829 resultados para software management methodology
Resumo:
The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.
Resumo:
Purpose – The purpose of this paper is to develop an effective methodology for implementing lean manufacturing strategies and a leanness evaluation metric using continuous performance measurement (CPM). Design/methodology/approach – Based on five lean principles, a systematic lean implementation methodology for manufacturing organizations has been proposed. A simplified leanness evaluation metric consisting of both efficiency and effectiveness attributes of manufacturing performance has been developed for continuous evaluation of lean implementation. A case study to validate the proposed methodology has been conducted and proposed CPM metric has been used to assess the manufacturing leanness. Findings – Proposed methodology is able to systematically identify manufacturing wastes, select appropriate lean tools, identify relevant performance indicators, achieve significant performance improvement and establish lean culture in the organization. Continuous performance measurement matrices in terms of efficiency and effectiveness are proved to be appropriate methods for continuous evaluation of lean performance. Research limitations/implications – Effectiveness of the method developed has been demonstrated by applying it in a real life assembly process. However, more tests/applications will be necessary to generalize the findings. Practical implications – Results show that applying the methods developed, managers can successfully identify and remove manufacturing wastes from their production processes. By improving process efficiency, they can optimize their resource allocations. Manufacturers now have a validated step by step methodology for successfully implementing lean strategies. Originality/value – According to the authors’ best knowledge, this is the first known study that proposed a systematic lean implementation methodology based on lean principles and continuous improvement techniques. Evaluation of performance improvement by lean strategies is a critical issue. This study develops a simplified leanness evaluation metric considering both efficiency and effectiveness attributes and integrates it with the lean implementation methodology.
Resumo:
The aim of this study was to conduct a systematic literature review of research-based studies to identify practices designed to meet the specific care needs of older cognitively impaired patients in emergency departments (ED). A systematic literature review of studies was completed using PRIMSA methodology. The search criteria included articles from both emergency and acute care settings. A total of 944 articles were screened, and a total of 43 articles were identified as eligible. The review found a number of intervention studies to improve quality of care for older persons with cognitive impairment carried out or commenced in emergency settings, including interventions to improve cognitive impairment recognition (n = 9) and clinical approaches to reduce falls (n = 1) and both delirium incidence and prevalence (n = 2). Relevant studies carried out in acute care settings regarding cognitive impairment recognition (n = 4) and primary and secondary prevention of delirium (n = 18) and intervention studies that reduced the prescription of deliriogenic drugs (n = 1), reduced behavioral symptoms and discomfort (n = 7), and improved nutritional intake (n = 1) in hospitalized older persons with dementia were also identified. There is limited research available that reports interventions that improve the quality of care of older ED patients with cognitive impairment. Although this review found evidence obtained from the acute care setting, additional research is needed to identify whether these interventions are beneficial in fast-paced emergency settings.
Resumo:
In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.
Resumo:
This paper presents an illustrative demonstration of the qualitative data analysis tool NVivo (version 2.0), as employed across a multi-method research design as a comprehensive tool in support of overall research management. The paper will be of interest to (a) novice researchers, as a reference in their research design efforts; (b) academics, involved in research training, where this narrative can be used as a rich teaching case and; potentially to (c) vendors, of similar software tools, who may identify potential new tool applications and valuable tool enhancements.
Resumo:
Objective To evaluate the current management of over-the-counter (OTC) insomnia complaints in Australian community pharmacies using standardized patient methodology. Methods Trained standardized patients visited a sample of 100 randomly selected South East Queensland community pharmacies in June 2011. The standardized patients enacted two OTC insomnia scenarios: a direct product request (DPR) (n = 50) and a symptom-based request (SBR) (n = 50). Results of the interactions were documented immediately after each visit and evaluated using the Pharmaceutical Society of Australia's WHAT STOP GO protocol as a standard comparison. Key findings Of all DPRs, 30% were handled entirely by the pharmacist, 70% of staff enquired about specific symptoms and 28% investigated the cause of insomnia. No staff investigated the frequency of product use. The DPR scenario resulted in a 92% supply of the requested doxylamine product (Restavit). In the SBR scenario, 18% of requests were handled entirely by the pharmacist, 58% of staff enquired about specific symptoms and 44% investigated the cause of insomnia. Staff recommended medicated products (38%), or herbal (78%) or non-drug techniques (18%). Investigation into smoking and alcohol intake was not undertaken in DPR or SBR interactions, while questioning on caffeine intake was undertaken in 2 and 14% of cases respectively. There were no significant differences found in the handling of sleep requests by pharmacists compared to pharmacy assistants. Conclusion The standardized patient methodology was a successful way to assess the community pharmacy counselling provided with OTC sleep requests and suboptimal staff responses were found when compared with recommended practice standards.
Resumo:
The policies and regulations governing the practice of state asset management have emerged as an urgent question among many countries worldwide for there is heightened awareness of the complex and crucial role that state assets play in public service provision. Indonesia is an example of such country, introducing a ‘big-bang’ reform in state asset management laws, policies, regulations, and technical guidelines. Indonesia exemplified its enthusiasm in reforming state asset management policies and practices through the establishment of the Directorate General of State Assets in 2006. The Directorate General of State Assets have stressed the new direction that it is taking state asset management laws and policies through the introduction of Republic of Indonesia Law Number 38 Year 2008, which is an amended regulation overruling Republic of Indonesia Law Number 6 Year 2006 on Central/Regional Government State Asset Management. Law number 38/2008 aims to further exemplify good governance principles and puts forward a ‘the highest and best use of assets’ principle in state asset management. The purpose of this study is to explore and analyze specific contributing influences to state asset management practices, answering the question why innovative state asset management policy implementation is stagnant. The methodology of this study is that of qualitative case study approach, utilizing empirical data sample of four Indonesian regional governments. Through a thematic analytical approach this study provides an in-depth analysis of each influencing factors to state asset management reform. Such analysis suggests the potential of an ‘excuse rhetoric’; whereby the influencing factors identified are a smoke-screen, or are myths that public policy makers and implementers believe in, as a means to ex-plain stagnant implementation of innovative state asset management practice. Thus this study offers deeper insights of the intricate web that influences state as-set management innovative policies to state asset management policy makers; to be taken into consideration in future policy writing.
Resumo:
Purpose The paper examines the impact of internal auditors’ involvement in Enterprise Risk Management (ERM) on perceptions of their willingness to report a breakdown in risk procedures and whether a strong relationship with the audit committee affects such willingness to report. The study also investigates the use of ERM and the role of internal audit in ERM in Australian private and public sector entities. Design/methodology/approach The study uses an experimental design, manipulating (i) the internal auditor’s involvement in ERM and (ii) the strength of the relationship between internal audit and the audit committee. Participants are 117 certified internal auditors. The study also gathers descriptive data on the use of ERM. Findings The study indicates that a high involvement in ERM impacts the perceptions of internal auditors’ willingness to report a breakdown in risk procedures to the audit committee. However, a strong relationship with the audit committee does not appear to affect their perceived willingness to report. The study also finds that the majority of organisations have recently adopted ERM. Internal auditors are involved in ERM assurance activities but some also engage in activities that could compromise objectivity.
Resumo:
Safety of repair, maintenance, alteration, and addition (RMAA) works have long been neglected because RMAAworks are often minute and only last for a short period of time. With rising importance of the RMAA sector in many developed societies, safety of RMAA works has begun to draw attention. Many RMAA contracting companies are small- and medium-sized enterprises (SMEs) that do not have comprehensive safety management systems. Existing safety legislation and regulations for new construction sites are not fully applicable to RMAAworks. Instead of relying on explicit and well-established safety systems, tacit safety knowledge plays an extremely important role in RMAA projects. To improve safety of RMAAworks, safety knowledge should be better managed. However, safety knowledge is difficult to capture in RMAA works. This study aims to examine safety management practices of RMAA contracting companies to see how safety knowledge of RMAA projects is managed. Findings show that RMAA contracting companies undertaking large-scale RMAA projects have more initiatives of safety management. Safety management of small-scale RMAA works relies heavily on the motivation of site supervisors and self-regulation of workers. Better tacit knowledge management improves safety performance. To enhance safety capability of RMAA contracting companies, a knowledge sharing culture should be cultivated. The government should provide assistance to SMEs to implement proper safety management practices in small-sized projects. Potentials of applying computer software technology in RMAA projects to capture, store, and retrieve safety information should be explored. Employees should be motivated to share safety knowledge by giving proper recognition to those who are willing to share.
Resumo:
The interest in utilising multiple heterogeneous Unmanned Aerial Vehicles (UAVs) in close proximity is growing rapidly. As such, many challenges are presented in the effective coordination and management of these UAVs; converting the current n-to-1 paradigm (n operators operating a single UAV) to the 1-to-n paradigm (one operator managing n UAVs). This paper introduces an Information Abstraction methodology used to produce the functional capability framework initially proposed by Chen et al. and its Level Of Detail (LOD) indexing scale. This framework was validated through comparing the operator workload and Situation Awareness (SA) of three experiment scenarios involving multiple autonomously heterogeneous UAVs. The first scenario was set in a high LOD configuration with highly abstracted UAV functional information; the second scenario was set in a mixed LOD configuration; and the final scenario was set in a low LOD configuration with maximal UAV functional information. Results show that there is a significant statistical decrease in operator workload when a UAV’s functional information is displayed at its physical form (low LOD - maximal information) when comparing to the mixed LOD configuration.
Resumo:
Purpose This paper aims to identify, through a literature review, key issues regarding how online role plays can be designed and to apply them when designing a role play on conflict management. Design/methodology/approach By drawing on the key issues identified in the literature review, a role play on conflict management was designed and evaluated. Data were collected by developing a survey that focused on perceived learning, participation and satisfaction. Findings Overall, a majority of the students felt that they learned and participated in the role play. The most positive finding was that the students were satisfied with their role play experience. Research limitations/implications Researchers are urged to further develop the dimensions and measures of online role play success. The measures that were developed for evaluating perceived learning, participation and satisfaction with role plays can be further developed and tested. It is suggested that the effects on learning need to be further explored. Practical implications It is suggested that teachers take the identified key issues of online role play design into account. An important challenge seems to be to encourage students to reflect and do additional reading and research in relation with online role plays. Originality/value Online collaboration is commonly argued as beneficial from an e-learning perspective. However, a challenge for research and practice is to learn how collaborative e-learning activities may be developed. This paper contributes by focusing on how online role plays can be designed and evaluated.
Resumo:
Most of existing motorway traffic safety studies using disaggregate traffic flow data aim at developing models for identifying real-time traffic risks by comparing pre-crash and non-crash conditions. One of serious shortcomings in those studies is that non-crash conditions are arbitrarily selected and hence, not representative, i.e. selected non-crash data might not be the right data comparable with pre-crash data; the non-crash/pre-crash ratio is arbitrarily decided and neglects the abundance of non-crash over pre-crash conditions; etc. Here, we present a methodology for developing a real-time MotorwaY Traffic Risk Identification Model (MyTRIM) using individual vehicle data, meteorological data, and crash data. Non-crash data are clustered into groups called traffic regimes. Thereafter, pre-crash data are classified into regimes to match with relevant non-crash data. Among totally eight traffic regimes obtained, four highly risky regimes were identified; three regime-based Risk Identification Models (RIM) with sufficient pre-crash data were developed. MyTRIM memorizes the latest risk evolution identified by RIM to predict near future risks. Traffic practitioners can decide MyTRIM’s memory size based on the trade-off between detection and false alarm rates. Decreasing the memory size from 5 to 1 precipitates the increase of detection rate from 65.0% to 100.0% and of false alarm rate from 0.21% to 3.68%. Moreover, critical factors in differentiating pre-crash and non-crash conditions are recognized and usable for developing preventive measures. MyTRIM can be used by practitioners in real-time as an independent tool to make online decision or integrated with existing traffic management systems.
Resumo:
Knowledge Management (KM) is vital factor to successfully undertake projects. The temporary nature of projects necessitates employing useful KM practices to reduce any issues such as knowledge leakiness and rework. The Project Management Office (PMO) is a unit within organisations to facilitate and oversee organisational projects. Project Management Maturity Models (PMMM) show the development of PMOs from immature to mature levels. The existing PMMMs have focused on discussing Project Management (PM) practices, however, the management of project knowledge is yet to be addressed, at various levels of maturity. A research project was undertaken to investigate the mentioned gap for addressing KM practices at the existing PMMMs. Due to the exploratory and inductive nature of this research, qualitative methods using case studies were chosen as the research methodology to investigate the problem in the real world. In total, three cases selected from different industries: research; mining and government organisations, to provide broad categories for research and research questions were examined using the developed framework. This paper presents the findings from the investigation of the research organisation with the lowest level of maturity. From KM process point of view, knowledge creation and capturing are the most important processes, while knowledge transferring and reusing received less attention. In addition, it was revealed that provision of “knowledge about client” and “project management knowledge” are the most important types of knowledge that are required at this level of maturity. The results also revealed that PMOs with higher maturity level have better knowledge management, however, some improvement is needed. In addition, the importance of KM processes varies at different levels of maturity. In conclusion, the outcomes of this paper could provide powerful guidance to PMOs at lowest level of maturity from KM point of view.
Resumo:
Purpose The purpose of this paper is to foster a common understanding of business process management (BPM) by proposing a set of ten principles that characterize BPM as a research domain and guide its successful use in organizational practice. Design/methodology/approach The identification and discussion of the principles reflects our viewpoint, which was informed by extant literature and focus groups, including 20 BPM experts from academia and practice. Findings We identify ten principles which represent a set of capabilities essential for mastering contemporary and future challenges in BPM. Their antonyms signify potential roadblocks and bad practices in BPM. We also identify a set of open research questions that can guide future BPM research. Research limitation/implication Our findings suggest several areas of research regarding each of the identified principles of good BPM. Also, the principles themselves should be systematically and empirically examined in future studies. Practical implications – Our findings allow practitioners to comprehensively scope their BPM initiatives and provide a general guidance for BPM implementation. Moreover, the principles may also serve to tackle contemporary issues in other management areas. Originality/value This is the first paper that distills principles of BPM in the sense of both good and bad practice recommendations. The value of the principles lies in providing normative advice to practitioners as well as in identifying open research areas for academia, thereby extending the reach and richness of BPM beyond its traditional frontiers.
Resumo:
MOST PAN stages in Australian factories use only five or six batch pans for the high grade massecuite production and operate these in a fairly rigid repeating production schedule. It is common that some of the pans are of large dropping capacity e.g. 150 to 240 t. Because of the relatively small number and large sizes of the pans, steam consumption varies widely through the schedule, often by ±30% about the mean value. Large fluctuations in steam consumption have implications for the steam generation/condensate management of the factory and the evaporators when bleed vapour is used. One of the objectives of a project to develop a supervisory control system for a pan stage is to (a) reduce the average steam consumption and (b) reduce the variation in the steam consumption. The operation of each of the high grade pans within the schedule at Macknade Mill was analysed to determine the idle (or buffer) time, time allocations for essential but unproductive operations (e.g. pan turn round, charging, slow ramping up of steam rates on pan start etc.), and productive time i.e. the time during boil-on of liquor and molasses feed. Empirical models were developed for each high grade pan on the stage to define the interdependence of the production rate and the evaporation rate for the different phases of each pan’s cycle. The data were analysed in a spreadsheet model to try to reduce and smooth the total steam consumption. This paper reports on the methodology developed in the model and the results of the investigations for the pan stage at Macknade Mill. It was found that the operation of the schedule severely restricted the ability to reduce the average steam consumption and smooth the steam flows. While longer cycle times provide increased flexibility the steam consumption profile was changed only slightly. The ability to cut massecuite on the run among pans, or the use of a high grade seed vessel, would assist in reducing the average steam consumption and the magnitude of the variations in steam flow.