916 resultados para Power Systems, Load Model, Indentification


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Concentrated solar power systems are expected to be sited in desert locations where the direct normal irradiation is above 1800 kWh/m2.year. These systems include large solar collector assemblies, which account for a significant share of the investment cost. Solarreflectors are the main components of these solar collector assemblies and dust/sand storms may affect their reflectance properties, either by soiling or by surface abrasion. While soiling can be reverted by cleaning, surface abrasion is a non reversible degradation.The aim of this project was to study the accelerated aging of second surface silvered thickglass solar reflectors under simulated sandstorm conditions and develop a multi-parametric model which relates the specular reflectance loss to dust/sand storm parameters: wind velocity, dust concentration and time of exposure. This project focused on the degradation caused by surface abrasion.Sandstorm conditions were simulated in a prototype environmental test chamber. Material samples (6cm x 6cm) were exposed to Arizona coarse test dust. The dust stream impactedthese material samples at a perpendicular angle. Both wind velocity and dust concentrationwere maintained at a stable level for each accelerated aging test. The total exposure time in the test chamber was limited to 1 hour. Each accelerated aging test was interrupted every 4 minutes to measure the specular reflectance of the material sample after cleaning.The accelerated aging test campaign had to be aborted prematurely due to a contamination of the dust concentration sensor. A robust multi-parametric degradation model could thus not be derived. The experimental data showed that the specular reflectance loss decreasedeither linearly or exponentially with exposure time, so that a degradation rate could be defined as a single modeling parameter. A correlation should be derived to relate this degradation rate to control parameters such as wind velocity and dust/sand concentration.The sandstorm chamber design would have to be updated before performing further accelerated aging test campaigns. The design upgrade should improve both the reliability of the test equipment and the repeatability of accelerated aging tests. An outdoor exposure test campaign should be launched in deserts to learn more about the intensity, frequencyand duration of dust/sand storms. This campaign would also serve to correlate the results of outdoor exposure tests with accelerated exposure tests in order to develop a robust service lifetime prediction model for different types of solar reflector materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report contains a suggestion for a simple monitoring and evaluation guideline for PV-diesel hybrid systems. It offers system users a way to better understand if their system is operated in a way that will make it last for a long time. It also gives suggestions on how to act if there are signs of unfavourable use or failure. The application of the guide requires little technical equipment, but daily manual measurements. For the most part, it can be managed by pen and paper, by people with no earlier experience of power systems.The guide is structured and expressed in a way that targets PV-diesel hybrid system users with no, or limited, earlier experience of power engineering. It is less detailed in terms of motivations for certain choices and limitations, but rich in details concerning calculations, evaluation procedures and maintenance routines. A more scientific description of the guide can be found in a related journal article.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A presente dissertação tem como objetivo estudar e aprimorar métodos de projetos de controladores para sistemas de potência, sendo que esse trabalho trata da estabilidade dinâmica de sistemas de potência e, portanto, do projeto de controladores amortecedores de oscilações eletromecânicas para esses sistemas. A escolha dos métodos aqui estudados foi orientada pelos requisitos que um estabilizador de sistemas de potência (ESP) deve ter, que são robustez, descentralização e coordenação. Sendo que alguns deles tiveram suas características aprimoradas para atender a esses requisitos. A abordagem dos métodos estudados foi restringida à análise no domínio tempo, pois a abordagem temporal facilita a modelagem das incertezas paramétricas, para atender ao requisito da robustez, e também permite a formulação do controle descentralizado de maneira simples. Além disso, a abordagem temporal permite a formulação do problema de projeto utilizando desigualdades matriciais lineares (LMI’s), as quais possuem como vantagem o fato do conjunto solução ser sempre convexo e a existência de algoritmos eficientes para o cálculo de sua solução. De fato, existem diversos pacotes computacionais desenvolvidos no mercado para o cálculo da solução de um problema de inequações matriciais lineares. Por esse motivo, os métodos de projeto para controladores de saída buscam sempre colocar o problema na forma de LMI’s, tendo em vista que ela garante a obtenção de solução, caso essa solução exista.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O objetivo deste trabalho é mostrar através de um estudo de caso que a implantação de um modelo de organização da produção e do trabalho baseado na gestão por processos pode acenar com uma perspectiva pós-fordista para a atividade de operação de sistemas de energia elétrica. As grandes empresas brasileiras do setor de energia elétrica adotaram, desde a sua criação, um modelo organizacional com base nas funções gerenciais propostas por Henri Fayol, sendo estruturadas de forma vertical e hierárquica. Por outro lado, as tarefas realizadas nas salas de controle dos Centros de Operação dessas empresas se processam de acordo com a forma preconizada pelo sistema de Administração Científica de Frederick Taylor e pelos princípios propostos por Henry Ford. Porém, em decorrência da mudança do modelo institucional do setor de energia, ocorrida em meados da década de 90, além da maior conscientização da sociedade a respeito dos seus direitos de cidadania e também da busca dos trabalhadores pela democratização nas relações sociais em seu ambiente de trabalho, as empresas de energia elétrica foram compelidas a buscar novas formas de gestão mais adequadas ao novo cenário cultural, político, social e econômico. Em FURNAS, como nova forma de organização da produção e do trabalho, o Departamento de Operação do Sistema resolveu adotar um sistema baseado na gestão por processos que respeita a estrutura funcional da Empresa, formando, assim, uma estrutura organizacional matricial. Por outro lado, observou-se que, dependendo da forma de implantação e dos mecanismos de gestão adotados, esse novo sistema podia acenar com uma perspectiva pós-fordista para a atividade de operação de sistemas elétricos de grande porte que, tipicamente, no Brasil, é desenvolvida por empresas fayolistas, segundo uma perspectiva taylorista-fordista. Para verificar se essa possibilidade se concretizou foi realizada uma pesquisa que abrangeu os cinco Centros de Operação do Departamento de Operação do Sistema de FURNAS Centrais Elétricas S.A., tomando como elemento-chave a seguinte caracterização do paradigma do pós-fordismo: diferenciação integrada da organização da produção e do trabalho sob a trajetória de inovação tecnológica em direção à ~ democratização das relações sociais nos sistemas-empresa. O trabalho apresenta a percepção da evolução nos relacionamentos interpessoais e a percepção das ações gerenciais empreendidas visando a implantação do novo sistema, bem como também mostra as transformações ocorridas no tocante à democratização das relaçõe~ sociais no Departamento, entre outros fatores que substanciam a pesquisa, cujo resultado aponta para uma nova forma de gestão do trabalho e da produção em que essas relações sociais tendem a ser pautadas por ações gerenciais dialógicas que caracterizam a perspectiva pós-fordista.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work aims to predict the total maximum demand of a transformer that will be used in power systems to attend a Multiple Unit Consumption (MUC) in design. In 1987, COSERN noted that calculation of maximum total demand for a building should be different from that which defines the scaling of the input protection extension in order to not overestimate the power of the transformer. Since then there have been many changes, both in consumption habits of the population, as in electrical appliances, so that this work will endeavor to improve the estimation of peak demand. For the survey, data were collected for identification and electrical projects in different MUCs located in Natal. In some of them, measurements were made of demand for 7 consecutive days and adjusted for an integration interval of 30 minutes. The estimation of the maximum demand was made through mathematical models that calculate the desired response from a set of information previously known of MUCs. The models tested were simple linear regressions, multiple linear regressions and artificial neural networks. The various calculated results over the study were compared, and ultimately, the best answer found was put into comparison with the previously proposed model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work develops a methodology for defining the maximum active power being injected into predefined nodes in the studied distribution networks, considering the possibility of multiple accesses of generating units. The definition of these maximum values is obtained from an optimization study, in which further losses should not exceed those of the base case, i.e., without the presence of distributed generation. The restrictions on the loading of the branches and voltages of the system are respected. To face the problem it is proposed an algorithm, which is based on the numerical method called particle swarm optimization, applied to the study of AC conventional load flow and optimal load flow for maximizing the penetration of distributed generation. Alternatively, the Newton-Raphson method was incorporated to resolution of the load flow. The computer program is performed with the SCILAB software. The proposed algorithm is tested with the data from the IEEE network with 14 nodes and from another network, this one from the Rio Grande do Norte State, at a high voltage (69 kV), with 25 nodes. The algorithm defines allowed values of nominal active power of distributed generation, in percentage terms relative to the demand of the network, from reference values

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To simplify computer management, various administration systems based on wired connections adopt advanced techniques to manage software configuration. Nevertheless, the strong relation between hardware and software makes for an individualism of that management, besides penalizing computational mobility and ubiquity. All these issues lead to degradation of scalability, flexibility and the facility to install and maintain distributed applications. This article presents an environment for centralized wireless communication network management, named WSE-OS (Wireless Sharing Environment - Operating Systems): a model based on Virtual Desktop Infrastructure (VDI) which associates virtualization techniques and safe remote access systems to create a distributed architecture as a base for a managing system. WSE-OS is capable of accomplishing the replication of operating system images using wireless communication network, besides offering abstraction of hardware to its clients, making the management more flexible and independent of wired connections. Results obtained from this work indicate that WSE-OS allows disseminating, through a single software configuration, the execution of data related to operating system images in client computers. WSE-OS can also be used as a management tool for operating systems in a wireless network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents a methodology to analyze transient stability (first oscillation) of electric energy systems, using a neural network based on ART architecture (adaptive resonance theory), named fuzzy ART-ARTMAP neural network for real time applications. The security margin is used as a stability analysis criterion, considering three-phase short circuit faults with a transmission line outage. The neural network operation consists of two fundamental phases: the training and the analysis. The training phase needs a great quantity of processing for the realization, while the analysis phase is effectuated almost without computation effort. This is, therefore the principal purpose to use neural networks for solving complex problems that need fast solutions, as the applications in real time. The ART neural networks have as primordial characteristics the plasticity and the stability, which are essential qualities to the training execution and to an efficient analysis. The fuzzy ART-ARTMAP neural network is proposed seeking a superior performance, in terms of precision and speed, when compared to conventional ARTMAP, and much more when compared to the neural networks that use the training by backpropagation algorithm, which is a benchmark in neural network area. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The optimized allocation of protective devices in strategic points of the circuit improves the quality of the energy supply and the system reliability index. This paper presents a nonlinear integer programming (NLIP) model with binary variables, to deal with the problem of protective device allocation in the main feeder and all branches of an overhead distribution circuit, to improve the reliability index and to provide customers with service of high quality and reliability. The constraints considered in the problem take into account technical and economical limitations, such as coordination problems of serial protective devices, available equipment, the importance of the feeder and the circuit topology. The use of genetic algorithms (GAs) is proposed to solve this problem, using a binary representation that does (1) or does not (0) show allocation of protective devices (reclosers, sectionalizers and fuses) in predefined points of the circuit. Results are presented for a real circuit (134 busses), with the possibility of protective device allocation in 29 points. Also the ability of the algorithm in finding good solutions while improving significantly the indicators of reliability is shown. (C) 2003 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents a well-known interior point method (IPM) used to solve problems of linear programming that appear as sub-problems in the solution of the long-term transmission network expansion planning problem. The linear programming problem appears when the transportation model is used, and when there is the intention to solve the planning problem using a constructive heuristic algorithm (CHA), ora branch-and-bound algorithm. This paper shows the application of the IPM in a CHA. A good performance of the IPM was obtained, and then it can be used as tool inside algorithm, used to solve the planning problem. Illustrative tests are shown, using electrical systems known in the specialized literature. (C) 2005 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One of the important issues about using renewable energy is the integration of dispersed generation in the distribution networks. Previous experience has shown that the integration of dispersed generation can improve voltage profile in the network, decrease loss, etc. but can create safety and technical problems as well. This work report the application of the instantaneous space phasors and the instantaneous complex power in observing performances of the distribution networks with dispersed generators in steady state. New IEEE apparent power definition, the so-called Buchholz-Goodhue effective apparent power, as well as new proposed power quality (oscillation) index in the three-phase distribution systems with unbalanced loads and dispersed generators, are applied. Results obtained from several case studies using IEEE 34 nodes test network are presented and discussed. (C) 2006 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents an approach for geometric solution of an optimal power flow (OPF) problem for a two bus system (a slack and a PV busses). Additionally, the geometric relationship between the losses minimization and the increase of the reactive margin and, therefore, the maximum loading point, is shown. The algebraic equations for the calculation of the Lagrange multipliers and for the minimum losses value are obtained. These equations are used to validate the results obtained using an OPF program. (C) 2002 Elsevier B.V. B.V. All rights reserved.