Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.
Resumo:
Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.
Resumo:
Current e-learning systems are increasing their importance in higher education. However, the state of the art of e-learning applications, besides the state of the practice, does not achieve the level of interactivity that current learning theories advocate. In this paper, the possibility of enhancing e-learning systems to achieve deep learning has been studied by replicating an experiment in which students had to learn basic software engineering principles. One group learned these principles using a static approach, while the other group learned the same principles using a system-dynamics-based approach, which provided interactivity and feedback. The results show that, quantitatively, the latter group achieved a better understanding of the principles; furthermore, qualitatively, they enjoyed the learning experience
Resumo:
What happens when digital coordination practices are introduced into the institutionalized setting of an engineering project? This question is addressed through an interpretive study that examines how a shared digital model becomes used in the late design stages of a major station refurbishment project. The paper contributes by mobilizing the idea of ‘hybrid practices’ to understand the diverse patterns of activity that emerge to manage digital coordination of design. It articulates how engineering and architecture professions develop different relationships with the shared model; the design team negotiates paper-based practices across organizational boundaries; and diverse practitioners probe the potential and limitations of the digital infrastructure. While different software packages and tools have become linked together into an integrated digital infrastructure, these emerging hybrid practices contrast with the interactions anticipated in practice and policy guidance and presenting new opportunities and challenges for managing project delivery. The study has implications for researchers working in the growing field of empirical work on engineering project organizations as it shows the importance of considering, and suggests new ways to theorise, the introduction of digital coordination practices into these institutionalized settings.
Resumo:
Purpose– The purpose of this paper is to shed new light on the link between diversity in project teams and team performance by examining the effects of players’ international career diversity on the performance of national football teams. Design/methodology/approach– The paper draws upon the literature on project organizations and experiential diversity in teams. Using data on players’ international career backgrounds and team performance from the FIFA World Cup 2006, the authors test two hypotheses linking experiential diversity in teams and a measure of relative team performance. The dataset includes detailed individual background profiles of the 736 participating players and performance data from the 64 games played at the tournament. Findings– The findings suggest that different types of experiential diversity have contrasting effects on team performance in a time‐limited project team setting. Research limitations/implications– These findings encourage team diversity researchers to further examine the impact of experiential diversity in teams on team process and performance outcomes in future research. Practical implications– The findings particularly highlight the need to carefully manage experiential diversity in project team settings in order to benefit from access to diverse tacit resources, while at the same time avoiding that the integrative capacities of teams becoming overstretched. Originality/value– The paper is a step towards a better understanding of how diversity of individual career backgrounds affects team performance outcomes in project teams.
Resumo:
We evaluate the ability of process based models to reproduce observed global mean sea-level change. When the models are forced by changes in natural and anthropogenic radiative forcing of the climate system and anthropogenic changes in land-water storage, the average of the modelled sea-level change for the periods 1900–2010, 1961–2010 and 1990–2010 is about 80%, 85% and 90% of the observed rise. The modelled rate of rise is over 1 mm yr−1 prior to 1950, decreases to less than 0.5 mm yr−1 in the 1960s, and increases to 3 mm yr−1 by 2000. When observed regional climate changes are used to drive a glacier model and an allowance is included for an ongoing adjustment of the ice sheets, the modelled sea-level rise is about 2 mm yr−1 prior to 1950, similar to the observations. The model results encompass the observed rise and the model average is within 20% of the observations, about 10% when the observed ice sheet contributions since 1993 are added, increasing confidence in future projections for the 21st century. The increased rate of rise since 1990 is not part of a natural cycle but a direct response to increased radiative forcing (both anthropogenic and natural), which will continue to grow with ongoing greenhouse gas emissions
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.
Resumo:
The literature has emphasized that absorptive capacity (AC) leads to performance, but in projects its influences still unclear. Additionally, the project success is not well understood by the literature, and AC can be an important mechanism to explain it. Therefore, the purpose of this study is to investigate the effect of absorptive capacity on project performance in the construction industry of São Paulo State. We study this influence through potential and realized absorptive capacity proposed by Zahra and George (2002). For achieving this goal, we use a combination of qualitative and quantitative research. The qualitative research is based on 15 interviews with project managers in different sectors to understand the main constructs and support the next quantitative phase. The content analysis was the technique used to analyze those interviews. In quantitative phase through a survey questionnaire, we collected 157 responses in the construction sector with project managers. The confirmatory factor analysis and hierarchical linear regression were the techniques used to assess the data. Our findings suggest that the realized absorptive capacity has a positive influence on performance, but potential absorptive capacity and the interactions effect have no influence on performance. Moreover, the planning and monitoring have a positive impact on budget and schedule, and customer satisfaction while risk coping capacity has a positive impact on business success. In academics terms, this research enables a better understanding of the importance of absorptive capacity in the construction industry and it confirms that knowledge application in processes and routines enhances performance. For management, the absorptive capacity enables the improvements of internal capabilities reflected in the increased project management efficiency. Indeed, when a company manages project practices efficiently it enhances business and project performance; however, it needs initially to improve its internal abilities to enrich processes and routines through relevant knowledge.
Resumo:
In a world where organizations are ever more complex the need for the knowledge of the organizational self is a growing necessity. The DEMO methodology sets a goal in achieving the specification of the organizational self capturing the essence of the organization in way independent of its implementation and also coherent, consistent, complete, modular and objective. But having such organization self notion is of little meaning if this notion is not shared by the organization actors. To achieve this goal in a society that has grown attached to technology and where time is of utmost importance, using a tool such as a semantic Wikipedia may be the perfect way of making the information accessible. However, to establish DEMO methodology in such platform there is a need to create bridges between its modeling components and semantic Wikipedia. It’s in that aspect that our thesis focuses, trying to establish and implement, using a study case, the principles of a way of transforming the DEMO methodology diagrams in comprehensive pages on semantic Wikipedia but keeping them as abstract as possible to allow expansibility and generalization to all diagrams without losing any valuable information so that, if that is the wish, those diagrams may be recreated from the semantic pages and make this process a full cycle.