945 resultados para Infrastructure projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Inspection aircraft equipped with cameras and other sensors are routinely used for asset location, inspection, monitoring and hazard identification of oil-gas pipelines, roads, bridges and power transmission grids. This paper is concerned with automated flight of fixed-wing inspection aircraft to track approximately linear infrastructure. We propose a guidance law approach that seeks to maintain aircraft trajectories with desirable position and orientation properties relative to the infrastructure under inspection. Furthermore, this paper also proposes the use of an adaptive maneuver selection approach, in which maneuver primitives are adaptively selected to improve the aircraft’s attitude behaviour. We employ an integrated design methodology particularly suited for an automated inspection aircraft. Simulation studies using full nonlinear semi-coupled six degree-of-freedom equations of motion are used to illustrate the effectiveness of the proposed guidance and adaptive maneuver selection approaches in realistic flight conditions. Experimental flight test results are given to demonstrate the performance of the design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concept of ‘sustainability’ has been pushed to the forefront of policy-making and politics as the world wakes up to the impacts of climate change and the effects of the modern urban lifestyle. Climate change has emerged to be one of the biggest challenges faced by our planet today, threatening both built and natural systems with long term consequences which may be irreversible. While there is a vast literature in the market on sustainable cities and urban development, there is currently none that bring together the vital issues of urban and regional development, and the planning, management and implementation of sustainable infrastructure. Large scale infrastructure plays an important part in modern society by not only promoting economic growth, but also by acting as a key indicator for it. More importantly, it supplies municipal/local amenity and services: water, electricity, social and communication facilities, waste removal, transport of people and goods, as well as numerous other services. For the most part, infrastructure has been built by teams lead by engineers who are more concerned about functionality than the concept of sustainability. However, it has been widely stated that current practices and lifestyle cannot continue if we are to leave a healthy living planet to not only the next generation, but also to the generations beyond. Therefore, in order to be sustainable, there are drastic measures that need to be taken. Current single purpose and design infrastructures that are open looped are not sustainable; they are too resource intensive, consume too much energy and support the consumption of natural resources at a rate that will exhaust their supply. Because of this, it is vital that modern society, policy-makers, developers, engineers and planners become pioneers in introducing and incorporating sustainable features into urban and regional infrastructure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Efficient and effective urban management systems for Ubiquitous Eco Cities require having intelligent and integrated management mechanisms. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated, transparent and open decision-making system and necessary infrastructure and technologies. In Ubiquitous Eco Cities telecommunication technologies play an important role in monitoring and managing activities via wired and wireless networks. Particularly, technology convergence creates new ways in which information and telecommunication technologies are used and formed the backbone of urban management. The 21st Century is an era where information has converged, in which people are able to access a variety of services, including internet and location based services, through multi-functional devices and provides new opportunities in the management of Ubiquitous Eco Cities. This chapter discusses developments in telecommunication infrastructure and trends in convergence technologies and their implications on the management of Ubiquitous Eco Cities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Social infrastructure and sustainable development represent two distinct but interlinked concepts bounded by a geographic location. For those involved in the planning of a residential development, the notion of social infrastructure is crucial to the building of a healthy community and sustainable environment. This is because social infrastructure is provided in response to the basic needs of communities and to enhance the quality of life, equity, stability and social well being. It also acts as the building block to the enhancement of human and social capital. While acknowledging the different levels of social infrastructure provision from neighbourhood, local, district and sub-regional levels, past evidence has shown that the provision at neighbourhood and local level and are affecting well-being of residents and the community sustainability. With intense physical development taking place in Australia's South East Queensland (SEQ) region, local councils are under immense pressure to provide adequate social and community facilities for their residents. This paper shows how participation-oriented, need-sensitive Integrated Social Infrastructure Planning Guideline is used to offer a solution for the efficient planning and provision of multi-level social infrastructure for the SEQ region. The paper points out to the successful implementation of the guideline for social infrastructure planning in multiple levels of spatial jurisdictions of Australia's fastest growing region.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the growing importance of sustainability assessment in the construction industry, many green building rating schemes have been adopted in the building sector of Australia. However, there is an abnormal delay in the similar adoption in the infrastructure sector. This prolonged delay in practice poses a challenge in mapping the project objectives with sustainability outcomes. Responding to the challenge of sustainable development in infrastructure, it is critical to create a set of decision indicators for sustainability in infrastructure, which to be used in conjunction with the emerging infrastructure sustainability assessment framework of the Australian Green Infrastructure Council. The various literature sources confirm the lack of correlation between sustainability and infrastructure. This theoretical missing link signifies the crucial validation of the interrelationship and interdependency in sustainability, decision making and infrastructure. This validation is vital for the development of decision indicators for sustainability in infrastructure. Admittedly, underpinned by the serious socio-environmental vulnerability, the traditional focus on economic emphasis in infrastructure development needs to be drifted towards the appropriate decisions for sustainability enhancing the positive social and environmental outcomes. Moreover, the research findings suggest sustainability being observed as powerful socio-political and influential socio-environmental driver in deciding the infrastructure needs and its development. These newly developed sustainability decision indicators create the impetus for change leading to sustainability in infrastructure by integrating the societal cares, environmental concerns into the holistic financial consideration. Radically, this development seeks to transform principles into actions for infrastructure sustainability. Lastly, the thesis concludes with knowledge contribution in five significant areas and future research opportunities. The consolidated research outcomes suggest that the development of decision indicators has demonstrated sustainability as a pivotal driver for decision making in infrastructure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While hybrid governance arrangements have been a major element of organisational architecture for some time, the contemporary operating environment has brought to the fore new conditions and expectations for the governance of entities that span conventional public sector departments, private firms and community organisations or groups. These conditions have resulted in a broader array of mixed governance configurations including Public Private Partnerships, alliances, and formal and informal collaborations. In some such arrangements, market based or ‘complete’ contractual relationships have been introduced to replace or supplement existing traditional ‘hierarchical’ and/or newer relational ‘network-oriented’ institutional associations. While there has been a greater reliance on collaborative or relational contracts as an underpinning institutional model, other modes of hierarchy and market may remain in operation. The success of these emergent hybrid forms has been mixed. There are examples of hybrids that have been well adopted, achieving the desired goals of efficiency, effectiveness and financial accountability; while others have experienced implementation problems which have undermined their results. This paper postulates that the cultural and institutional context within which hybrids operate may contribute to the implementation processes employed and the level of success attained. The paper explores hybrid arrangements through three cases of the use of inter-organisational arrangements in three different national contexts. Distilling the various elements of hybrids and the impact of institutional context will provide important insights for those charged with the responsibility for the formation and key infrastructure and public value development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The basic researches about constructability issue done in different countries demonstrate the potential power of this concept to affect the total goals of the construction projects which can lead to significant cost saving, time saving and better quality via considering the contractors’ construction experience in earlier construction project phases. The present research assesses the familiarity of Malaysian building contractors with constructability concept and activities; then it tests their general opinions on its implementation in different construction phases and projects. As the result, some descriptive studies are done on amount of contractors’ familiarity with this term among various kinds of contractors, projects and contracts which can illustrate constructability implementation level among Malaysian contractors. The results of this study show that Malaysian contractors are not all familiar enough with this term and there are still some barriers that prevent them from taking part in its activities completely. The differences in amount of familiarity with constructability matter and its terms of implementation are quite obvious among various types of participants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

After the primary researches on constructability issue which were implemented in United States, United Kingdom and Australia, more explorations were applied on that in order to assess this unique scientific fact in East Asian country of Malaysia. Based on the latest researches done on constructability concept in Malaysia, the most Critical Constructability Activities (CCAs) are defined according to amount of contractors’ participation in each activity and amount of gap between actual and potential effects of each of them on achieving the overall objectives of the construction projects with more cost and time savings and better quality which is the whole aim of a beneficial constructability activity. The present research aims to assess the current findings on CCAs in order to identify the types of contractors and projects which these CCAs are getting performed in and also the types of contracts is used in these CCAs. Finally it was found that there are some significant differences in amount of contractors’ involvement in CCAs among various considered independent variables. This study uses the former researches to help Malaysian construction stakeholders to find out the barriers of constructability implementation in building projects via giving more details on application of CCAs among different IVs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Skid resistance is a condition parameter characterising the contribution that a road makes to the friction between a road surface and a vehicle tyre. Studies of traffic crash histories around the world have consistently found that a disproportionate number of crashes occur where the road surface has a low level of surface friction and/or surface texture, particularly when the road surface is wet. Various research results have been published over many years and have tried to quantify the influence of skid resistance on accident occurrence and to characterise a correlation between skid resistance and accident frequency. Most of the research studies used simple statistical correlation methods in analysing skid resistance and crash data.----- ------ Preliminary findings of a systematic and extensive literature search conclude that there is rarely a single causation factor in a crash. Findings from research projects do affirm various levels of correlation between skid resistance and accident occurrence. Studies indicate that the level of skid resistance at critical places such as intersections, curves, roundabouts, ramps and approaches to pedestrian crossings needs to be well maintained.----- ----- Management of risk is an integral aspect of the Queensland Department of Main Roads (QDMR) strategy for managing its infrastructure assets. The risk-based approach has been used in many areas of infrastructure engineering. However, very limited information is reported on using risk-based approach to mitigate crash rates related to road surface. Low skid resistance and surface texture may increase the risk of traffic crashes.----- ----- The objectives of this paper are to explore current issues of skid resistance in relation to crashes, to provide a framework of probability-based approach to be adopted by QDMR in assessing the relationship between crash accidents and pavement properties, and to explain why the probability-based approach is a suitable tool for QDMR in order to reduce accident rates due to skid resistance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

QUT Library and the High Performance Computing and Research Support (HPC) Team have been collaborating on developing and delivering a range of research support services, including those designed to assist researchers to manage their data. QUT’s Management of Research Data policy has been available since 2010 and is complemented by the Data Management Guidelines and Checklist. QUT has partnered with the Australian Research Data Service (ANDS) on a number of projects including Seeding the Commons, Metadata Hub (with Griffith University) and the Data Capture program. The HPC Team has also been developing the QUT Research Data Repository based on the Architecta Mediaflux system and have run several pilots with faculties. Library and HPC staff have been trained in the principles of research data management and are providing a range of research data management seminars and workshops for researchers and HDR students.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It’s fast approaching the end of the year and the festive season, and I have a few things on my mind. First, how I’ll fit in all of my holiday plans and projects within my period of leave, which always seems to pass oh so quickly! But more important are the two issues of global financial uncertainty and safe travel. Judging by what is in the media, it appears to be proving difficult for any self respecting financial industry specialist to define and grapple with the so-called current economic crisis, let alone those of us who have not been formally and extensively schooled in the sciences of finance and economics. Perhaps the latter is even more of a “black art” than the discipline of transport planning. The situation has affected all of us with our superannuation and/or share portfolios; however, judging by the still-crowded shopping centres in many areas, the downstream general economic impacts appear to be less serious in Australia than in other developed countries, even with the significant market fluctuations taking place. There are many important decisions facing Australian governments, from the top down, on how they manage their budgets and spending. Infrastructure spending is in competition with other necessities such as the public health system and education. But it appears that infrastructure is an avenue of public spending that, over all time windows, may be able to significantly bolster local economies and that of the nation as a whole. This, however, is against the spectre of deficits. I would suggest that now, more than ever, we as transport and other professionals within the system, should use our knowledge and experience to take a key role in helping government and the private sector make sound decisions on infrastructure planning, delivery and management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Evaluation, selection and finally decision making are all among important issues, which engineers face in long run of projects. Engineers implement mathematical and nonmathematical methods to make accurate and correct decisions, whenever needed. As extensive as these methods are, effects of any selected method on outputs achieved and decisions made are still suspicious. This is more controversial and challengeable, where evaluation is made among non-quantitative alternatives. In civil engineering and construction management problems, criteria include both quantitative and qualitative ones, such as aesthetic, construction duration, building and operation costs, and environmental considerations. As the result, decision making frequently takes place among non-quantitative alternatives. It should be noted that traditional comparison methods, including clear-cut and inflexible mathematics, have always been criticized. This paper demonstrates a brief review of traditional methods of evaluating alternatives. It also offers a new decision making method using, fuzzy calculations. The main focus of this research is some engineering issues, which have flexible nature and vague borders. Suggested method provides analyzability of evaluation for decision makers. It is also capable to overcome multi criteria and multi-referees problems. In order to ease calculations, a program named DeMA is introduced.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.