774 resultados para Healthcare improvement
Resumo:
Introduction: Individuals with poor social determinants of health aremore likely to receive improper healthcare. Frequent Users (FUs) ofEmergency Departments (ED) (defined as >4 visits in the previous12 months) represent a subgroup of vulnerable patients presentingwith specific medical and social needs. They usually account for highhealthcare costs by overusing the healthcare system. In 2008-2009,FUs accounted for 4% of our ED patients but 17% of all our ED visits.Methods: We conducted a prospective cohort of patients admitted toour ED with vulnerabilities in ≥3 specific domains (somatic or mentaldiseases, risk behaviors, social determinants of health, and healthcareuse). Patients were either directly identified by a multidisciplinary team(two nurses, one social worker, one physician) or referred to that teamby the ED staff during opening hours from July 1st 2010 to April 30th2011.Results: 127 patients were included (67% males), aged 43 years (SD15); 65% were migrants. They had a median of 6 ED visits (interquartilerange (IQR) 8-1) in the previous 12 months, representing a total of 697visits. The most frequently affected domains during the index visit were:71% somatic, 61% psychiatric, 75% risk behaviors, 97% social and84% healthcare use issues. Each case required a median of 234minutes (IQR 300-90) dedicated to assess their outpatient network(99% of the patients), to set up an ambulatory medical follow-up (43%)or a meeting with social services (40%).Conclusions: Vulnerability affected ED patients in more than onedomain. Vulnerable patients have complex needs that were difficult toaddress in the time-pressured ED setting. Although ED consultationoffers immediate access to medical care, EDs are dedicated more foracute short-term somatic care. Caring for a growing number ofvulnerable patients requires a different type of management. Limitedevidence shows that multidisciplinary case-management interventionshave demonstrated positive outcomes in terms of reducing ED useand costs, and improvement of patient's medical and social outcomes.A randomized trial of case-management is underway to confirm theresults of observational studies.
Resumo:
The first part of a three year plan to evaluate and recommend improvements to Iowa's Juvenile Courts.
Resumo:
A report of a one year assessment of Iowa's Juvenile Courts handling of Child in Need of Assistance cases and a plan for improvement.
Resumo:
A plan for improvement of Iowa's Juvenile Courts handling of Child in Need of Assistance cases. A brief report focusing on just the plan for improvement pulled from the main report: A Study of Iowa's Court Performance in Child Abuse and Neglect Cases and Plan for Improvement.
Resumo:
Background and objective: Optimal care of diabetic patients (DPs) decreases the risk of complications. Close blood glucose monitoring can improve patient outcomes and shorten hospital stay. The objective of this pilot study was to evaluate the treatment of hospitalized DPs according to the current standards, including their diabetic treatment and drugs to prevent diabetes related complications [=guardian drugs: angiotensin converting enzyme inhibitors (ACEI) or Angiotensin II Receptor Blockers (ARB), antiplatelet drugs, statins]. Guidelines of the American Diabetes Association (ADA) [1] were used as reference as they were the most recent and exhaustive for hospital care. Design: Observational pilot study: analysis of the medical records of all DPs seen by the clinical pharmacists during medical rounds in different hospital units. An assessment was made by assigning points for fulfilling the different criteria according to ADA and then by dividing the total by the maximum achievable points (scale 0-1; 1 = all criteria fulfilled). Setting: Different Internal Medicine and Geriatric Units of the (multi-site) Ho^pital du Valais. Main outcome measures: - Completeness of diabetes-related information: type of diabetes, medical history, weight, albuminuria status, renal function, blood pressure, (recent) lipid profile. - Management of blood glucose: Hb1Ac, glycemic control, plan for treating hyper-/hypoglycaemia. - Presence of guardian drugs if indicated. Results: Medical records of 42 patients in 10 different units were analysed (18 women, 24 men, mean age 75.4 ± 11 years). 41 had type 2 diabetes. - Completeness of diabetes-related information: 0.8 ± 0.1. Information often missing: insulin-dependence (43%) and lipid profile (86%). - Management of blood glucose: 0.5 ± 0.2. 15 patients had suboptimal glycemic balance (target glycaemia 7.2-11.2 mmol/ l, with values[11.2 or\3.8 mmol/l, or Hb1Ac[7%), 10 patients had a deregulated balance (more than 10 values[11.2 mmol/l or \3.8 mmol/l and even values[15 mmol/l). - Presence of guardian drugs if indicated: ACEI/ARB: 19 of 23 patients (82.6%), statin: 16 of 40 patients (40%), antiplatelet drug: 16 of 39 patients (41%). Conclusions: Blood glucose control was insufficient in many DPs and prescription of statins and antiplatelet drugs was often missing. If confirmed by a larger study, these two points need to be optimised. As it is not always possible and appropriate to make those changes during hospital stay, a further project should assess and optimise diabetes care across both inpatient and outpatient settings.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
Concerning improvements to the State Capitol Grounds including placement of the Allison memorial and Soldiers and Sailor's momuments; removal of heating plant and relieving the state of coal, ashes, gas and smoke; provision of office space to the Adjutant General; an eventual executive mansion; provision of office buildings; and for a Supreme Court building where together with its library auxiliaries will have perpetual growth and constant accessbility; and propose restoration of natural scenic value of the capitol site.
Resumo:
On June 24, 2010, the Rebuild Iowa Office (RIO) held a discussion-based tabletop exercise for the purpose of creating a framework to support disaster recovery coordination within the State of Iowa. The purpose of this report is to provide an overview of the tabletop exercise, summarize and analyze exercise results, identify strengths which should be maintained and built upon, identify areas for further improvement, and support development of recommendations and corrective actions.
Resumo:
BACKGROUND: Exposure to urinary catheters is considered the most important risk factor for healthcare-associated urinary tract infection (UTI) and is associated with significant morbidity and substantial extra-costs. In this study, we assessed the impact of urinary catheterisation (UC) on symptomatic healthcare-associated UTI among hospitalized patients. METHODS: A nationwide period prevalence survey of healthcare-associated infections was conducted during 1 May to 30 June 2004 in 49 Swiss hospitals and included 8169 adult patients (4313 female; 52.8%) hospitalised in medical, surgical, intermediate, and intensive care wards. Additional data were collected on exposure to UC to investigate factors associated with UTI among hospitalised adult patients exposed and non-exposed to UC. RESULTS: 1917 (23.5%) patients were exposed to UC within the week prior to survey day; 126 (126/8169; 1.5%) developed UTI. Exposure to UC preceded UTI only in 73 cases (58%). By multivariate logistic regression analysis, UTI was independently associated with exposure to UC (odds ratio [OR], 3.9 [95% CI, 2.6-5.9]), female gender (OR, 2.1 [95% CI, 1.4-3.1]), an American Society of Anesthesiologists' score > 2 points (OR, 3.2 [95% CI, 1.1-9.4], and prolonged hospital stay >20 days (OR, 1.9 [95% CI, 1.4-3.2]. Further analysis showed that the only significant factor for UTI with exposure to UC use was prolonged hospital stay >40 days (OR, 2.9 [95% CI, 1.3-6.1], while female gender only showed a tendency (OR, 1.6 [95% CI, 1.0-2.7]. In the absence of exposure to UC, the only significant risk factor for UTI was female gender (OR, 3.3 [95% CI, 1.7-6.5]). CONCLUSIONS: Exposure to UC was the most important risk factor for symptomatic healthcare-associated UTI, but only concerned about half of all patients with UTI. Further investigation is warranted to improve overall infection control strategies for UTI.
Resumo:
This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).
Resumo:
A systematic method to improve the quality (Q) factor of RF integrated inductors is presented in this paper. The proposed method is based on the layout optimization to minimize the series resistance of the inductor coil, taking into account both ohmic losses, due to conduction currents, and magnetically induced losses, due to eddy currents. The technique is particularly useful when applied to inductors in which the fabrication process includes integration substrate removal. However, it is also applicable to inductors on low-loss substrates. The method optimizes the width of the metal strip for each turn of the inductor coil, leading to a variable strip-width layout. The optimization procedure has been successfully applied to the design of square spiral inductors in a silicon-based multichip-module technology, complemented with silicon micromachining postprocessing. The obtained experimental results corroborate the validity of the proposed method. A Q factor of about 17 have been obtained for a 35-nH inductor at 1.5 GHz, with Q values higher than 40 predicted for a 20-nH inductor working at 3.5 GHz. The latter is up to a 60% better than the best results for a single strip-width inductor working at the same frequency.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
Audit report on Mid-Iowa School Improvement Consortium, Carlisle, Iowa for the year ended June 30, 2010
Resumo:
Soil penetration resistance (PR) and the tensile strength of aggregates (TS) are commonly used to characterize the physical and structural conditions of agricultural soils. This study aimed to assess the functionality of a dynamometry apparatus by linear speed and position control automation of its mobile base to measure PR and TS. The proposed equipment was used for PR measurement in undisturbed samples of a clayey "Nitossolo Vermelho eutroférrico" (Kandiudalfic Eutrudox) under rubber trees sampled in two positions (within and between rows). These samples were also used to measure the volumetric soil water content and bulk density, and determine the soil resistance to penetration curve (SRPC). The TS was measured in a sandy loam "Latossolo Vermelho distrófico" (LVd) - Typic Haplustox - and in a very clayey "Nitossolo Vermelho distroférrico" (NVdf) - Typic Paleudalf - under different uses: LVd under "annual crops" and "native forest", NVdf under "annual crops" and "eucalyptus plantation" (> 30 years old). To measure TS, different strain rates were applied using two dynamometry testing devices: a reference machine (0.03 mm s-1), which has been widely used in other studies, and the proposed equipment (1.55 mm s-1). The determination coefficient values of the SRPC were high (R² > 0.9), regardless of the sampling position. Mean TS values in LVd and NVdf obtained with the proposed equipment did not differ (p > 0.05) from those of the reference testing apparatus, regardless of land use and soil type. Results indicate that PR and TS can be measured faster and accurately by the proposed procedure.