN 'Recommendations on Policies to Be Considered for the Primary Prevention of Congenital Anomalies in National Plans and Strategies on Rare Diseases' were issued in 2012 and endorsed by EUCERD (European Union Committee of Experts on Rare Diseases) in 2013. The recommendations exploit interdisciplinary expertise encompassing drugs, diet, lifestyles, maternal health status, and the environment. The recommendations include evidence-based actions aimed at reducing risk factors and at increasing protective factors and behaviors at both individual and population level. Moreover, consideration is given to topics specifically related to CA (e.g. folate status, teratogens) as well as of broad public health impact (e.g. obesity, smoking) which call for specific attention to their relevance in the pre- and periconceptional period. The recommendations, reported entirely in this paper, are a comprehensive tool to implement primary prevention into national policies on rare diseases in Europe.
Resumo:
The levels of As and various other trace elements found in the irrigated agricultural soil (Tsoil) of southern Libya were compared with non-irrigated soil (Csoil) from the same sampling campaign collected between April and May 2008. The soil samples represented agronomic practice in the southern Libyan regions of Maknwessa (MAK), Aril (ARL) and Taswaa (TAS), and were analyzed by Inductively coupled plasma mass spectrometry (ICP-MS) for Co, Ni, Cu, Se, Mo, Zn, As, Pb, Cd and P. Concentrations of P and As in TAS and MAK were found to be higher in Tsoil compared to Csoil, while the opposite was true for ARL. In general, As concentrations in these areas were 2-3 times lower than the global average. In ARL, the average P concentrations of the Csoil samples were significantly higher than those of Tsoil samples: this site is composed mainly of pasture for animal production, where phosphate fertilizers are used regularly. Distance from the source of irrigation was found to be of an important influence on the heavy metal concentration of the soil, with greater concentrations found closer to the irrigation source. It can be concluded from the results that irrigation water contains elevated levels of As, which finds its way into the soil profile and can lead to accumulation of As in the soil over time.