952 resultados para enterprise systems engineering
Resumo:
This paper proposes the use of battery energy storage (BES) system for the grid-connected doubly fed induction generator (DFIG). The BES would help in storing/releasing additional power in case of higher/lower wind speed to maintain constant grid power. The DC link capacitor is replaced with the BES system in a DFIG-based wind turbine to achieve the above-mentioned goal. The control scheme is modified and the co-ordinated tuning of the associated controllers to enhance the damping of the oscillatory modes is presented using bacterial foraging technique. The results from eigenvalue analysis and the time domain simulation studies are presented to elucidate the effectiveness of the BES systems in maintaining the grid stability under normal operation.
Resumo:
This paper focuses on the implementation of a damping controller for the doubly fed induction generator (DFIG) system. Coordinated tuning of the damping controller to enhance the damping of the oscillatory modes is presented using bacterial foraging technique. The effect of the tuned damping controller on converter ratings of the DFIG system is also investigated. The results of both eigenvalue analysis and the time-domain simulation studies are presented to elucidate the effectiveness of the tuned damping controller in the DFIG system. The improvement of the fault ride-through capability of the system is also demonstrated.
Resumo:
This paper presents a new approach to the design of a rough fuzzy controller for the control loop of the SVC (static VAR system) in a two area power system for stability enhancement with particular emphasis on providing effective damping for oscillatory instabilities. The performances of the rough fuzzy and the conventional fuzzy controller are compared with that of the conventional PI controller for a variety of transient disturbances, highlighting the effectiveness of the rough fuzzy controller in damping the inter-area oscillations. The effect of the rough fuzzy controller in improving the CCT (critical clearing time) of the two area system is elaborated in this paper as well.
Resumo:
The Midwest Independent Transmission System Operator (MISO) has experienced significant amounts of wind power development within the last decade. The MISO footprint spans the majority of the upper Midwest region of the country, from the Dakotas to Indiana and as far east as Michigan. These areas have a rich wind energy resource. States in the MISO footprint have passed laws or set goals that require load serving entities to supply a portion of their load using renewable energy. In order to meet these requirements, significant investments are needed to build the transmission infrastructure necessary to deliver the power from these often remote wind energy resources to the load centers. This paper presents some of the transmission planning related work done at MISO which was largely influenced by current and future needs for increased wind power generation in the footprint. Specifically, topics covered are generator interconnection, long-term planning coordination, and cost-allocation for new transmission lines.
Resumo:
The Midwestern US is a wind-rich resource and wind power is being developed in this region at a very brisk pace. Transporting this energy resource to load centers invariably requires massive transmission lines. This issue of developing additional transmission to support reliable integration of wind on to the power grid provides a multitude of interesting challenges spanning various areas of power systems such as transmission planning, real-time operations and cost-allocation for new transmission. The Midwest ISO as a regional transmission provider is responsible for processing requests to interconnect proposed generation on to the transmission grid under its purview. This paper provides information about some of the issues faced in performing interconnection planning studies and Midwest ISO's efforts to improve its generator interconnection procedures. Related cost-allocation efforts currently ongoing at the Midwest ISO to streamline integration of bulk quantities of wind power in to the transmission grid are also presented.
Resumo:
Australia is rich in renewable energy resources such as wind, solar and geothermal. Geographical diversity of these renewable resources combined with developing climate change policies poses a great challenge for the long term interconnection planning. Intermittency of wind and solar potentially driving the development of new transmission lines bring additional complexity to power system operations and planning. This paper provides an overview of generation and transmission planning studies in Australia to meet 20% renewable energy target by 2020. Appraisal of the effectiveness of dispersed energy storage, non schedulable peaking plants, wide area controls and demand management techniques to aid the penetration of renewables is presented in this paper
Resumo:
The security of power transfer across a given transmission link is typically a steady state assessment. This paper develops tools to assess machine angle stability as affected by a combination of faults and uncertainty of wind power using probability analysis. The paper elaborates on the development of the theoretical assessment tool and demonstrates its efficacy using single machine infinite bus system.
Resumo:
Over the past few years, the Midwest ISO has experienced a surge in requests to interconnect large amounts of wind generation, driven largely by a favorable political environment and an abundant wind resource in the Midwestern US. This tremendous influx of proposed generators along with a highly constrained transmission system adversely impacted interconnection queue processing, resulting in an unmanageable backlog. Under these circumstances, Midwest ISO successfully reformed the interconnection tariff to improve cycle times and provide increased certainty to interconnection customers. One of the key features of the reformed queue process is the System Planning and Analysis (SPA) phase which allows integration of the interconnection studies with regional transmission planning. This paper presents a brief background of the queue reform effort and then delves deeply in to the work performed at the Midwest ISO during the first SPA cycle - the study approach, the challenges faced in having to study over 50,000 MWs of wind generation and the effective solutions designed to complete these studies within tariff timelines.
Resumo:
Today, a large number of wind generator interconnection requests have been queued and are being processed. The generator interconnection group study is a way to reduce the generator interconnection cycle time and increase interconnection certainty. However, it is very challenging to identify the “best” transmission upgrades for a large group of generator interconnections. It is also very important to differentiate the constraints caused by each generator interconnection request and identify their responsibilities for transmission upgrades. This paper outlines some innovative study approaches that can be used in a group study with large numbers of generator interconnection requests in a constrained area. Improved study methods are introduced, and a summary and conclusions are derived from the study.
Resumo:
With the advent of large-scale wind farms and their integration into electrical grids, more uncertainties, constraints and objectives must be considered in power system development. It is therefore necessary to introduce risk-control strategies into the planning of transmission systems connected with wind power generators. This paper presents a probability-based multi-objective model equipped with three risk-control strategies. The model is developed to evaluate and enhance the ability of the transmission system to protect against overload risks when wind power is integrated into the power system. The model involves: (i) defining the uncertainties associated with wind power generators with probability measures and calculating the probabilistic power flow with the combined use of cumulants and Gram-Charlier series; (ii) developing three risk-control strategies by specifying the smallest acceptable non-overload probability for each branch and the whole system, and specifying the non-overload margin for all branches in the whole system; (iii) formulating an overload risk index based on the non-overload probability and the non-overload margin defined; and (iv) developing a multi-objective transmission system expansion planning (TSEP) model with the objective functions composed of transmission investment and the overload risk index. The presented work represents a superior risk-control model for TSEP in terms of security, reliability and economy. The transmission expansion planning model with the three risk-control strategies demonstrates its feasibility in the case study using two typical power systems
Resumo:
Process bus networks are the next stage in the evolution of substation design, bringing digital technology to the high voltage switchyard. Benefits of process buses include facilitating the use of Non-Conventional Instrument Transformers, improved disturbance recording and phasor measurement and the removal of costly, and potentially hazardous, copper cabling from substation switchyards and control rooms. This paper examines the role a process bus plays in an IEC 61850 based Substation Automation System. Measurements taken from a process bus substation are used to develop an understanding of the network characteristics of "whole of substation" process buses. The concept of "coherent transmission" is presented and the impact of this on Ethernet switches is examined. Experiments based on substation observations are used to investigate in detail the behavior of Ethernet switches with sampled value traffic. Test methods that can be used to assess the adequacy of a network are proposed, and examples of the application and interpretation of these tests are provided. Once sampled value frames are queued by an Ethernet switch the additional delay incurred by subsequent switches is minimal, and this allows their use in switchyards to further reduce communications cabling, without significantly impacting operation. The performance and reliability of a process bus network operating with close to the theoretical maximum number of digital sampling units (merging units or electronic instrument transformers) was investigated with networking equipment from several vendors, and has been demonstrated to be acceptable.
Resumo:
The development and design of electric high power devices with electromagnetic computer-aided engineering (EM-CAE) software such as the Finite Element Method (FEM) and Boundary Element Method (BEM) has been widely adopted. This paper presents the analysis of a Fault Current Limiter (FCL), which acts as a high-voltage surge protector for power grids. A prototype FCL was built. The magnetic flux in the core and the resulting electromagnetic forces in the winding of the FCL were analyzed using both FEM and BEM. An experiment on the prototype was conducted in a laboratory. The data obtained from the experiment is compared to the numerical solutions to determine the suitability and accuracy of the two methods.
Resumo:
Having a reliable understanding about the behaviours, problems, and performance of existing processes is important in enabling a targeted process improvement initiative. Recently, there has been an increase in the application of innovative process mining techniques to facilitate evidence-based understanding about organizations' business processes. Nevertheless, the application of these techniques in the domain of finance in Australia is, at best, scarce. This paper details a 6-month case study on the application of process mining in one of the largest insurance companies in Australia. In particular, the challenges encountered, the lessons learned, and the results obtained from this case study are detailed. Through this case study, we not only validated existing `lessons learned' from other similar case studies, but also added new insights that can be beneficial to other practitioners in applying process mining in their respective fields.
Resumo:
New substation technology, such as non-conventional instrument transformers,and a need to reduce design and construction costs, are driving the adoption of Ethernet based digital process bus networks for high voltage substations. Protection and control applications can share a process bus, making more efficient use of the network infrastructure. This paper classifies and defines performance requirements for the protocols used in a process bus on the basis of application. These include GOOSE, SNMP and IEC 61850-9-2 sampled values. A method, based on the Multiple Spanning Tree Protocol (MSTP) and virtual local area networks, is presented that separates management and monitoring traffic from the rest of the process bus. A quantitative investigation of the interaction between various protocols used in a process bus is described. These tests also validate the effectiveness of the MSTP based traffic segregation method. While this paper focusses on a substation automation network, the results are applicable to other real-time industrial networks that implement multiple protocols. High volume sampled value data and time-critical circuit breaker tripping commands do not interact on a full duplex switched Ethernet network, even under very high network load conditions. This enables an efficient digital network to replace a large number of conventional analog connections between control rooms and high voltage switchyards.
Resumo:
An iterative based strategy is proposed for finding the optimal rating and location of fixed and switched capacitors in distribution networks. The substation Load Tap Changer tap is also set during this procedure. A Modified Discrete Particle Swarm Optimization is employed in the proposed strategy. The objective function is composed of the distribution line loss cost and the capacitors investment cost. The line loss is calculated using estimation of the load duration curve to multiple levels. The constraints are the bus voltage and the feeder current which should be maintained within their standard range. For validation of the proposed method, two case studies are tested. The first case study is the semi-urban 37-bus distribution system which is connected at bus 2 of the Roy Billinton Test System which is located in the secondary side of a 33/11 kV distribution substation. The second case is a 33 kV distribution network based on the modification of the 18-bus IEEE distribution system. The results are compared with prior publications to illustrate the accuracy of the proposed strategy.