935 resultados para Acquisition du vocabulaire
Resumo:
This report is a detailed description of data processing of NOAA/MLML spectroradiometry data. It introduces the MLML_DBASE programs, describes the assembly of diverse data fues, and describes general algorithms and how individual routines are used. Definitions of data structures are presented in Appendices. [PDF contains 48 pages]
Resumo:
Titulo original : travels in brazil : in the years from 1809, to 1815.
Resumo:
Commercially available software packages for IBM PC-compatibles are evaluated to use for data acquisition and processing work. Moss Landing Marine Laboratories (MLML) acquired computers since 1978 to use on shipboard data acquisition (Le. CTD, radiometric, etc.) and data processing. First Hewlett-Packard desktops were used then a transition to the DEC VAXstations, with software developed mostly by the author and others at MLML (Broenkow and Reaves, 1993; Feinholz and Broenkow, 1993; Broenkow et al, 1993). IBM PC were at first very slow and limited in available software, so they were not used in the early days. Improved technology such as higher speed microprocessors and a wide range of commercially available software made use of PC more reasonable today. MLML is making a transition towards using the PC for data acquisition and processing. Advantages are portability and available outside support.
Resumo:
Laser interferometer gravitational wave observatory (LIGO) consists of two complex large-scale laser interferometers designed for direct detection of gravitational waves from distant astrophysical sources in the frequency range 10Hz - 5kHz. Direct detection of space-time ripples will support Einstein's general theory of relativity and provide invaluable information and new insight into physics of the Universe.
Initial phase of LIGO started in 2002, and since then data was collected during six science runs. Instrument sensitivity was improving from run to run due to the effort of commissioning team. Initial LIGO has reached designed sensitivity during the last science run, which ended in October 2010.
In parallel with commissioning and data analysis with the initial detector, LIGO group worked on research and development of the next generation detectors. Major instrument upgrade from initial to advanced LIGO started in 2010 and lasted till 2014.
This thesis describes results of commissioning work done at LIGO Livingston site from 2013 until 2015 in parallel with and after the installation of the instrument. This thesis also discusses new techniques and tools developed at the 40m prototype including adaptive filtering, estimation of quantization noise in digital filters and design of isolation kits for ground seismometers.
The first part of this thesis is devoted to the description of methods for bringing interferometer to the linear regime when collection of data becomes possible. States of longitudinal and angular controls of interferometer degrees of freedom during lock acquisition process and in low noise configuration are discussed in details.
Once interferometer is locked and transitioned to low noise regime, instrument produces astrophysics data that should be calibrated to units of meters or strain. The second part of this thesis describes online calibration technique set up in both observatories to monitor the quality of the collected data in real time. Sensitivity analysis was done to understand and eliminate noise sources of the instrument.
Coupling of noise sources to gravitational wave channel can be reduced if robust feedforward and optimal feedback control loops are implemented. The last part of this thesis describes static and adaptive feedforward noise cancellation techniques applied to Advanced LIGO interferometers and tested at the 40m prototype. Applications of optimal time domain feedback control techniques and estimators to aLIGO control loops are also discussed.
Commissioning work is still ongoing at the sites. First science run of advanced LIGO is planned for September 2015 and will last for 3-4 months. This run will be followed by a set of small instrument upgrades that will be installed on a time scale of few months. Second science run will start in spring 2016 and last for about 6 months. Since current sensitivity of advanced LIGO is already more than factor of 3 higher compared to initial detectors and keeps improving on a monthly basis, upcoming science runs have a good chance for the first direct detection of gravitational waves.
Resumo:
Utilization of the heavy isotope of nitrogen as a tracer has found numerous applications in soil biology. It allows better definition of different stages of the nitrogen cycle, in particular the immobilization-mineralization cycle. In this work, the authors report the results of calculations of natural isotope ratios of nitrogen in samples of water, soil and vegetation prevailing in Dombes and discuss the possibilities of errors and coefficients of fractionation.
Resumo:
Ce rapport présente les activités et les résultats de l’atelier Vision 2050: Changement climatique, pêche et aquaculture en Afrique de l’Ouest. Les objectifs de l’atelier étaient de discuter les questions critiques et les incertitudes auxquelles est confronté le secteur de la pêche et de l’aquaculture au Ghana, au Sénégal et en Mauritanie, d’élaborer des scénarios sectoriels pour 2050 et de discuter de l’implication de ces scénarios dans le contexte du changement climatique pour ces pays et la région ouest africaine.
Resumo:
252 p. : il.