999 resultados para Linux Terminal Server Project
Resumo:
Field lab: Consulting lab
Resumo:
This paper analyzes the Nova Student Portfolio (NSP) with the objective to understand performances of the fund. Each investment style has been analyzed (growth, value and momentum) in order to highlight what style allocation contributed positively and which had a negative impact. The results show that the team mainly invested in value stocks, which contributed positively but that its growth investments had a negative impact on the stock picking performance. The stock selection shows a major influence of the value investment style. A statistical approach shows that the market factor was the one explaining the most the NSP returns.
Resumo:
Field lab: Consulting lab
Resumo:
Field lab: Consulting lab
Resumo:
Field lab: Consulting lab
Resumo:
The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile Project Management emerges as a manifestation against traditional approaches, mainly due to their inability of accepting requirements’ changes. Therefore, these practices and concepts can be considered in order to reduce the risks concerning the increase of competition and innovation – which does not apply to the IT sector solely. The current study reviews the literature on Agile Project Management and its adoption across different sectors in order to assess which practices and concepts can be applied on a non-IT context. Nine different methods are reviewed, where two of these show a higher relevance – Scrum and Extreme Programming. The identified practices and concepts can be separated into four different groups: Cultural and Organizational Structures, Process, Practices, and Artefacts. A framework based on the work by Boehm & Turner in 2004 is developed in order to support the decision of adopting agile methods. A survey intended for project managers was carried in order to assess the implementation of the identified practices and concepts and to evaluate which variables have the highest importance on the developed decision support framework. It is concluded that New Product Development is the project type with the highest potential to implement an agile approach and that the Project Final Product’s Innovativeness, Competitiveness, and the Project Member’s Experience and Autonomy are the most important aspects to consider an implementation of an Agile approach.
Resumo:
In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.
Resumo:
This thesis applied real options analysis to the valuation of an offshore oil exploration project, taking into consideration the several options typically faced by the management team of these projects. The real options process is developed under technical and price uncertainties, where it is considered that the mean reversion stochastic process is more adequate to describe the movement of oil price throught time. The valuation is realized to two case scenarios, being the first a simplified approach to develop the intuition of the used concepts, and the later a more complete cases that is resolved using both the binomial and trinomial processes to describe oil price movement. Real options methodology demonstrated to be capable of assessing and valuing the projects options, and of overcoming common capital budgeting methodologies flexibility limitation. The added value of the application of real options is evident, but so is the method's increased complexity, which adversely influence its widespread implementation.
Resumo:
This work presents a model and a heuristic to solve the non-emergency patients transport (NEPT) service issues given the new rules recently established in Portugal. The model follows the same principle of the Team Orienteering Problem by selecting the patients to be included in the routes attending the maximum reduction in costs when compared with individual transportation. This model establishes the best sets of patients to be transported together. The model was implemented in AMPL and a compact formulation was solved using NEOS Server. A heuristic procedure based on iteratively solving problems with one vehicle was presented, and this heuristic provides good results in terms of accuracy and computation time.
Resumo:
This work presents an improved model to solve the non-emergency patients transport (NEPT) service issues given the new rules recently established in Portugal. The model follows the same principle of the Team Orienteering Problem by selecting the patients to be included in the routes attending the maximum reduction in costs when compared with individual transportation. This model establishes the best sets of patients to be transported together. The model was implemented in AMPL and a compact formulation was solved using NEOS Server. A heuristic procedure based on iteratively solving Orienteering Problems is presented, and this heuristic provides good results in terms of accuracy and computation time. Euclidean instances as well as asymmetric real data gathered from Google maps were used, and the model has a promising performance mainly with asymmetric cost matrices.
Resumo:
Since concrete is the most widely utilized construction material, several solutions are currently being developed and investigated for enhancing the sustainability of cementitious materials. One of these solutions is based on producing Recycled Concrete Aggregates (RCA) from existing concrete members resulting by either industrial processes or demolitions of existing structures as a whole. Moreover, waste resulting from industrial processes other than the building construction (i.e., tire recycling, production of steel, powders resulting from other depuration processes) are also being considered as possible low-impact constituents for producing structural concrete and Fiber-Reinforced Cementitious Composites (FRCC). Furthermore, the use of natural fibers is another option for producing environmentally-friendly and cost-effective materials, depending on the local availability of raw materials. To promote the use of concretes partially composed of recycled constituents, their influence on the mechanical and durability performance of these concretes have to be deeply investigated and correlated. This was the main goal of the EnCoRe Project (www.encore-fp7.unisa.it), a EU-funded initiative, whose activities and main findings are summarized in this paper.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
O objetivo deste trabalho é apresentar os resultados da análise das concepções de dois protagonistas de uma reforma curricular que está sendo implementada numa escola de engenharia. A principal característica do novo currículo é o uso de projetos e oficinas como atividades complementares a serem realizadas pelos estudantes. As atividades complementares acontecerão em paralelo ao trabalho realizado nas disciplinas sem que haja uma relação de interdisciplinaridade. O novo currículo está sendo implantado desde fevereiro de 2015. Segundo Pacheco (2005) há dois momentos, dentre outros, no processo de mudança curricular, o currículo “ideal”, determinado por dimensões epistemológica, política, econômica, ideológica, técnica, estética, e histórica e, que recebe influência direta daquele que idealiza e cria o novo currículo e, o currículo “formal” que se traduz na prática implementada na escola. São essas duas etapas estudadas nesta pesquisa. Para isso serão considerados como fontes de dados dois protagonistas, um mais ligado à concepção do currículo e outro da sua implementação, a partir dos quais se busca compreender as motivações, crenças e percepções que, por sua vez, determinam a reforma curricular. Entrevistas semiestruturadas foram utilizadas como técnica de pesquisa, com o propósito de se entender a gênese da proposta e as mudanças entre essas duas etapas. Os dados revelam que mudanças aconteceram desde a idealização até a formalização do currículo, motivadas por demandas do processo de implementação, revela ainda diferenças na visão de currículo e a motivação para romper com padrões na formação de engenheiros no Brasil.
Resumo:
Nowadays, many P2P applications proliferate in the Internet. The attractiveness of many of these systems relies on the collaborative approach used to exchange large resources without the dependence and associated constraints of centralized approaches where a single server is responsible to handle all the requests from the clients. As consequence, some P2P systems are also interesting and cost-effective approaches to be adopted by content-providers and other Internet players. However, there are several coexistence problems between P2P applications and In- ternet Service Providers (ISPs) due to the unforeseeable behavior of P2P traffic aggregates in ISP infrastructures. In this context, this work proposes a collaborative P2P/ISP system able to underpin the development of novel Traffic Engi- neering (TE) mechanisms contributing for a better coexistence between P2P applications and ISPs. Using the devised system, two TE methods are described being able to estimate and control the impact of P2P traffic aggregates on the ISP network links. One of the TE methods allows that ISP administrators are able to foresee the expected impact that a given P2P swarm will have in the underlying network infrastructure. The other TE method enables the definition of ISP friendly P2P topologies, where specific network links are protected from P2P traffic. As result, the proposed system and associated mechanisms will contribute for improved ISP resource management tasks and to foster the deployment of innovative ISP-friendly systems.